26 Counties in Alaska Davis-Bacon Wage Rates: Building and Heavy
Updated
Federal prevailing wage rates (Davis-Bacon) for building and heavy construction in 26 Counties in Alaska: 39 classifications, base rates from $31.82 to $74.34 an hour plus fringe benefits. General decision AK20260001, modification 4, published Oct 15, 2026.
| Type | Davis-Bacon (construction) |
|---|---|
| Number | AK20260001 |
| Modification | 4 |
| Published | Oct 15, 2026 |
| State | Alaska |
| Area | Alaska Counties of Aleutians East, Aleutians West, Anchorage, Denali, Skagway-Yakutat-Angoon, Bethel, Bristol Bay, Dillingham, Fairbanks North Star, Haines, Juneau, Kenai Peninsula, Ketchikan Gateway, Kodiak Island, Peninsula & Lake, Matanuska-Susitna, Nome, North Slope, Northwest Artic, Prince Of Wales-Outer Ketchika, Sitka, Southeast Fairbanks, Wrangell-Petersburg, Yukon-Koyukuk, Valdez-Cordova and Wade Hampton |
| Construction type | Building and Heavy |
Wage rates and fringe benefits (39)
| Classification | Base rate | Fringe | Total | Alaska median |
|---|---|---|---|---|
| Boilermaker | $58.33 | $28.79 | $87.12 | |
| Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker | $52.77 | $12.36 | $65.13 | |
| Tile & Terrazzo Finisher | $40.91 | $12.48 | $53.39 | |
| Carpenter (Including Lather and Drywall Hanging) | $50.79 | $26.42 | $77.21 | |
| Millwright | $56.44 | $25.87 | $82.31 | |
| Piledriver (Piledriver; Skiff Operator and Rigger) | $48.72 | $26.42 | $75.14 | $48.72 |
| Piledriver (Sheet Stabber) | $48.72 | $26.42 | $75.14 | $48.72 |
| Piledriver (Welder) | $54.28 | $26.42 | $80.70 | $48.72 (+$5.56) |
| Cable Splicer | $55.44 | $30.33 | $85.77 | |
| Electrician | $55.44 | $30.33 | $85.77 | |
| Cable Splicer (Line Construction) | $74.34 | $35.70 | $110.04 | |
| Linemen: Line Construction (Including Equipment Operators, Technician) | $72.59 | $35.65 | $108.24 | |
| Powderman, Line Construction | $70.59 | $35.59 | $106.18 | |
| Tree Trimmer, Line Construction | $42.23 | $30.10 | $72.33 | |
| Ironworker (Bender Operator) | $46.98 | $39.48 | $86.46 | $45.73 (+$1.25) |
| Ironworker (Bridge, Structural, Ornamental, Reinforcing Machinery Mover, Rigger, Sheeter, Stage Rigger, Bender Operator) | $46.98 | $39.48 | $86.46 | $45.73 (+$1.25) |
| Ironworker (Fence, Barrier Installer) | $43.48 | $39.48 | $82.96 | $45.73 (-$2.25) |
| Ironworker (Guardrail Installers) | $44.48 | $39.48 | $83.96 | $45.73 (-$1.25) |
| Ironworker (Guardrail Layout Man) | $44.22 | $39.48 | $83.70 | $45.73 (-$1.51) |
| Ironworker (Helicopter, Tower) | $47.89 | $39.48 | $87.37 | $45.73 (+$2.16) |
| Laborer: Group 4 (North of the 63Rd Parallel & East of Longitude 138 Degrees) Final Building Cleanup | $31.82 | $35.01 | $66.83 | |
| Painter: Brush/Roller Paint or Wall Coverer (North of the 63Rd Parallel) | $43.05 | $26.45 | $69.50 | |
| Painter: General Painter (South of the 63Rd Parallel) | $37.29 | $30.20 | $67.49 | |
| Painter: Industrial Painter (South of the 63Rd Parallel) | $38.64 | $30.20 | $68.84 | |
| Painter: Taper / Paper & Vinyl Hanger (South of the 63Rd Parallel) | $38.54 | $30.20 | $68.74 | |
| Glazier (North of the 63Rd Parallel) | $46.76 | $30.46 | $77.22 | |
| Floor Layer: Carpet | $39.48 | $16.25 | $55.73 | |
| Glazier (South of the 63Rd Parallel) | $47.42 | $29.10 | $76.52 | |
| Plasterer (North of the 63Rd Parallel) | $49.28 | $22.28 | $71.56 | |
| Plasterer (South of the 63Rd Parallel) | $49.28 | $22.28 | $71.56 | |
| Cement Mason/Concrete Finisher (North of the 63Rd Parallel) | $49.28 | $22.28 | $71.56 | |
| Cement Mason/Concrete Finisher (South of the 63Rd Parallel) | $49.28 | $22.28 | $71.56 | |
| Plumber; Steamfitter (East of the 141St Meridian) | $41.50 | $27.62 | $69.12 | $50.00 (-$8.50) |
| Plumber; Steamfitter (South of the 63Rd Parallel) | $50.00 | $33.20 | $83.20 | $50.00 |
| Plumber; Steamfitter (North of the 63Rd Parallel) | $55.66 | $34.90 | $90.56 | $50.00 (+$5.66) |
| Sprinkler Fitter | $60.67 | $31.39 | $92.06 | |
| Roofer | $52.07 | $19.62 | $71.69 | |
| Sheet Metal Worker (South of the 63Rd Parallel) | $55.10 | $31.72 | $86.82 | |
| Sheet Metal Worker (North of the 63Rd Parallel) | $59.85 | $32.35 | $92.20 |
The median is the middle rate for the same work across Alaska's building and heavy wage determinations in force today, shown when at least three have it.
