470 C2 Western Boone FY2027
Updated
An E-Rate Form 470 from Western Boone Comm SCH Corp in Thorntown, IN. Providers can bid until Dec 10, 2026.
| Applicant | Western Boone Comm SCH Corp |
|---|---|
| Type | School District |
| Location | Thorntown, IN |
| County | Boone |
| Form 470 number | 270004422 |
| Funding year | 2027 |
| Posted | Nov 12, 2026 |
| Bids accepted until | Dec 10, 2026 (25 days left) |
| Schools or libraries covered | 4 |
What they are asking for
| Service | What | Quantity | Capacity | Sites |
|---|---|---|---|---|
| Network maintenance | Switches | 43 each | 3 | |
| Network maintenance | Uninterruptable Power Supply/Battery Backup | 18 each | 3 | |
| Wi-Fi and network equipment | Switches And Necessary Software And Licenses | 43 each | ||
| Network maintenance | Cabling | 4 feet | 3 | |
| Wi-Fi and network equipment | Uninterruptable Power Supply/Battery Backup And Necessary Software And Licenses | 18 each | ||
| Wi-Fi and network equipment | Cabling | 4 feet | 3 |
In their words: networks and Wi-Fi (Category 2)
There is an RFP document that provides greater detail on the scope of this project. It is important that service providers read the attached document to fully understand this project and prepare a more directed bid.
Read the applicant's full note
Please reference Form 470 #270004422 on all correspondence. This request is for network equipment. USAC has advised applicants to include all three types of service for each Category 2 line item listed in Appendix A of the RFP document.Western Boone County Community School Corporation (the Applicant) is seeking proposals for a project to supply and install network equipment at its eligible locations.
Bidders are advised that this project will be contingent upon the successful obtaining of Category 2 E-Rate funding, and the contract agreement between the district and the successful bidder must recognize that contingency. The Applicant seeks an agreement that allows it to work with the selected vendor to adjust quantities and/or scale back or cancel the project entirely as needed based upon funding availability and/or the best interests of the Applicant.Project ScopeThe Applicant seeks eligible equipment as outlined in Appendix A.
Equipment shall be new, factory-sealed equipment currently available from the manufacturer; the Applicant will not accept proposals of used, remanufactured, refurbished, B stock, returns, open-box, discontinued, gray market, or equipment in any other condition other than new and factory-sealed with all original manufacturer warrantiesInstallation will be in place of existing equipment and the requested equipment will be integrated into the existing environment.
Each bid should include all labor necessary for staging, installation, testing, and documentation of equipment. Equipment staging will consist of (but not be limited to) ensuring firmware version consistency, configuration loading, and hardware preparation for mounting. Software and firmware version for components will be agreed upon at time of deployment, and configurations will be coordinated with the Applicants staff.
Installation by the selected vendor shall include the removal of the existing equipment and placement of the new equipment. Equipment testing should verify access to internal resources and the Internet. Documentation should include configuration and summary reports of installations. Questions:Any questions related to the technical aspects of this document should be directed to Jeff Christner, Director of Technology at [contact in the Form 470], no later than 12:00pm EST on Wednesday, 12/2/2026.Please copy E-Rate Consultant Steve Renzino at [contact in the Form 470] on all communications.
Answers to any written questions or any additional information, revisions, or clarifications to the RFP will be provided in the form of an addendum to be posted with the FCC Form 470 on the Universal Service (E-Rate) website. It is the sole responsibility of the Service Provider to check for any addenda that may be issued.Proposal Delivery:The Applicant reserves the right to reject each and every bid, and to waive informalities, irregularities, and errors in the bidding to the extent permitted by law.
This includes the right to extend the date and time for receipt of bids. In the event that a responsible bid is not received or if it is determined that the low bid received is too high, the bid received will be rejected and the project will be cancelled or rebid. Bids should be emailed to the office of Jeff Christner, Director of Technology at [contact in the Form 470], no later than 12:00pm EST on Thursday, 1/7/2027.Please copy E-Rate Consultant Steve Renzino at [contact in the Form 470] on all communications.
Their E-Rate history
In funding year 2026, Western Boone Comm SCH Corp had $87,600 of E-Rate services before discount, with a 70% E-Rate discount, from Boone County Rural Electric Membership Corporation, ENA Services, LLC.
| Year | Service | Provider | Cost before discount | Bids received | Contract ends |
|---|---|---|---|---|---|
| 2026 | Internet access | Boone County Rural Electric Membership Corporation | $55,800 | 2 | Jun 30, 2029 |
| 2026 | Internet access | ENA Services, LLC | $31,800 | 4 | Jun 30, 2028 |
| 2025 | Internet access | Boone County Rural Electric Membership Corporation | $55,800 | 2 | Jun 30, 2029 |
| 2025 | Internet access | ENA Services, LLC | $31,800 | 4 | Jun 30, 2028 |
From USAC funding request data (FCC Form 471). Costs are the amounts requested before the E-Rate discount.
Read the full Form 470 on USAC (PDF)
Source: E-Rate FCC Form 470 data published by USAC (Universal Service Administrative Company) on opendata.usac.org, read once a day and shown as published, without warranty. Always read the full Form 470 and any RFP before you respond, and follow the competitive bidding rules of the E-Rate program.