Form 470 (2027) HCS
Updated
An E-Rate Form 470 from Harvest Christian School in Ozark, AL. Providers can bid until Nov 23, 2026.
| Applicant | Harvest Christian School |
|---|---|
| Type | School |
| Location | Ozark, AL |
| County | N/A |
| Form 470 number | 270002625 |
| Funding year | 2027 |
| Posted | Oct 26, 2026 |
| Bids accepted until | Nov 23, 2026 (26 days left) |
| Schools or libraries covered | 1 |
What they are asking for
| Service | What | Quantity | Capacity | Sites |
|---|---|---|---|---|
| Wi-Fi and network equipment | Switches And Necessary Software And Licenses | 4 each | ||
| Internet access | Internet Access And Data Transmission Service | 1 each | 1 Gbps to 5 Gbps | 1 |
| Wi-Fi and network equipment | Uninterruptable Power Supply/Battery Backup And Necessary Software And Licenses | 2 each | ||
| Wi-Fi and network equipment | Wireless Access Points And Necessary Software And Licenses | 8 each | ||
| Wi-Fi and network equipment | Cabling | 1000 feet | 1 |
In their words: internet access (Category 1)
Harvest Christian School located at 1694 Deese Road, Ozark, Alabama is seeking bids for symmetric internet service, with pricing for a minimum of 1 Gbps and maximum of 5 Gbps on a minimum 3 year term.
In their words: networks and Wi-Fi (Category 2)
Harvest Christian School located at 1694 Deese Road, Ozark, AL 36360 is seeking bids for core network infrastructure refresh.
Read the applicant's full note
This refresh will consist of qty (4) 48-port POE switches capable of a minimum 10 Gbps transmission through fiber SFP, qty (1) 12-port POE switch, and qty (1) 24-port switch. All switches must be the same brand, and have cloud control console availability. Additionally, this bid should include a qty (8) ceiling mounted Access Points, and qty (1) high-audience capacity access point.
It is preferred that the access points and switches share the same cloud console capability. Some indoor cabling will be required for access point mounting, and all equipment needs to be professional or enterprise grade classification.
Their E-Rate history
In funding year 2026, Harvest Christian School had $7,140 of E-Rate services before discount, with a 90% E-Rate discount, from Teklinks, Inc.
| Year | Service | Provider | Cost before discount | Bids received | Contract ends |
|---|---|---|---|---|---|
| 2026 | Internet access | Teklinks, Inc | $7,140 | 8 | Jun 30, 2027 |
| 2025 | Internet access | Teklinks, Inc | $7,128 | 8 | Jun 30, 2026 |
From USAC funding request data (FCC Form 471). Costs are the amounts requested before the E-Rate discount.
Read the full Form 470 on USAC (PDF)
Source: E-Rate FCC Form 470 data published by USAC (Universal Service Administrative Company) on opendata.usac.org, read once a day and shown as published, without warranty. Always read the full Form 470 and any RFP before you respond, and follow the competitive bidding rules of the E-Rate program.