A

A

ED DRIVE SUICIDE MITIGATION

SOUTHEAST LOUSIANA VETERANS HEALTH CARE SYSTEM

2400 CANAL ST, NEW ORLEANS, LA 70119

PROJECT NUMBER: 629-25-104

BID DOCUMENTS

B

B

C

C

INDEX OF DRAWINGS

SHEET

NO.

SHEET

NO.

DRAWING TITLE

DRAWING TITLE

GENERAL

GI001
GI002

COVER SHEET

LEGENDS, ABBREVIATIONS AND NOTES

AE101
AE102
AE201
AE202
AE451
AE502

ARCHITECTURAL

PARTIAL FLOOR PLAN - SECOND LEVEL NORTH END

PARTIAL FLOOR PLAN - SECOND LEVEL SOUTH END

EXTERIOR ELEVATIONS - WEST AND NORTH

EXTERIOR ELEVATIONS - EAST AND SOUTH

INTERIOR ELEVATIONS

DETAILS

D

D

E

E

PROJECT LOCATION

PROJECT LOCATION

F

TRUE

NORTH

AREA MAP

PLAN

NORTH

NOT TO SCALE

CONSULTANT

TRUE

NORTH

F

LOCATION MAP

PLAN

NORTH

NOT TO SCALE

ARCHITECT/ENGINEER OF RECORD

Office of
Construction and
Facilities
Management

STAMP

512 MEANS ST NW

STE. 400

ATLANTA, GA 30318

REVISIONS:

VA FORM 08-6231

Phase

COVER SHEET

BID DOCUMENTS

Approved Project Director

Project Title:

Project Number

ED DRIVE SUICIDE MITIGATION

629-25-104
Building Number

Drawing Number

Location

NEW ORLEANS, LA

U.S. Department of
Veterans Affairs

DATE:

Drawing Title:

Issue Date

Checked

Drawn

04-09-2026

SV

SV,ZN

GI001

GENERAL STRUCTURAL NOTES

EXISTING CONDITIONS

DESIGN CODES

1.01

1.01

A
1.02
1.03

1.04

AS WITH ANY WORK AFFECTING EXISTING CONSTRUCTION, UNFORESEEN CONDITIONS ARE UNAVOIDABLE WITHOUT DEMOLISHING OTHERWISE SERVICEABLE CONSTRUCTION, DISRUPTING OCCUPIED OPERATIONS AND INCURRING SIGNIFICANT COST FOR CLOSE UP EXAMINATION AND NON-DESTRUCTIVE TESTING DURING THE DESIGN STAGE.
WITH THE PASSAGE OF TIME SINCE THE CREATION OF AS-BUILT DRAWINGS AND/OR THE DESIGNERS SURVEY, BOTH CONCEALED AND VISIBLE CONDITIONS MAY HAVE CHANGED DUE TO ALTERATIONS, ADDITIONS, RENOVATIONS AND DETERIORATION.
PRIOR TO THE COMMENCEMENT OF ANY WORK IN PREPARATION OF CONSTRUCTION RELATED ACTIVITIES, INCLUDING BUT NOT LIMITED TO SHOP DRAWING PREPARATION, ALL BURIED, EMBEDDED, AND CONCEALED ITEMS LIKELY TO BE ENCOUNTERED DURING CONSTRUCTION SHALL BE LOCATED AND MARKED ON THE SURFACE. THIS WORK SHALL BE ACCOMPLISHED BY DESTRUCTIVE AND/OR NON-DESTRUCTIVE MEANS WITHOUT IMPAIRING THE STRUCTURAL INTEGRITY OF THE ASSOCIATED MEMBERS. SHORING AS REQUIRED SHALL BE DESIGNED BY A PROFESSIONAL STRUCTURAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT, AND FURNISHED AND INSTALLED AT NO ADDITIONAL COST. EXISTING CONDITIONS THAT INTERFERE OR OTHERWISE AFFECT THE DESIGN, CONSTRUCTION OR SERVICEABILITY OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE COR, INCLUDING PLAN AND SECTION SKETCHES, IMMEDIATELY FOR RESOLUTION. THE CONTRACTOR SHALL ALLOW TWO CALENDAR

The beginning of the document. Download the full file to read on.