How to use these rates
On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.
Full text of AK20260001
Show the official text (50,053 characters)
General Decision Number: AK20260001 10/15/2026
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Counties of
Aleutians East, Aleutians West,
Anchorage, Denali,
Skagway-Yakutat-Angoon, Bethel, Bristol
Bay, Dillingham, Fairbanks North Star,
Haines, Juneau, Kenai Peninsula,
Ketchikan Gateway, Kodiak Island,
Peninsula & Lake, Matanuska-Susitna,
Nome, North Slope, Northwest Artic,
Prince Of Wales-Outer Ketchika, Sitka,
Southeast Fairbanks,
Wrangell-Petersburg, Yukon-Koyukuk,
Valdez-Cordova and Wade Hampton
Building Construction Projects
Heavy Construction Projects
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
2 09/17/2026
3 10/01/2026
4 10/15/2026
ASBE0007-006 02/27/2023
Rates Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS PROTECTIVE COVERINGS,
COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 41.35 16.46
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING,
BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 37.38 19.55
----------------------------------------------------------------
BOIL0502-002 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 58.33 28.79
----------------------------------------------------------------
BRAK0001-002 07/01/2024
Rates Fringes
BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON,
TILE SETTER, TERRAZZO WORKER........................$ 52.77 12.36
TILE & TERRAZZO FINISHER............................$ 40.91 12.48
----------------------------------------------------------------
CARP1281-001 04/01/2025
Rates Fringes
CARPENTER (INCLUDING LATHER AND DRYWALL HANGING)....$ 50.79 26.42
----------------------------------------------------------------
CARP1281-002 06/01/2025
Rates Fringes
MILLWRIGHT..........................................$ 56.44 25.87
----------------------------------------------------------------
CARP2520-003 04/01/2025
Rates Fringes
DIVER (STAND BY) DEPTH PAY PREMIUM FOR DIVERS
BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT;
101 FEET AND DEEPER $2.00 PER FOOT. ENCLOSURE PAY
PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00
PER FOOT/DAY; 51-100 FEET $2.00 PER FOOT/DAY; 101
FEET AND ABOVE $3.00 PER FOOT/DAY. SATURATION
DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION
STARTS. THE SATURATION DIVING RATE APPLIES WHEN
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE
SHALL BE PAID FOR ALL SATURATION HOURS. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 61.42 25.34
DIVER (TENDER) DEPTH PAY PREMIUM FOR DIVERS BELOW
WATER SURFACE: 50-100 FEET $1.00 PER FOOT; 101
FEET AND DEEPER $2.00 PER FOOT. ENCLOSURE PAY
PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00
PER FOOT/DAY; 51-100 FEET $2.00 PER FOOT/DAY;
101 FEET AND ABOVE $3.00 PER FOOT/DAY. SATURATION
DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION
STARTS. THE SATURATION DIVING RATE APPLIES WHEN
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE
SHALL BE PAID FOR ALL SATURATION HOURS. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 53.03 25.34
DIVER (WORKING) DEPTH PAY PREMIUM FOR DIVERS BELOW
WATER SURFACE: 50-100 FEET $1.00 PER FOOT; 101
FEET AND DEEPER $2.00 PER FOOT. ENCLOSURE PAY
PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00
PER FOOT/DAY; 51-100 FEET $2.00 PER FOOT/DAY; 101
FEET AND ABOVE $3.00 PER FOOT/DAY. SATURATION
DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION
STARTS. THE SATURATION DIVING RATE APPLIES WHEN
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE
SHALL BE PAID FOR ALL SATURATION HOURS. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 92.83 26.42
PILEDRIVER (PILEDRIVER; SKIFF OPERATOR AND RIGGER) $ 48.72 26.42
PILEDRIVER (SHEET STABBER)..........................$ 48.72 26.42
PILEDRIVER (WELDER).................................$ 54.28 26.42
----------------------------------------------------------------
ELEC1547-004 09/01/2025
Rates Fringes
CABLE SPLICER.......................................$ 55.44 30.33
ELECTRICIAN.........................................$ 55.44 30.33
----------------------------------------------------------------
ELEC1547-005 04/01/2025
Rates Fringes
CABLE SPLICER (LINE CONSTRUCTION)...................$ 74.34 35.70
LINEMEN: LINE CONSTRUCTION (INCLUDING EQUIPMENT
OPERATORS, TECHNICIAN)..............................$ 72.59 35.65
POWDERMAN, LINE CONSTRUCTION........................$ 70.59 35.59
TREE TRIMMER, LINE CONSTRUCTION.....................$ 42.23 30.10
----------------------------------------------------------------
ELEV0019-002 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (EMPLOYER CONTRIBUTES a. 8% OF
THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND
6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5
YEARS' OF SERVICE AS VACATION PAID CREDIT. b. EIGHT
PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY;
THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING, AND
CHRISTMAS DAY.......................................$ 71.44 38.44
----------------------------------------------------------------
ENGI0302-002 01/25/2026
Rates Fringes
POWER EQUIPMENT OPERATOR (GROUP 1) ASPHALT ROLLER:
BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER;
BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER
PACK, AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT
COXSWAINS; BULLDOZER; CABLEWAYS, HIGHLINES AND
CABLE CARS; CLEANING MACHINE; COATING MACHINE;
CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR
