TE #3 Supply Requirements with Incidental Services Scope Supply of Footing Materials and Construction of Block Foundations for Model Modular Training Venues
Federal Law Enforcement Training Centers (FLETC)
1. Purpose
This Statement of Work establishes the requirements for supplying footing materials and constructing the complete block foundations supporting non-habitable modular training venues.
2. The supplies required represent the supplies to complete an in-house government design. Any alternatives must be substituted into the government design plan without any alterations and ensure intent of design remains unchanged.
3. Scope
The Contractor shall furnish all concrete, reinforcing steel, masonry block, mortar, sand, sill materials, anchor bolts, and related supplies necessary to support construction of three modular home foundations. The Government will construct all concrete footings using Contractor-supplied concrete and rebar. The Contractor shall construct all block foundations, install all anchor bolts, and provide all sill materials. The Government will install the insulation and the pressure-treated sill plate after the Contractor delivers all sill materials.
4. Modular Home Specifications- Please see TE#1 for Submission Specification Sheet required for submission.
The following specifications apply to all three training venues. Below are the Requested Brand Name and Model. Any alternate Brand Name or Model must meet or exceed the required specifications. The following model represents all requirements and fits the government design build.
Model: Cherry Blossom
Manufacturer: Clayton Venues
Dimensions per home: 28 feet by 56 feet (approximately 1,475 square feet) Included Features
• Luxury Vinyl Plank flooring throughout
• Closed-cell spray foam insulation in ceiling
• Three 50-inch televisions
• Washer and dryer
• Fully installed HVAC system
• Delivery and factory setup included
• No plumbing line required for this training installation
5. Other Required supplies.
Furnish and deliver all listed supplies in the quantities and specifications described. Ensure all products meet or exceed ASTM and American Concrete Institute (ACI) standards for structural and finishing materials. Provide Material Safety Data Sheets (MSDS) for all sealants, adhesives, and other chemical products. Coordinate all delivery scheduling with the FLETC Training Support Division to prevent disruption to ongoing training operations. All materials shall be delivered and staged