Tulare County, California Davis-Bacon Wage Rates: Heavy and Highway
Updated
Federal prevailing wage rates (Davis-Bacon) for heavy and highway construction in Tulare County, California: 79 classifications, base rates from $28.94 to $65.56 an hour plus fringe benefits. General decision CA20260021, modification 2, published May 18, 2026.
| Type | Davis-Bacon (construction) |
|---|---|
| Number | CA20260021 |
| Modification | 2 |
| Published | May 18, 2026 |
| State | California |
| Area | California Counties of Tulare |
| Construction type | Heavy and Highway |
Wage rates and fringe benefits (79)
| Classification | Base rate | Fringe | Total | California median |
|---|---|---|---|---|
| Boilermaker | $45.60 | $38.99 | $84.59 | |
| Marble Finisher | $42.06 | $19.80 | $61.86 | |
| Tile Layer | $50.28 | $22.05 | $72.33 | $56.79 (-$6.51) |
| Tile Finisher | $32.68 | $18.32 | $51.00 | $35.78 (-$3.10) |
| Terrazzo Worker/Setter | $60.58 | $29.79 | $90.37 | |
| Terrazzo Finisher | $44.93 | $20.98 | $65.91 | |
| Piledriver | $54.10 | $34.69 | $88.79 | |
| Carpenters: Millwright | $47.92 | $32.41 | $80.33 | |
| Carpenters: Journeyman Carpenter | $45.42 | $30.82 | $76.24 | |
| Carpenters: Bridge Builder/Highway Carpenter | $52.65 | $30.82 | $83.47 | |
| Carpenters (Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer) | $45.57 | $30.82 | $76.39 | |
| Electrician | $50.00 | $30.15 | $80.15 | |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Truck crane oiler) | $45.12 | $31.15 | $76.27 | $45.12 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Oiler) | $42.89 | $31.15 | $74.04 | $45.12 (-$2.23) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Lifting devices) | $49.14 | $31.15 | $80.29 | $45.12 (+$4.02) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Truck crane oiler) | $45.41 | $31.15 | $76.56 | $45.41 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Oiler) | $43.11 | $31.15 | $74.26 | $45.41 (-$2.30) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Lifting devices) | $50.82 | $31.15 | $81.97 | $45.41 (+$5.41) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Truck crane oiler) | $45.66 | $31.15 | $76.81 | $45.66 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Oiler) | $43.38 | $31.15 | $74.53 | $45.66 (-$2.28) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Lifting devices) | $52.64 | $31.15 | $83.79 | $45.66 (+$6.98) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 5) | $58.09 | $32.53 | $90.62 | $61.03 (-$2.94) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 4) | $59.23 | $32.53 | $91.76 | $61.03 (-$1.80) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 3) | $60.37 | $32.53 | $92.90 | $61.03 (-$0.66) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 2) | $61.70 | $32.53 | $94.23 | $61.03 (+$0.67) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1-a) | $65.43 | $32.53 | $97.96 | $61.03 (+$4.40) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1) | $62.96 | $32.53 | $95.49 | $61.03 (+$1.93) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 5) | $58.19 | $32.53 | $90.72 | $61.13 (-$2.95) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 4) | $59.33 | $32.53 | $91.86 | $61.13 (-$1.80) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 3) | $60.47 | $32.53 | $93.00 | $61.13 (-$0.66) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 2) | $61.80 | $32.53 | $94.33 | $61.13 (+$0.66) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1-a) | $65.53 | $32.53 | $98.06 | $61.13 (+$4.40) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1) | $63.06 | $32.53 | $95.59 | $61.13 (+$1.93) |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Hydraulic) | $60.61 | $32.53 | $93.14 | $63.09 (-$2.48) |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Cranes) | $65.56 | $32.53 | $98.09 | $63.09 (+$2.48) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Truck crane oiler) | $45.12 | $31.15 | $76.27 | $45.12 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Oiler) | $42.89 | $31.15 | $74.04 | $45.12 (-$2.23) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Lifting devices) | $49.14 | $31.15 | $80.29 | $45.12 (+$4.02) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Truck crane oiler) | $45.41 | $31.15 | $76.56 | $45.41 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Oiler) | $43.11 | $31.15 | $74.26 | $45.41 (-$2.30) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Lifting devices) | $50.82 | $31.15 | $81.97 | $45.41 (+$5.41) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Truck crane oiler) | $45.66 | $31.15 | $76.81 | $45.66 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Oiler) | $43.38 | $31.15 | $74.53 | $45.66 (-$2.28) |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Lifting devices) | $52.64 | $31.15 | $83.79 | $45.66 (+$6.98) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 5) | $58.09 | $32.53 | $90.62 | $61.03 (-$2.94) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 4) | $59.23 | $32.53 | $91.76 | $61.03 (-$1.80) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 3) | $60.37 | $32.53 | $92.90 | $61.03 (-$0.66) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 