WHB Western States ORC Statement of Work Presolicitation Attachment 11 17 2
Updated
A PDF document (201 KB) attached to Western States ORC Services, from the Bureau of Land Management.
File name: WHB_Western_States_ORC_SOW_Presolicitation_Attch_11_17_2.pdf
The full file is for paid members, or buy this bid alone.
Preview
This draft Statement of Work is provided for planning and informational purposes only. The Government anticipates incorporating a substantially similar Statement of Work into the forthcoming solicitation. However, requirements may change prior to solicitation issuance. The final
solicitation will govern all performance requirements,
contract terms, evaluation criteria, and pricing
instructions.
SECTION C – STATEMENT OF WORK
1.0 Background
Wild horses and burros on public lands administered by the Bureau of Land Management (BLM) are protected, managed, and controlled under the Wild Free-Roaming Horses and Burros Act of December 15, 1971, as amended (16 U.S.C. 1331-1340) www.blm.gov. The BLM’s Wild Horse and Burro (WHB) program is responsible for managing and protecting our nation’s wild horses and burros on public lands. As part of this responsibility, the BLM manages over 85,000 animals (March 2026) on 25.6 million acres of public lands and must remove excess animals from public lands to control population growth. The excess animals are then cared for in off-range corrals (ORCs) until they can, ideally, be placed in private care, generally through adoption, sale, or transfer.
2.0 Scope of Work
The Contractor shall provide all labor, land, facilities, supplies, equipment, feed/supplement, and water necessary to perform the requirements of this Statement of Work (SOW). Additionally, the Contractor’s facility infrastructure, labor, and services must meet or exceed the requirements specified in the Comprehensive Animal Welfare Program (CAWP) Standards for Off-Range Corral Facilities (Attachment XX, Section 1).
In addition to labor necessary for facility maintenance and feeding, the Contractor shall provide adequate labor for animal handling and preparation procedures. It is anticipated that three contractor personnel and one BLM staff (as discussed in section 9.0) will be necessary to accomplish preparation procedures per working chute. The BLM COR, Facility Manager and/or Project Inspector (PI) will work together with the Contractor and/or Contractor Designated Operations POC coordinating in the daily handling and holding pen movement of animals for vaccinations, deworming, microchipping, age determination, freeze marking, shipping, receiving, sorting/segregating animals, assisting facility veterinarian with blood draw, gelding (castrations of male animals), treating sick or injured animals. The facility will also be expected
to provide care to mares and jennies which foal at the facility until dependent animals are
The beginning of the document. Download the full file to read on.