UAS Power Generation Challenge
Updated
A PDF document (222 KB) attached to AFWERX Challenge Commercial Solutions Opening (CSO), from the Department of the Air Force. Due Feb 23, 2028, 11:59 PM (UTC-5).
File name: 07.29.2025 UAS Power Generation Challenge.pdf
The full file is for paid members, or buy this bid alone.
Preview
FA2280-23-S-C001-003
UAS Power Generation Challenge
#nextGENpower
BLUF
NOTE: This is an update to the original call posted 19 July 2023 and is updated to remove the required timeline from Spiral 3 CSP submissions under the
COMMERCIAL SOLUTION PROPOSAL (CSP) CONTENT AND EVALUATION FOR
SPIRAL 3 section. Verbiage has been added to emphasize that there is no mandated timeline for request for proposal issuance following Spiral 2 or Showcase. The contact information was also updated to remove a specific point of contact and refer interested parties to the Contact Information section on SAM.gov. These changes can be found in bullet points 14 and 15 of the Government Contracting Terms and Conditions section.
The United States Air Force (USAF) is seeking recent technological advancements in the aerospace and automotive industries that can be leveraged to modernize power generation for large group 4-5 Unmanned Aircraft Systems (UAS). Learn about the U.S. Department of Defense (DoD) UAS groups here.
OVERVIEW
A new suite of UAS-specific mechanical-to-electrical power generators will enable the USAF to optimize missions, reduce manufacturing and replacement costs, and simplify maintenance. These power generators should be reimagined in the context of all relevant industries, leveraging modern manufacturing techniques and addressing lifecycle cost implications.
To learn about legacy power generators, review this whitepaper. The USAF encourages participants in this Challenge to offer technological solutions for experimentation and/or feasibility study, as well as developed solutions. In either case, we’re interested in understanding all underlying technologies upon which the solution relies.
OBJECTIVES
The objectives of the UAS Power Generation Challenge are threefold: 1. The primary objective is to demonstrate the viability of solutions that examine the tradeoff between performance and cost while reducing manufacturing complexity and production lead times.
2. The secondary objective is to accelerate technology developments that could lead to operational adoption of advanced capabilities by the U.S. Government.
FA2280-23-S-C001-003
3. The third objective is to build a stronger domestic industry via the development of multiple commercial and government applications for this new suite of power generators.
FA2280-23-S-C001-003
CONTEXT
The USAF is interested in net-new solutions, enhancements to existing solutions, and/or the development of multi-capable solutions. For this Challenge, the USAF has
The beginning of the document. Download the full file to read on.
Other documents in this bid
- AFWERX Challenges CSO
- ACE Common Aviation Support Equipment Challenge
- UAS Power Generation Challenge
- Expedient Basing Challenge Part 2
- UAS Power Generation Challenge
- A2RM Design Challenge
- AFWERX Challenges CSO
- A2RM Design Challenge Update2
- A2RM Design Challenge Update 3
- A2RM Design Challenge
- Super Goggles Challenge Call
- Super Goggles Challenge Call