TMM 2515 Architecture BID DOCUMENTS
Updated
A PDF document (7.6 MB) attached to Project 629-25-104 ED Suicide Risk Mitigation Fence, from the Department of Veterans Affairs. Due Nov 23, 2026, 2:00 PM (UTC-6).
File name: TMM 2515_Architecture_BID DOCUMENTS.pdf
The full file is for paid members, or buy this bid alone.
Preview
A
A
ED DRIVE SUICIDE MITIGATION
SOUTHEAST LOUSIANA VETERANS HEALTH CARE SYSTEM
2400 CANAL ST, NEW ORLEANS, LA 70119
PROJECT NUMBER: 629-25-104
BID DOCUMENTS
B
B
C
C
INDEX OF DRAWINGS
SHEET
NO.
SHEET
NO.
DRAWING TITLE
DRAWING TITLE
GENERAL
GI001
GI002
COVER SHEET
LEGENDS, ABBREVIATIONS AND NOTES
AE101
AE102
AE201
AE202
AE451
AE502
ARCHITECTURAL
PARTIAL FLOOR PLAN - SECOND LEVEL NORTH END
PARTIAL FLOOR PLAN - SECOND LEVEL SOUTH END
EXTERIOR ELEVATIONS - WEST AND NORTH
EXTERIOR ELEVATIONS - EAST AND SOUTH
INTERIOR ELEVATIONS
DETAILS
D
D
E
E
PROJECT LOCATION
PROJECT LOCATION
F
TRUE
NORTH
AREA MAP
PLAN
NORTH
NOT TO SCALE
CONSULTANT
TRUE
NORTH
F
LOCATION MAP
PLAN
NORTH
NOT TO SCALE
ARCHITECT/ENGINEER OF RECORD
Office of
Construction and
Facilities
Management
STAMP
512 MEANS ST NW
STE. 400
ATLANTA, GA 30318
REVISIONS:
VA FORM 08-6231
Phase
COVER SHEET
BID DOCUMENTS
Approved Project Director
Project Title:
Project Number
ED DRIVE SUICIDE MITIGATION
629-25-104
Building Number
Drawing Number
Location
NEW ORLEANS, LA
U.S. Department of
Veterans Affairs
DATE:
Drawing Title:
Issue Date
Checked
Drawn
04-09-2026
SV
SV,ZN
GI001
GENERAL STRUCTURAL NOTES
EXISTING CONDITIONS
DESIGN CODES
1.01
1.01
A
1.02
1.03
1.04
AS WITH ANY WORK AFFECTING EXISTING CONSTRUCTION, UNFORESEEN CONDITIONS ARE UNAVOIDABLE WITHOUT DEMOLISHING OTHERWISE SERVICEABLE CONSTRUCTION, DISRUPTING OCCUPIED OPERATIONS AND INCURRING SIGNIFICANT COST FOR CLOSE UP EXAMINATION AND NON-DESTRUCTIVE TESTING DURING THE DESIGN STAGE.
WITH THE PASSAGE OF TIME SINCE THE CREATION OF AS-BUILT DRAWINGS AND/OR THE DESIGNERS SURVEY, BOTH CONCEALED AND VISIBLE CONDITIONS MAY HAVE CHANGED DUE TO ALTERATIONS, ADDITIONS, RENOVATIONS AND DETERIORATION.
PRIOR TO THE COMMENCEMENT OF ANY WORK IN PREPARATION OF CONSTRUCTION RELATED ACTIVITIES, INCLUDING BUT NOT LIMITED TO SHOP DRAWING PREPARATION, ALL BURIED, EMBEDDED, AND CONCEALED ITEMS LIKELY TO BE ENCOUNTERED DURING CONSTRUCTION SHALL BE LOCATED AND MARKED ON THE SURFACE. THIS WORK SHALL BE ACCOMPLISHED BY DESTRUCTIVE AND/OR NON-DESTRUCTIVE MEANS WITHOUT IMPAIRING THE STRUCTURAL INTEGRITY OF THE ASSOCIATED MEMBERS. SHORING AS REQUIRED SHALL BE DESIGNED BY A PROFESSIONAL STRUCTURAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT, AND FURNISHED AND INSTALLED AT NO ADDITIONAL COST. EXISTING CONDITIONS THAT INTERFERE OR OTHERWISE AFFECT THE DESIGN, CONSTRUCTION OR SERVICEABILITY OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE COR, INCLUDING PLAN AND SECTION SKETCHES, IMMEDIATELY FOR RESOLUTION. THE CONTRACTOR SHALL ALLOW TWO CALENDAR
The beginning of the document. Download the full file to read on.