Home / RFQ Construction Services-Technical Security Upgrade (TSU) / Document

TSU Statement of Work and Design Drawings Specifications

Updated

A PDF document (2.8 MB) attached to RFQ Construction Services-Technical Security Upgrade (TSU), from the Department of State. Due Dec 18, 2026, 10:00 AM (UTC+3).

File name: TSU _SOW and Design Drawings Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

TE

DE

P

ST
A

A

R

E N T OF

M
T

«

D

ST

M

TE

ER

UNI

ICA

«

A T E S OF

A

DS

U.S. DEPARTMENT of STATE

A. SHORT PERIOD, Sos

0.54

B. 1-SECOND PERIOD, So 1

0.40

UNCLASSIFIED

L

THE CONTRACTING OFFICER REPRESENTATIVE (HEREAFTER REFERRED TO AS POST)

WILL RETAIN THE SERVlCES OF A LOCAL CONTRACTOR TO PERFORM THE BELOW

SCOPE OF WORK. POST WILL HANDLE ALL THE CONTRACT LEGAL REQUIREMENTS

WITH THE LOCAL CONTRACTOR. DS/FSE/PME (HEREAFTER REFERRED TO AS PME)

WILL PROVIDE THE DESIGN DRAWINGS AND SCOPE OF WORK.

GENERAL

6. SEISMIC REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

1.E.1. SITE INSTALLATION OVERSIGHT

INSTALLATION OVERSIGHT, SUPERVISION AND ESCORTING IS THE

RESPONSIBILITY OF POST IN ACCORDANCE WITH ANY SITE SPECIFIC SECURITY

DIRECTIVES.

SOLICITATION AWARD AND IMPLEMENTATION OF THIS LOCAL CONTRACTOR PACKAGE

MUST MEET THE REQUIREMENTS DESCRIBED IN THE PROVIDED POST REQUEST

MEMO.

J

1.E.2. SITE PREPARATION

LOCAL CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING AND REMOVING

ALL DEBRIS FROM THE EMBASSY COMPOUND TO THE NEAREST AUTHORIZED

DUMP FACILITY (AUTHORIZED BY THE TOWN). THE AREAS AFFECTED BY

LOCAL CONTRACTOR'S WORK MUST BE RETURNED BACK TO

PRE-CONSTRUCTION CONDITIONS AFTER THE WORK IS COMPLETED. (E.G.

GRASS, GRAVEL, SIDEWALK, LANDSCAPING, ASPHALT ETC.)

IT IS THE LOCAL CONTRACTORS RESPONSIBILITY TO REVIEW AND UNDERSTAND

THE WORK INVOLVED AND WHAT IS REQUIRED TO COMPLETE THE PROJECT. IF

ANY ERROR OR INCONSISTENCIES ARE FOUND ON THE DRAWINGS, LOCAL

CONTRACTOR WILL BRING THESE TO THE ATTENTION OF POST AND/OR PME.

LOCAL CONTRACTOR SHALL HAVE A RESIDENT REGISTERED/CERTIFIED/LICENSED

CIVIL ENGINEER OR GRADUATE ARCHITECT ON SITE OR A QUALIFIED

CONSTRUCTION SUPERVISOR AT ALL TIMES, WHO SHOULD HAVE AT LEAST TWO

YEARS EXPERIENCE IN SIMILAR WORK AND CAN SPEAK, WRITE AND READ ENGLISH

AT A MODERATE OR HIGHER LEVEL. LOCAL CONTRACTOR SHALL SUBMIT THE

CURRICULUM VITAE OF THE RESIDENT ENGINEER TO THE EMBASSY COMPOUND

FOR APPROVAL.

LOCAL CONTRACTOR WILL PROVIDE A DETAILED PROJECT SCHEDULE, WITH START

AND END DATES FOR WORK ACTIVITIES AND STATING A CRITICAL PATH.

H

POST WILL HAVE FINAL APPROVAL OF ALL WORK PERFORMED BY LOCAL

CONTRACTOR.

1.B. MATERIALS

G

1.C. CODES AND GUIDELINES

ALL WORK SHALL BE ACCOMPLISHED AS PER THE FOLLOWING CODES AND

GUIDELINES.

LOCAL CONTRACTOR MUST KEEP ALL DEBRIS AND EXCAVATED MATERIAL

CLEAR OF SERVICE NETWORK DRAJNS, COVERS AND SUMPS NEAR THE

TRENCHES, TO PREVENT CLOGS OR DAMAGE.

1. 2018 INTERNATIONAL FIRE CODE (IFC) AND 2020 NATIONAL ELECTRICAL

CODE (NEC).

F

3. OS SECURITY ENGINEERING APPLICATION GUIDELINES.

SEE SECTION 3.A.

2. INFRASTRUCTURE SUPPORT SYSTEM

The beginning of the document. Download the full file to read on.