USCG Seawater Pump Specifications Sheet
Updated
A Word document (68 KB) attached to USCG Seawater Pumps, from the US Coast Guard. Due Dec 7, 2026, 12:00 PM (UTC-5).
File name: USCG Seawater Pump Spec Sheet.docx
The full file is for paid members, or buy this bid alone.
Preview
IBCTPL
PRODUCT SPECIFICATION SHEET
MULTIPLE SEAWATER PUMPS
ORGINATED BY: Mark Pelo DATE: 05/02/2024
ORIGINATOR’S COMMAND: SFLC-ESD-NAME-AUX MACH
INTERNAL REVIEWER: Mike Wilson DATE: 05/03/2024
PRODUCT LINE APPROVAL: Akhila Wijayaratne DATE: 09/09/2024
Title Page
SCOPE3
2.0 APPLICABLE DOCUMENTS4
2.1 Document Availability4
2.2 Government Documents4
2.3 Other Government Documents4
2.4 Commercial Documents4
2.5 Order of Precedence5
3.0 REQUIREMENTS6
3.1 Performance and General Requirements6
3.2 Specific Requirements7
3.3 Field Services8
3.4 Departure from Specification8
3.5 Technical Documentation9
3.6 Integrated Logistics Support10
3.7 Tests, Inspections and Reports11
3.8 Workmanship12
3.9 Notifications and Inspections12
4.0 QUALITY ASSURANCE13
4.1 General13
4.2 Records13
4.3 Calibration System13
4.4 Responsibility for Inspection13
4.5 Responsibility for Compliance13
4.6 Quality Assurance Plan13
4.7 Tests and Inspections13
4.8 Failure Responsibility14
4.9 Tests and Inspection Reports14
4.10 Packaging Inspection14
5.0 PRESERVATION, PACKING AND MARKING15
6.0 NOTES16
6.1 Potential Sources16
6.2 Government and Commercial Document Sources16
7.0 SHIPPING ADDRESS18
8.0 GOVERNMENT POINT OF CONTACTS (POC)18
8.1 TECHNICAL POC18
8.2 PROJECT MANAGER18
8.3 SUPPLY POC18
1.0SCOPE
This specification describes the requirements for the procurement of 96 new Seawater Pumps for various applications on USCG Cutters. This specification DOES NOT include installation of the equipment by the Vendor. Component, documentation, and technical support items covered under this Procurement Specification are as follows: • Seawater Pump is defined as an assembled pump, motor, coupling (if applicable), and mounting base. • The Vendor shall supply Provisioning Technical Data (PTD), Attachment 1, with their proposal response that includes applicable technical manuals, drawings and pump curves describing the pump to provide the United States Coast Guard (USCG) with sufficient information to produce Cutter specific installation drawings. • The Vendor shall supply Engineering Data for Provisioning (EDFP), on the system and components concurrent with the delivery of the equipment to allow the USCG to produce maintenance procedure cards (MPCs) and other logistical support documentation. • The Vendor shall provide maintenance parts lists and a recommended onboard repair parts (OBRP) list for all components.
2.0APPLICABLE DOCUMENTS
2.1Document Availability – To obtain the referenced documents, see Section 6.2. 2.2Government Documents - The following specification and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the current Department of Defense Index of Specifications and Standards (DODISS) and supplements therein.
The beginning of the document. Download the full file to read on.