150 FOOT OF BOOM AND UNDER (INCLUDING JIB AND
ATTACHMENTS): (A) HYDRA-LIFTS OR TRANSPORTERS, ALL
TRACK OR TRUCK TYPE, (B) DERRICKS, (C) OVERHEAD;
CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR
TRENCHING MACHINE (16 INCH OR OVER); DRAG SCRAPER,
YARDER, AND SIMILAR TYPES; DRILLING MACHINES, CORE,
CABLE, ROTARY, AND EXPLORATION; FINISHING MACHINE
OPERATOR, CONCRETE PAVING, LASER SCREED, AND
SIDEWALK, CURB AND GUTTER MACHINE; GRADE CHECKER
AND/OR LINE AND GRADE INCLUDING DRONE; HELICOPTERS;
HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION,
ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL,
AND SNOW CAT; HYDRO AX: FELLER BUNCHER, AND
SIMILAR; HYDRO EXCAVATION (VAC-TRUCK AND SIMILAR);
LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL
ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND
SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2
YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE
CLAMPS, LOADERS, ELEVATING BELT TYPE, EUCLID, AND
SIMILAR TYPES; MATERIAL TRANSFER VEHICLE (ELEVATING
GRADER, PICKUP MACHINE, AND SIMILAR TYPES);
MECHANICS, WELDERS, BODYMAN, ELECTRICAL, CAMP
MAINTENANCE ENGINEER; MICRO TUNNELING MACHINE;
MIXERS: MOBILE TYPE WITH HOIST COMBINATION; MOTOR
PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL
DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR,
AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER
ENGINEERS, L.B. FOSTER, PULLER, OR SIMILAR PAVING
BREAKER; PLANT OPERATOR (ASPHALT AND CONCRETE);
POWER PLANT, TURBINE OPERATOR, 200 KW AND OVER
(POWER PLANTS OR COMBINATION OF POWER UNITS OVER
300 KW); REMOTE CONTROLLED EQUIPMENT;
SCRAPER-THROUGH 40 YARDS; SERVICE OILER/SERVICE
ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST
MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL
ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER); SUB
GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES);
TACK TRACTOR; TRUCK MOUNTED: CONCRETE PUMP,
CONVEYOR/TELE-BELT, AND CRETER; OFF ROAD HAULER
(INCLUDING ARTICULATING AND HAUL TRUCKS); WATER
KOTE MACHINE........................................$ 55.75 30.60
POWER EQUIPMENT OPERATOR (GROUP 1A)
CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE); CRANES-OVER
45 TONS OR 150 FOOT (INCLUDING JIB AND
ATTACHMENTS): (A) CLAMSHELLS, AND DRAGLINES (OVER 3
YARDS), (B) TOWER CRANES; LICENSED WATER/WASTEWATER
TREATMENT OPERATOR; LOADERS OVER 5 YARDS; CERTIFIED
WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE
ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR
PATROL GRADER, DOZER, GRADE TRACTOR (FINISH: WHEN
FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR
ASPHALT); POWER PLANTS: 1000 KW AND OVER; QUAD;
ROTO MILL, PROFILER, AND RECLAIMER; SCRAPERS OVER
40 YARDS; SCREED; SHOVELS, BACKHOES, EXCAVATORS
WITH ALL ATTACHMENTS (OVER 3 YARDS); SIDEBOOMS OVER
45 TONS; SLIP FORM PAVER, C.M.I., AND SIMILAR
TYPES; TOPSIDE (ASPHALT PAVER, SLURRY MACHINE,
SPREADERS, AND SIMILAR TYPES).......................$ 57.95 30.60
POWER EQUIPMENT OPERATOR (GROUP 2) BOILER-FIREMAN;
CEMENT HOGS AND CONCRETE PUMP OPERATORS; CONVEYORS
(EXCEPT AS LISTED IN GROUP I); HOISTS ON STEEL
ERECTION, TOWER-MOBILES, AND AIR TUGGERS;
HORIZONTAL/DIRECTIONAL DRILL LOCATOR; LOCOMOTIVES:
ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING
PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF
SIZE); SKIDDER; TRENCHING MACHINES UNDER 16 INCHES;
WATER/WASTEWATER TREATMENT OPERATOR.................$ 54.80 30.60
POWER EQUIPMENT OPERATOR (GROUP 3) ""A"" FRAME
TRUCKS, DECK WINCHES; BOMBARDIER (TACK OR TOW RIG);
BORING MACHINE; BROOMS-POWER (SWEEPER, ELEVATOR,
VACUUM OR SIMILAR); BUMP CUTTER; COMPRESSOR; FARM
TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR
WINCH TRUCK WITH POLES WHEN USED FOR HOISTING;
HOISTS, AIR TUGGERS, ELEVATORS; LOADERS: (A)
ELEVATING-ATHEY, BARBER GREENE, AND SIMILAR TYPES,
(B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION
JOB SITES), (C) FORKLIFTS WITH TOWER, (D) OVERHEAD
AND FRONT END, UNDER 2 1/2 YARDS; LOCOMOTIVES:
DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS;
MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION;
POSTHOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER
AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200
K.W.; PUMPS-WATER; ROLLERS (OTHER THAN ASPHALT);
SAWS, CONCRETE; SKID HUSTLER; SKID STEER WITH ALL
ATTACHMENTS; STRAIGHTENING MACHINE; STAKE HOPPER;
TOW TRACTOR.........................................$ 53.90 30.60
POWER EQUIPMENT OPERATOR (GROUP 4) CRANE ASSISTANT
ENGINEER/RIG OILER; PARTS AND EQUIPMENT
COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR
SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER;
DRILL HELPER. (FOOTNOTE: A) OPERATION OF ANY
EQUIPMENT REQUIRING A CDL WILL BE PAID AT A GROUP 1
WAGE AND BENEFIT RATE. B) CRANE ASSISTANT
ENGINEER/RIG OILER SHALL BE REQUIRED ON CRANES OVER
85 TONS OR OVER 100 FEET OF BOOM.) .................$ 46.17 30.60
POWER EQUIPMENT OPERATOR GROUP 1 (TUNNEL WORK)
ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND
FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER);
BELTCRETE WITH POWER PACK, AND SIMILAR CONVEYORS;
BENDING MACHINE; BOAT COXSWAINS; BULLDOZER;
CABLEWAYS, HIGHLINES AND CABLE CARS; CLEANING
MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER;
CRANES-45 TONS AND UNDER OR 150 FOOT OF BOOM AND
UNDER (INCLUDING JIB AND ATTACHMENTS): (A)
HYDRA-LIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK
TYPE, (B) DERRICKS, (C) OVERHEAD; CRUSHERS; DECK
WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE
(16 INCH OR OVER); DRAG SCRAPER, YARDER, AND
SIMILAR TYPES; DRILLING MACHINES, CORE, CABLE,
ROTARY, AND EXPLORATION; FINISHING MACHINE
OPERATOR, CONCRETE PAVING, LASER SCREED, AND
SIDEWALK, CURB AND GUTTER MACHINE; GRADE CHECKER
AND/OR LINE AND GRADE INCLUDING DRONE; HELICOPTERS;
HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION,
ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL,
AND SNOW CAT; HYDRO AX: FELLER BUNCHER, AND
SIMILAR; HYDRO EXCAVATION (VAC-TRUCK AND SIMILAR);
LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL
ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND
SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2
YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE
CLAMPS, LOADERS, ELEVATING BELT TYPE, EUCLID, AND
SIMILAR TYPES; MATERIAL TRANSFER VEHICLE (ELEVATING
GRADER, PICKUP MACHINE, AND SIMILAR TYPES);
MECHANICS, WELDERS, BODYMAN, ELECTRICAL, CAMP
MAINTENANCE ENGINEER; MICRO TUNNELING MACHINE;
MIXERS: MOBILE TYPE WITH HOIST COMBINATION; MOTOR
PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL
DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR,
AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER
ENGINEERS, L.B. FOSTER, PULLER, OR SIMILAR PAVING
BREAKER; PLANT OPERATOR (ASPHALT AND CONCRETE);
POWER PLANT, TURBINE OPERATOR, 200 KW AND OVER
(POWER PLANTS OR COMBINATION OF POWER UNITS OVER
300 KW); REMOTE CONTROLLED EQUIPMENT;
SCRAPER-THROUGH 40 YARDS; SERVICE OILER/SERVICE
ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST
MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL
ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER); SUB
GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES);
TACK TRACTOR; TRUCK MOUNTED: CONCRETE PUMP,
CONVEYOR/TELE-BELT, AND CRETER; OFF ROAD HAULER
(INCLUDING ARTICULATING AND HAUL TRUCKS); WATER
KOTE MACHINE. FOOTNOTE: GROUPS 1-4 RECEIVE 10%
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND
WORK................................................$ 61.33 30.60
POWER EQUIPMENT OPERATOR GROUP 1A (TUNNEL WORK)
CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE); CRANES-OVER
45 TONS OR 150 FOOT (INCLUDING JIB AND
ATTACHMENTS): (A) CLAMSHELLS, AND DRAGLINES (OVER 3
YARDS), (B) TOWER CRANES; LICENSED WATER/WASTEWATER
TREATMENT OPERATOR; LOADERS OVER 5 YARDS; CERTIFIED
WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE
ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR
PATROL GRADER, DOZER, GRADE TRACTOR (FINISH: WHEN
FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR
ASPHALT); POWER PLANTS: 1000 KW AND OVER; QUAD;
ROTO MILL, PROFILER, AND RECLAIMER; SCRAPERS OVER
40 YARDS; SCREED; SHOVELS, BACKHOES, EXCAVATORS
WITH ALL ATTACHMENTS (OVER 3 YARDS); SIDEBOOMS OVER
45 TONS; SLIP FORM PAVER, C.M.I., AND SIMILAR
TYPES; TOPSIDE (ASPHALT PAVER, SLURRY MACHINE,
SPREADERS, AND SIMILAR TYPES). FOOTNOTE: GROUPS 1-4
RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR
UNDERGROUND WORK....................................$ 63.75 30.60
POWER EQUIPMENT OPERATOR GROUP 2 (TUNNEL WORK)
BOILER-FIREMAN; CEMENT HOGS AND CONCRETE PUMP
OPERATORS; CONVEYORS (EXCEPT AS LISTED IN GROUP I);
HOISTS ON STEEL ERECTION, TOWER-MOBILES, AND AIR
TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;
LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS;
SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK
DRILL REGARDLESS OF SIZE); SKIDDER; TRENCHING
MACHINES UNDER 16 INCHES; WATER/WASTEWATER
TREATMENT OPERATOR. FOOTNOTE: GROUPS 1-4 RECEIVE
10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND
WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE
REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF
BOOM................................................$ 60.28 30.60
POWER EQUIPMENT OPERATOR GROUP 3 (TUNNEL WORK)""A""
FRAME TRUCKS, DECK WINCHES; BOMBARDIER (TACK OR TOW
RIG); BORING MACHINE; BROOMS-POWER (SWEEPER,
ELEVATOR, VACUUM OR SIMILAR); BUMP CUTTER;
COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL
TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED
FOR HOISTING; HOISTS, AIR TUGGERS, ELEVATORS;
LOADERS: (A) ELEVATING-ATHEY, BARBER GREENE, AND
SIMILAR TYPES, (B) FORKLIFTS OR LUMBER CARRIER (ON
CONSTRUCTION JOB SITES), (C) FORKLIFTS WITH TOWER,
(D) OVERHEAD AND FRONT END, UNDER 2 1/2 YARDS;
LOCOMOTIVES: DINKEY (AIR, STEAM, GAS AND ELECTRIC)
SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER
DISTRIBUTION; POSTHOLE DIGGERS, MECHANICAL; POT
FIREMAN (POWER AGITATED); POWER PLANT, TURBINE
OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLERS
(OTHER THAN ASPHALT); SAWS, CONCRETE; SKID HUSTLER;
SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING
MACHINE; STAKE HOPPER; TOW TRACTOR. FOOTNOTE:
GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING
TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE
ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER
85 TONS OR OVER 100 FEET OF BOOM....................$ 59.29 30.60
POWER EQUIPMENT OPERATOR GROUP 4 (TUNNEL WORK)
CRANE ASSISTANT ENGINEER/RIG OILER; PARTS AND
EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING
MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM
CLEANER; DRILL HELPER. (FOOTNOTE: A) GROUPS 1-4
RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR
UNDERGROUND WORK. B) OPERATION OF ANY EQUIPMENT
REQUIRING A CDL WILL BE PAID AT A GROUP 1 WAGE AND
BENEFIT RATE. C) CRANE ASSISTANT ENGINEER/RIG OILER
SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER
100 FEET OF BOOM.)..................................$ 50.79 30.60
