Home / Replace Chairlift-FCI Loretto / Document

Wage Detemination

Updated

A PDF document (40 KB) attached to Replace Chairlift-FCI Loretto, from the Federal Prison System / Bureau of Prisons. Due Oct 30, 2026, 1:00 PM (UTC-4).

File name: Wage Detemination PA20260080 05.18.2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

"General Decision Number: PA20260080 05/18/2026
State: Pennsylvania
Construction Types: Building
Counties: Pennsylvania Counties of
Cambria

Modification Number

Publication Date
01/16/2026
05/18/2026

ASBE0023-008 07/01/2024

Rates

ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL

---------------------------------------------------------------BOIL0154-003 01/01/2025

Rates
---------------------------------------------------------------BRPA0009-011 12/01/2022

Rates
---------------------------------------------------------------BRPA0009-044 12/01/2022

Rates

BRICKLAYER (INCLUDING POINTING, CAULKING, CLEANING).$ 34.14

---------------------------------------------------------------CARP0423-007 06/01/2023

Rates

CARPENTER (SCAFFOLD BUILDING AND FLOOR

---------------------------------------------------------------CARP0423-008 06/01/2023

Rates

CARPENTER (INCLUDES ACOUSTICAL CEILING

INSTALLATION, BATT INSULATION, DRYWALL HANGING,

METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND

VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES

SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD

---------------------------------------------------------------CARP0443-004 06/01/2024

Rates

Fringes
29.81

Fringes
33.17

Fringes
21.63
17.16

Fringes
22.00
22.00

Fringes
18.09

Fringes

18.09

Fringes

---------------------------------------------------------------ELEC0005-014 12/26/2025

Rates
ELECTRICIAN (INCLUDES ALARM INSTALLATION,

INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND

LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE

---------------------------------------------------------------ENGI0066-041 07/01/2024

Rates

POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID

LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER

POWER EQUIPMENT OPERATOR:

BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE*

LOADER, MECHANIC)

*ADD TO CRANE RATE:

BOOMS 101-150 JIBS- ADD $.75

BOOMS 151-200

JIBS- ADD $1.50

BOOMS 201-251 JIBS- ADD

---------------------------------------------------------------IRON0003-022 06/01/2023

Rates
IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER,
---------------------------------------------------------------LABO0125-005 06/01/2022

Rates
---------------------------------------------------------------LABO0824-002 01/01/2024

Rates
---------------------------------------------------------------PAIN0057-035 06/01/2023

Rates
---------------------------------------------------------------PAIN0751-002 09/01/2023

Rates
---------------------------------------------------------------PLAS0526-015 06/01/2021

Rates

The beginning of the document. Download the full file to read on.

Other documents in this bid