TSU Statement of Work and Design Drawings Specifications
Updated
A PDF document (2.8 MB) attached to RFQ Construction Services-Technical Security Upgrade (TSU), from the Department of State. Due Dec 18, 2026, 10:00 AM (UTC+3).
File name: TSU _SOW and Design Drawings Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
TE
DE
P
ST
A
A
R
E N T OF
M
T
«
D
ST
M
TE
ER
UNI
ICA
«
A T E S OF
A
DS
U.S. DEPARTMENT of STATE
A. SHORT PERIOD, Sos
0.54
B. 1-SECOND PERIOD, So 1
0.40
UNCLASSIFIED
L
THE CONTRACTING OFFICER REPRESENTATIVE (HEREAFTER REFERRED TO AS POST)
WILL RETAIN THE SERVlCES OF A LOCAL CONTRACTOR TO PERFORM THE BELOW
SCOPE OF WORK. POST WILL HANDLE ALL THE CONTRACT LEGAL REQUIREMENTS
WITH THE LOCAL CONTRACTOR. DS/FSE/PME (HEREAFTER REFERRED TO AS PME)
WILL PROVIDE THE DESIGN DRAWINGS AND SCOPE OF WORK.
GENERAL
6. SEISMIC REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
1.E.1. SITE INSTALLATION OVERSIGHT
INSTALLATION OVERSIGHT, SUPERVISION AND ESCORTING IS THE
RESPONSIBILITY OF POST IN ACCORDANCE WITH ANY SITE SPECIFIC SECURITY
DIRECTIVES.
SOLICITATION AWARD AND IMPLEMENTATION OF THIS LOCAL CONTRACTOR PACKAGE
MUST MEET THE REQUIREMENTS DESCRIBED IN THE PROVIDED POST REQUEST
MEMO.
J
1.E.2. SITE PREPARATION
LOCAL CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING AND REMOVING
ALL DEBRIS FROM THE EMBASSY COMPOUND TO THE NEAREST AUTHORIZED
DUMP FACILITY (AUTHORIZED BY THE TOWN). THE AREAS AFFECTED BY
LOCAL CONTRACTOR'S WORK MUST BE RETURNED BACK TO
PRE-CONSTRUCTION CONDITIONS AFTER THE WORK IS COMPLETED. (E.G.
GRASS, GRAVEL, SIDEWALK, LANDSCAPING, ASPHALT ETC.)
IT IS THE LOCAL CONTRACTORS RESPONSIBILITY TO REVIEW AND UNDERSTAND
THE WORK INVOLVED AND WHAT IS REQUIRED TO COMPLETE THE PROJECT. IF
ANY ERROR OR INCONSISTENCIES ARE FOUND ON THE DRAWINGS, LOCAL
CONTRACTOR WILL BRING THESE TO THE ATTENTION OF POST AND/OR PME.
LOCAL CONTRACTOR SHALL HAVE A RESIDENT REGISTERED/CERTIFIED/LICENSED
CIVIL ENGINEER OR GRADUATE ARCHITECT ON SITE OR A QUALIFIED
CONSTRUCTION SUPERVISOR AT ALL TIMES, WHO SHOULD HAVE AT LEAST TWO
YEARS EXPERIENCE IN SIMILAR WORK AND CAN SPEAK, WRITE AND READ ENGLISH
AT A MODERATE OR HIGHER LEVEL. LOCAL CONTRACTOR SHALL SUBMIT THE
CURRICULUM VITAE OF THE RESIDENT ENGINEER TO THE EMBASSY COMPOUND
FOR APPROVAL.
LOCAL CONTRACTOR WILL PROVIDE A DETAILED PROJECT SCHEDULE, WITH START
AND END DATES FOR WORK ACTIVITIES AND STATING A CRITICAL PATH.
H
POST WILL HAVE FINAL APPROVAL OF ALL WORK PERFORMED BY LOCAL
CONTRACTOR.
1.B. MATERIALS
G
1.C. CODES AND GUIDELINES
ALL WORK SHALL BE ACCOMPLISHED AS PER THE FOLLOWING CODES AND
GUIDELINES.
LOCAL CONTRACTOR MUST KEEP ALL DEBRIS AND EXCAVATED MATERIAL
CLEAR OF SERVICE NETWORK DRAJNS, COVERS AND SUMPS NEAR THE
TRENCHES, TO PREVENT CLOGS OR DAMAGE.
1. 2018 INTERNATIONAL FIRE CODE (IFC) AND 2020 NATIONAL ELECTRICAL
CODE (NEC).
F
3. OS SECURITY ENGINEERING APPLICATION GUIDELINES.
SEE SECTION 3.A.
2. INFRASTRUCTURE SUPPORT SYSTEM