----------------------------------------------------------------
IRON0751-003 07/01/2025
Rates Fringes
IRONWORKER (BENDER OPERATOR)........................$ 46.98 39.48
IRONWORKER (BRIDGE, STRUCTURAL, ORNAMENTAL,
REINFORCING MACHINERY MOVER, RIGGER, SHEETER, STAGE
RIGGER, BENDER OPERATOR)............................$ 46.98 39.48
IRONWORKER (FENCE, BARRIER INSTALLER)...............$ 43.48 39.48
IRONWORKER (GUARDRAIL INSTALLERS)...................$ 44.48 39.48
IRONWORKER (GUARDRAIL LAYOUT MAN)...................$ 44.22 39.48
IRONWORKER (HELICOPTER, TOWER)......................$ 47.89 39.48
----------------------------------------------------------------
LABO0341-001 04/01/2026
Rates Fringes
LABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST
OF LONGITUDE 138 DEGREES) ASPHALT WORKERS
(SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP
MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE
SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE
LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING,
CURING, SCREEDING); CRUSHER PLANT LABORER;
DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN;
ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO
NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE,
OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER;
FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL
LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER
NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR
PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING
WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW);
MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS;
PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR
MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT
TENDER; SAW TENDERS; SCAFFOLD BUILDING AND
ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR
WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK
CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT
INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW
CLEANER.............................................$ 42.25 35.01
LABORER: GROUP 1 TUNNELS, SHAFTS, AND RAISES (SOUTH
OF THE 63RD PARALLEL & WEST OF LONGITUDE 138
DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW);
BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER
TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER,
SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE
HANDLER, GROUTING, CURING, SCREEDING); CRUSHER
PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS;
DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED
TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC
WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH
LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER;
GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS;
HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING);
LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK
(RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET
AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER
TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP
MAN OR MIXER MAN; RAILROAD TRACK LABORER;
SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD
BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER;
STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER
OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR
LABORER AND CONDUIT INSTALLER; WATCHMAN
(CONSTRUCTION PROJECTS); WINDOW CLEANER.............$ 46.48 35.01
LABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST
OF LONGITUDE 138 DEGREES) BURNING AND CUTTING
TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR
BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK
AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER
BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN,
VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE
PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL
SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM
GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM
WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER
OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING
OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED
DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND
MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER,
BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW
OPERATOR; RAILROAD SWITCH LAYOUT LABORER;
SANDBLASTER; SEWER CAULKERS; SEWER PLANT
MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER
FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN........$ 43.25 35.01
LABORER: GROUP 2 TUNNELS, SHAFTS, AND RAISES
(SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138
DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME
DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER;
CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS);
CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS,
PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE
LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL
LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR,
SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE
OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE
OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT
BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE
BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK
ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER
WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT
FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD
SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS;
SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC
APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR,
FILER; TIMBERMAN....................................$ 47.58 35.01
LABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST
OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT
GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER
AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY
SEAL SQUEEGEE MAN...................................$ 44.15 35.01
LABORER: GROUP 3 TUNNELS, SHAFTS, AND RAISES
(SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138
DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL
MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH
SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN........$ 48.57 35.01
LABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL &
WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER,
ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE
FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO,
WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS);
POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER
(ALL TYPE DRILLS); PIPELAYERS.......................$ 48.68 35.01
LABORER: GROUP 3A TUNNELS, SHAFTS, AND RAISES
(SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138
DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY
DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS
(INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR
TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER
DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS);
PIPELAYERS..........................................$ 53.55 35.01
LABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL &
WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER
(SETTING OR TRANSFERING OF GRADE MARKS, LINE AND
GRADE)..............................................$ 57.71 29.06
LABORER: GROUP 3B TUNNELS, SHAFTS, AND RAISES
(SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138
DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF
GRADE MARKS, LINE AND GRADE)........................$ 63.48 29.06
LABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST
OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS.........$ 31.82 35.01
----------------------------------------------------------------
LABO0942-001 04/01/2026
Rates Fringes
LABORER: GROUP 1 (NORTH OF THE 63RD PARALLEL & EAST
OF LONGITUDE 138 DEGREES) ASPHALT WORKERS
(SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP
MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE
SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE
LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING,
CURING, SCREEDING); CRUSHER PLANT LABORER;
DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN;
ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO
NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE,
OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER;
FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL
LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER
NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR
PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING
WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW);
MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS;
PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR
MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT
TENDER; SAW TENDERS; SCAFFOLD BUILDING AND
ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR
WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK
CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT
INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW
CLEANER.............................................$ 42.25 35.01
LABORER: GROUP 1 TUNNELS, SHAFTS, AND RAISES (NORTH
OF THE 63RD PARALLEL & EAST OF LONGITUDE 138
DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW);
BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER
TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER,
SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE
HANDLER, GROUTING, CURING, SCREEDING); CRUSHER
PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS;
DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED
TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC
WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH
LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER;
GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS;
HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING);
LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK
(RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET
AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER
TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP
MAN OR MIXER MAN; RAILROAD TRACK LABORER;
SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD
BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER;
STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER
OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR
LABORER AND CONDUIT INSTALLER; WATCHMAN
(CONSTRUCTION PROJECTS); WINDOW CLEANER.............$ 46.48 35.01
LABORER: GROUP 2 (NORTH OF THE 63RD PARALLEL & EAST
OF LONGITUDE 138 DEGREES) BURNING AND CUTTING
TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR
BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK
AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER
BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN,
VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE
PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL
SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM
GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM
WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER
OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING
OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED
DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND
MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER,
BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW
OPERATOR; RAILROAD SWITCH LAYOUT LABORER;
SANDBLASTER; SEWER CAULKERS; SEWER PLANT
MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER
FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN........$ 43.25 35.01
LABORER: GROUP 2 TUNNELS, SHAFTS, AND RAISES (NORTH
OF THE 63RD PARALLEL & EAST OF LONGITUDE 138
DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME
DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER;
CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS);
CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS,
PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE
LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL
LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR,
SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE
OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE
OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT
BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE
BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK
ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER
WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT
FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD
SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS;
SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC
APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR,
FILER; TIMBERMAN....................................$ 47.58 35.01
LABORER: GROUP 3 (NORTH OF THE 63RD PARALLEL & EAST
OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT
GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER
AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY
SEAL SQUEEGEE MAN...................................$ 44.15 35.01
LABORER: GROUP 3 TUNNELS, SHAFTS, AND RAISES (NORTH
OF THE 63RD PARALLEL & EAST OF LONGITUDE 138
DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL
MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH
SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN........$ 48.57 35.01
LABORER: GROUP 3A (NORTH OF THE 63RD PARALLEL &
EAST OF LONGITUDE 138 DEGREES) ASPHALT RAKER,
ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE
FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO,
WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS);
POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER
(ALL TYPE DRILLS); PIPELAYERS.......................$ 48.68 35.01
LABORER: GROUP 3A TUNNELS, SHAFTS, AND RAISES
(NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138
DEGREES); ASPHALT RAKER, ASPHALT BELLY DUMP LAY
DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS
(INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR
TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER
DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS);
PIPELAYERS..........................................$ 53.55 35.01
LABORER: GROUP 3B (NORTH OF THE 63RD PARALLEL &
EAST OF LONGITUDE 138 DEGREES) GRADE CHECKER
(SETTING OR TRANSFERING OF GRADE MARKS, LINE AND
GRADE)..............................................$ 57.71 29.06
LABORER: GROUP 3B TUNNELS, SHAFTS, AND RAISES
(NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138
DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF
GRADE MARKS, LINE AND GRADE)........................$ 63.48 29.06
LABORER: GROUP 4 (NORTH OF THE 63RD PARALLEL & EAST
OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP ..$ 31.82 35.01
----------------------------------------------------------------
PAIN1959-001 07/01/2025
Rates Fringes
PAINTER: BRUSH/ROLLER PAINT OR WALL COVERER (NORTH
OF THE 63RD PARALLEL)...............................$ 43.05 26.45
PAINTER: TAPING, TEXTURING, STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER, FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT
ABATEMENT, HAZARDOUS MATERIAL HANDLER (NORTH OF THE
63RD PARALLEL)......................................$ 43.57 26.45
----------------------------------------------------------------
PAIN1959-002 07/01/2025
Rates Fringes
PAINTER: GENERAL PAINTER (SOUTH OF THE 63RD
PARALLEL)...........................................$ 37.29 30.20
PAINTER: INDUSTRIAL PAINTER (SOUTH OF THE 63RD
PARALLEL)...........................................$ 38.64 30.20
PAINTER: TAPER / PAPER & VINYL HANGER (SOUTH OF THE
63RD PARALLEL)......................................$ 38.54 30.20
----------------------------------------------------------------
PAIN1959-003 07/01/2025
Rates Fringes
GLAZIER (NORTH OF THE 63RD PARALLEL)................$ 46.76 30.46
----------------------------------------------------------------
PAIN1959-004 07/01/2025
Rates Fringes
FLOOR LAYER: CARPET................................$ 39.48 16.25
----------------------------------------------------------------
PAIN1959-006 07/01/2025
Rates Fringes
GLAZIER (SOUTH OF THE 63RD PARALLEL)................$ 47.42 29.10
----------------------------------------------------------------
PLAS0528-006 04/01/2025
Rates Fringes
PLASTERER (NORTH OF THE 63RD PARALLEL)............$ 49.28 22.28
