VA Response to Vendor Questions
Could the Government please provide the soil lab report so the disposal facility can approve the waste profile? Has the soil been tested for asbestos, and will any additional testing be the contractor's responsibility?
VA Response – see attached report. The soil piles dumped on federal property by an unknown party were sent out for contaminants of concern (COC) analysis.
Asbestos was not tested. If additional soil testing is required beyond the attached analytical report for licensed manifested offsite receiving facility to accept material, vendor shall advise contract officer before proceeding with additional testing if this required.
Testing protocols for soil analysis
• EPA 6010B – 17 metals
• EPA 7471A – mercury
• EPA 8015M – Total Petroleum Hydrocarbons (diesel, gasoline, and other fuels) • EPA 8082 - Polychlorinated bisphenols (old electrical transformer fluid) • EPA 8260 Volatile Organic Compounds – freons (refrigerants) and complex organic synthetic chemicals • EPA 8270C – Semi-Volatile Organic Compounds (heavy molecular weight phenols and aromatic derivatives)
For CLIN 0003 (estimated 150 tons), is the disposal price a fixed lump sum, or will it be adjusted based on actual scale tickets? If adjusted, should we provide a per-ton rate?
VA Response: The estimated volume is about 80 cubic yards (150 tons) Disposal price will be firm fixed price. Weigh tickets will be provided to Contract officer upon completion of project.
Is there a required disposal facility, or may the contractor select any permitted facility? Must the facility name or permit be included with the quote?
VA Response: Contractor may select permitted facility for manifesting material offsite. The facility name and permit must be included in quote and concurrence from prospective disposal facility to accept such material.
Will the Government provide any on-site resources, such as a staging area, water, power, restrooms, or a scale? What are the working days and hours allowed, and are there any truck size or weight limits?
VA Response: There are no on-site resources such as staging area, water, power, or truck scale. Workdays Monday through Friday except for government holidays. Access hours are 8 AM-3PM – contractor must contact VA safety representative when reporting onsite every day. As far as truck size and weight limits are subject conditions at a California worksite. Please note the narrow access road to dump site might not be suitable for very large trucks. Due to much construction adjacent to soil dump site truck drivers need to take extra caution.