Home / Nikon X-Ray Maintenance & Service / Document

X-Ray Service SSJ Redacted

Updated

A PDF document (181 KB) attached to Nikon X-Ray Maintenance & Service, from the Defense Logistics Agency.

File name: X-Ray Service SSJ_Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

July 23, 20226
PURPOSE: FAR 13.106-1 (b) (1) (i) “One Source Available /Brand-Name” Requiring Activity: DLA Product Test Center (PTC) Electronics Lab located at Columbus, OH. Contracting Activity: DLA Contracting Services located at Columbus, Ohio. This action being approved is the acquisition of services on other than full and open competition basis under; 10 U.S.C. 2304 (c) (1) and FAR 13.106-1 (b) (1) (i).

The service required to meet the using activities needs are described as follows: Description

Material Code

Quantity

Preventative
Maintenance, Service
& Repairs, Radiation
Surveys on X-Ray
System

J066-V00014583

1.00

Estimated Dollar
Value
Base Year:
Option 1:
Option 2:
Total:

Period of
Performance
One Year from
Contract Award Date
plus two (2) option
years

Determination has been made to conduct an acquisition on “One Source Available/ Brand-Name” basis to Nikon Metrology, LLC. per FAR 13.106-1 (b) (1) (i) for buys not exceeding the simplified acquisition threshold. This acquisition is to provide preventative maintenance, service & repairs, and radiation surveys for the Nikon XTV 160 x-ray system. Nikon Metrology, LLC. is the Original Equipment Manufacturer (OEM) of the equipment covered by this contract. Nikon’s software is proprietary which makes them the only company able to update, diagnose, and perform software related repairs on the equipment. Many of the components on the equipment are also proprietary to Nikon which makes them the only company qualified to diagnose, repair, and source the parts necessary to perform service on the system. In order to simplify contract requirements, one contract through Nikon to perform all service on the equipment is necessary. It is anticipated that the cost of this contract will be determined fair and reasonable based on the comparison between

The beginning of the document. Download the full file to read on.