PLASTERER (SOUTH OF THE 63RD PARALLEL)............$ 49.28 22.28
----------------------------------------------------------------
PLAS0528-007 04/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (NORTH OF THE 63RD
PARALLEL)...........................................$ 49.28 22.28
CEMENT MASON/CONCRETE FINISHER (SOUTH OF THE 63RD
PARALLEL)...........................................$ 49.28 22.28
----------------------------------------------------------------
PLUM0262-002 01/01/2023
Rates Fringes
PLUMBER; STEAMFITTER (EAST OF THE 141ST MERIDIAN).$ 41.50 27.62
----------------------------------------------------------------
PLUM0367-002 09/01/2025
Rates Fringes
PLUMBER; STEAMFITTER (SOUTH OF THE 63RD PARALLEL).$ 50.00 33.20
----------------------------------------------------------------
PLUM0375-002 07/01/2025
Rates Fringes
PLUMBER; STEAMFITTER (NORTH OF THE 63RD PARALLEL).$ 55.66 34.90
----------------------------------------------------------------
PLUM0669-002 04/01/2025
Rates Fringes
SPRINKLER FITTER....................................$ 60.67 31.39
----------------------------------------------------------------
ROOF0189-006 04/01/2025
Rates Fringes
ROOFER..............................................$ 52.07 19.62
----------------------------------------------------------------
SHEE0023-003 07/01/2026
Rates Fringes
SHEET METAL WORKER (SOUTH OF THE 63RD PARALLEL)...$ 55.10 31.72
----------------------------------------------------------------
SHEE0023-004 07/01/2026
Rates Fringes
SHEET METAL WORKER (NORTH OF THE 63RD PARALLEL)...$ 59.85 32.35
----------------------------------------------------------------
TEAM0959-003 01/01/2025
Rates Fringes
TRUCK DRIVER (GROUP 1) SEMI WITH DOUBLE BOX MIXER;
DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH
PUPS) OVER 40 YARDS UP TO AND INCLUDING 60 YARDS;
DELTAS, COMMANDERS, ROLLOGANS AND SIMILAR EQUIPMENT
WHEN PULLING SLEDS, TRAILERS OR SIMILAR EQUIPMENT;
BOAT COXSWAIN; LOWBOYS INCLUDING ATTACHED TRAILERS
AND JEEPS, UP TO AND INCLUDING 12 AXLES; READY-MIX
OVER 12 YARDS UP TO AND INCLUDING 15 YARDS); WATER
WAGON (250 BBLS AND ABOVE); TIREMAN, HEAVY
DUTY/FUELER.........................................$ 51.58 26.43
TRUCK DRIVER (GROUP 1A) DUMP TRUCKS (INCLUDING
ROCKBUGGY AND TRUCKS WITH PUPS) OVER 60 YARDS UP TO
AND INCLUDING 100 YARDS; JEEPS (DRIVER UNDER LOAD)..$ 53.05 26.43
TRUCK DRIVER (GROUP 2) TURN-O-WAGON OR DW-10 NOT
SELF-LOADING; ALL DELTAS, COMMANDERS, ROLLOGANS,
AND SIMILAR EQUIPMENT; MECHANICS; DUMP TRUCKS
(INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 20
YARDS UP TO AND INCLUDING 40 YARDS; LOWBOYS
INCLUDING ATTACHED TRAILERS AND JEEPS UP TO AND
INCLUDING 8 AXLES; SUPER VAC TRUCK/CACASCO
TRUCK/HEAT STRESS TRUCK; READY-MIX OVER 7 YARDS UP
TO AND INCLUDING 12 YARDS; PARTSMAN; STRINGING
TRUCK...............................................$ 50.12 26.43
TRUCK DRIVER (GROUP 3) DUMP TRUCKS (INCLUDING
ROCKBUGGY AND TRUCKS WITH PUPS) OVER 10 YARDS UP TO
AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND
UP; OIL DISTRIBUTOR DRIVERS; OIL DISTRIBUTOR
DRIVERS; TRUCKS/JEEPS (PUSH OR PULL); TRAFFIC
CONTROL TECHNICIAN..................................$ 49.17 26.43
TRUCK DRIVER (GROUP 4) BUGGYMOBILE; SEMI OR TRUCK
AND TRAILER; DUMPSTER; TIREMAN (LIGHT DUTY); DUMP
TRUCKS (INCLUDING ROCKBUGGY AND TRUCK WITH PUPS) UP
TO AND INCLUDING 10 YARDS; TRACK TRUCK EQUIPMENT;
GREASE TRUCK; FLAT BEDS, DUAL REAR AXLE; HYSTER
OPERATORS (HANDLING BULK AGGREGATE); LUMBER
CARRIER; WATER WAGON, SEMI; WATER TRUCK, DUAL AXLE;
GIN POLE TRUCK, WINCH TRUCK, WRECKER, TRUCK MOUNTED
""A"" FRAME MANUFACTURED RATING OVER 5 TONS; BULL
LIFTS AND FORK LIFTS WITH POWER BOOM AND SWING
ATTACHMENTS, OVER 5 TONS; FRONT END LOADER WITH
FORKS; BUS OPERATOR OVER 30 PASSENGERS; ALL TERRAIN
VEHICLES; BOOM TRUCK/KNUCKLE TRUCK OVER 5 TONS;
FOAM DISTRIBUTOR TRUCK/DUAL AXLE; HYDRO-SEEDERS,
DUAL AXLE; VACUUM TRUCKS, TRUCK VACUUM SWEEPERS;
LOADMASTER (AIR AND WATER); AIR CUSHION OR SIMILAR
TYPE VEHICLE; FIRE TRUCK/AMBULANCE DRIVER;
COMBINATION TRUCK-FUEL AND GREASE; COMPACTOR (WHEN
PULLED BY RUBBER TIRED EQUIPMENT); RIGGER
(AIR/WATER/OILFIELD); READY MIX, UP TO AND
INCLUDING 7 YARDS;..................................$ 48.50 26.43
TRUCK DRIVER (GROUP 5) GRAVEL SPREADER BOX OPERATOR
ON TRUCK; FLAT BEDS, SINGLE REAR AXLE; BOOM
TRUCK/KNUCKLE TRUCK UP TO AND INCLUDING 5 TONS;
PICKUPS (PILOT CARS AND ALL LIGHT DUTY VEHICLES);
WATER WAGON (BELOW 250 BBLS); GIN POLE TRUCK, WINCH
TRUCK, WRECKER, TRUCK MOUNTED ""A"" FRAME,
MANUFACTURED RATING 5 TONS AND UNDER; BULL LIFTS
AND FORK LIFTS (FORK LIFTS WITH POWER BROOM AND
SWING ATTACHMENTS UP TO AND INCLUDING 5 TONS);
BUFFER TRUCK; TACK TRUCK; FARM TYPE RUBBER TIRED
TRACTOR (WHEN MATERIAL HANDLING OR PULLING WAGONS
ON A CONSTRUCTION PROJECT); FOAM DISTRIBUTOR,
SINGLE AXLE; HYDRO-SEEDERS, SINGLE AXLE; TEAM
DRIVERS (HORSES, MULES AND SIMILAR EQUIPMENT); FUEL
HANDLER (STATION/BULK ATTENDANT); BATCH TRUCK, UP
TO AND INCLUDING 7 YARDS; GEAR/SUPPLY TRUCK; BUS
OPERATOR, UP TO 30 PASSENGERS; RIGGER/SWAMPER.......$ 47.62 26.43
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""""SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The """"SU"""" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The """"SA"""" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
[email protected] or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to [email protected] or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to [email protected] or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"