Home / E-Rate / Texas / Request

YR27.28.470

Updated

An E-Rate Form 470 from Bremond INDEP School District in Bremond, TX. Providers can bid until Dec 14, 2026.

Be among the first to see new E-Rate requests that match your business
Only new notices that match, once a day. E-Rate requests and federal bids in all states that match your words.
ApplicantBremond INDEP School District
TypeSchool District
LocationBremond, TX
CountyRobertson
Form 470 number270003738
Funding year2027
PostedNov 16, 2026
Bids accepted untilDec 14, 2026 (26 days left)
Schools or libraries covered3

What they are asking for

ServiceWhatQuantityCapacitySites
Wi-Fi and network equipmentAntennas, Connectors, And Related Components75 each3
Wi-Fi and network equipmentSwitches And Necessary Software And Licenses40 each
Wi-Fi and network equipmentRacks175 each
Wi-Fi and network equipmentAntennas, Connectors, And Related Components1000 each3
Wi-Fi and network equipmentCabling1300 feet3
Wi-Fi and network equipmentCabling6000 feet3
Wi-Fi and network equipmentCabling300 feet3
Internet accessInternet Access And Data Transmission Service1 each1 Gbps to 50 Gbps3

In their words: internet access (Category 1)

We are currently under a contract for data transmission and internet access. This is for informational purposes only. No bids required at this time.

In their words: networks and Wi-Fi (Category 2)

Bremond ISD is seeking bids for up to 300 drops, not feet, depending on ERATE and district funding.

Read the applicant's full note

Cabling must be CAT6E or better and all runs must be home runs-no splicing.We are also seeking bids to run fiber from IDF to MDF1, MDF2, MDF3, MDF4, and MDF5 located at all three entities (Estimated to be 6000ft). These fiber runs must be capable of running at least 10GB full duplex with no splicing. Price quoted on the cable drops and the fiber runs must include installation, termination, labeling, routing, testing, and all connectors and related components for connectivity (including but not limited to LC to ST fiber patch cables or equivalent, at least OM3 certified and GBICs for the appropriate line speeds).

Price quoted must also include enough rack cable managers both horizontal and vertical units so that all cable drops and fiber runs are enclosed and protected. We are also seeking bids for approximately 30 patch panels each with at least 24 ports per panel and approximately 45 additional patch panels that are obsolete and need replacement.

Next, we are seeking bids for up to 1,300 patch cables (color to match district's color coding), CAT6e or better, and labeling. Vendors must itemize materials and labor and separately identify any E-Rate-ineligible costs. Lastly, Bremond ISD is seeking for up to 38 POE++ 48 port rack mountable switches. Please price these switches with 1gb, 2.5gb, 5gb, 10gb, 25gb and 100gb per port capacity.

Our budget will determine which ones we will purchase. Also price 2 POE++ at least 16 port rack mountable switches. These need to be priced at 1gb, 2.5gb, 5gb, and 10gb port capacity. Our budget will determine which ones we will purchase. All pricing for switches must include licensing for 5yrs. If a site is required for quoting, please email Josh at [contact in the Form 470].

For all of these category 2 requests, the quantity and capacity purchased is dependent upon district and ERATE funding.

Their E-Rate history

In funding year 2026, Bremond INDEP School District had $19,800 of E-Rate services before discount, with an 80% E-Rate discount, from AMG Technology Investment Group LLC.

YearServiceProviderCost before discountBids receivedContract ends
2026Internet accessAMG Technology Investment Group LLC$19,8002Jun 30, 2028
2025Internet accessAMG Technology Investment Group LLC$19,8002Jun 30, 2028

From USAC funding request data (FCC Form 471). Costs are the amounts requested before the E-Rate discount.

Read the full Form 470 on USAC (PDF)

All open E-Rate requests

Source: E-Rate FCC Form 470 data published by USAC (Universal Service Administrative Company) on opendata.usac.org, read once a day and shown as published, without warranty. Always read the full Form 470 and any RFP before you respond, and follow the competitive bidding rules of the E-Rate program.