Task Order Performance Work Statement Template - Prismax - Thermax
Updated
A PDF document (416 KB) attached to Notice Of Intent to Sole Source Vantive PRISMAX & THERMAX Service, from the Defense Health Agency (DHA). Due Nov 19, 2026, 8:00 AM (UTC-5).
File name: Task Order PWS Template - Prismax - Thermax.pdf
The full file is for paid members, or buy this bid alone.
Preview
Department of Defense
Defense Health Agency
Medical Q-Coded Support & Services – Next
Generation (MQS2-NG)
Type I Configuration - Task Order (TO) Performance
Work Statement (PWS) Template (as of: 15 Jan 2025)
Service:
Prismax & Thermax Warming/Cooling Equipment; Hypercare Full Service Maintenance Contract
Location:
Naval Medical Center San Diego / Intensive Care Unit
Date:
JUNE 29, 2026
PART 1 PERFORMANCE WORK STATEMENT
The contractor shall provide all services, materials and equipment necessary for the repair/maintenance of the (2) Baxter Prismax Hemodialysis units and their components, (2) Baxter Blood warming units located at Naval Medical Readiness and Training Center (NMRTC) San Diego Intensive Care Unit– BLDG 1, 4th floor or BIOMED Engineering located in MQS2-NG Task Order Template Type I Configuration as of 12 Feb 25
bldg. 1, ground floor, San Diego CA to ensure dependable and reliable equipment operation. The scope of work performed under these specifications includes the furnishing of all labor, and parts to perform all repairs on equipment listed, to assure continued operation at their designed efficiency and capacity.
NO.
ECN
174062
174063
174064
174065
SERIAL NUMBER
PX205218
PX205215
TX205357
TX205356
MODEL
MFR
955724
955724
955630
955630
Baxter
Baxter
Baxter
Baxter
PREVENTIVE MAINTENANCE:
•
Perform service repair/maintenance to industry standards. •
Ensure that only FULLY QUALIFIED FIELD ENGINEERS and
TECHNICIANS who have gone through original equipment manufacturer (OEM) or comparable third-party service schools for the above mentioned equipment, shall be employed in the performance of any and all work performed under this contract. Upon request, the contractor shall provide training certificates (or notarized copies) to the Biomed Repair Division for verification. The highest standard of professional capability and electrical/mechanical workmanship is to be maintained throughout the life of this contract.
•
Make repairs to the extent necessary (as determined by inspection tests or disassembly) to ensure a functional system that will efficiently serve its intended purpose.
•
All travel, on-site labor and repair parts needed to perform repairs. •
One scheduled preventive maintenance check according to Manufacturer.
•
24 x 7 Telephone Technical Support
•
Extend to the Government all commercial warranties on replacement parts, consistent with standard industry practices.
MQS2-NG Task Order Template Type I Configuration as of 12 Feb 25
The beginning of the document. Download the full file to read on.