2) | $61.70 | $32.53 | $94.23 | $61.03 (+$0.67) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1-a) | $65.43 | $32.53 | $97.96 | $61.03 (+$4.40) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1) | $62.96 | $32.53 | $95.49 | $61.03 (+$1.93) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 5) | $58.19 | $32.53 | $90.72 | $61.13 (-$2.95) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 4) | $59.33 | $32.53 | $91.86 | $61.13 (-$1.80) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 3) | $60.47 | $32.53 | $93.00 | $61.13 (-$0.66) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 2) | $61.80 | $32.53 | $94.33 | $61.13 (+$0.66) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1-a) | $65.53 | $32.53 | $98.06 | $61.13 (+$4.40) |
| Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1) | $63.06 | $32.53 | $95.59 | $61.13 (+$1.93) |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Hydraulic) | $60.61 | $32.53 | $93.14 | $63.09 (-$2.48) |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Cranes) | $65.56 | $32.53 | $98.09 | $63.09 (+$2.48) |
| Operator: Power Equipment, Landscape Work Only: Group 3 (Area 2) | $49.64 | $28.56 | $78.20 | |
| Operator: Power Equipment, Landscape Work Only: Group 3 (Area 1) | $47.64 | $28.56 | $76.20 | |
| Operator: Power Equipment, Landscape Work Only: Group 2 (Area 2) | $54.25 | $28.56 | $82.81 | |
| Operator: Power Equipment, Landscape Work Only: Group 2 (Area 1) | $52.25 | $28.56 | $80.81 | |
| Operator: Power Equipment, Landscape Work Only: Group 1 (Area 2) | $57.85 | $28.56 | $86.41 | |
| Operator: Power Equipment, Landscape Work Only: Group 1 (Area 1) | $55.85 | $28.56 | $84.41 | |
| Ironworker (Ornamental, Reinforcing and Structural) | $50.70 | $35.15 | $85.85 | |
| Ironworker (Fence Erector) | $45.78 | $26.51 | $72.29 | |
| Laborer: Traffic Control/Lane Closure: Escort Driver, Flag Person | $36.26 | $27.30 | $63.56 | |
| GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction) | $35.25 | $27.30 | $62.55 | $32.09 (+$3.16) |
| GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment Warranty Period) | $28.94 | $27.30 | $56.24 | $32.09 (-$3.15) |
| Tunnel and Shaft Laborers: Shotcrete Specialist (Tulare County) | $46.41 | $27.72 | $74.13 | |
| Tunnel and Shaft Laborers: Group 5 Grout Crew; Reboundman; Swamper/ Brakeman (Tulare County) | $44.42 | $27.72 | $72.14 | |
| Tunnel and Shaft Laborers: Group 2 Rodmen; Shaft Work & Raise (Below Actual or Excavated Ground Level) (Tulare County) | $45.66 | $27.72 | $73.38 | |
| Tunnel and Shaft Laborers: Group 1 Diamond Driller; Groundmen; Gunite and Shotcrete Nozzlemen (Tulare County) | $45.89 | $27.72 | $73.61 | |
| Plasterer Tender Work on a Swing Stage Scaffold: $1.00 per Hour Additional | $39.77 | $28.54 | $68.31 | |
| Parking Lot Striping/Highway Marking: Highway Improvement: Group 3 Protective Coating, Pavement Sealing | $35.11 | $17.62 | $52.73 | |
| Parking Lot Striping/Highway Marking: Highway Improvememt: Group 2 Gamecourt & Playground Installer | $34.71 | $17.62 | $52.33 | |
| Cement Mason/Concrete Finisher | $32.15 | $23.27 | $55.42 | |
| Plumber & Steamfitter | $51.65 | $41.59 | $93.24 | |
| Underground Utility Worker / Landscape Fitter | $36.01 | $18.50 | $54.51 |
The median is the middle rate for the same work across California's heavy and highway wage determinations in force today, shown when at least three have it.
How to use these rates
On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.
Other Davis-Bacon heavy and highway wage determinations in California
- 4 Counties in California CA20260004
All California prevailing wage rates · Open federal bids in California
Full text of CA20260021
Show the official text (91,382 characters)
General Decision Number: CA20260021 05/18/2026
State: California
Construction Types: Heavy and Highway
Counties: California Counties of
Tulare
Includes Dredging Projects (does not include self-propelled hopper dredge work); Excludes water well drilling
Modification Number Publication Date
1 01/09/2026
2 05/18/2026
ASBE0016-006 05/01/2025
Rates Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT)...............$ 35.31 12.75
----------------------------------------------------------------
ASBE0016-010 01/01/2024
Rates Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO
ALL TYPES OF MECHANICAL SYSTEMS)....................$ 64.56 25.07
----------------------------------------------------------------
BOIL0549-004 01/01/2021
Rates Fringes
BOILERMAKER.........................................$ 45.60 38.99
----------------------------------------------------------------
BRCA0003-001 08/01/2024
Rates Fringes
MARBLE FINISHER.....................................$ 42.06 19.80
----------------------------------------------------------------
BRCA0003-016 04/01/2024
Rates Fringes
TILE LAYER..........................................$ 50.28 22.05
TILE FINISHER.......................................$ 32.68 18.32
----------------------------------------------------------------
BRCA0003-017 07/01/2024
Rates Fringes
TERRAZZO WORKER/SETTER..............................$ 60.58 29.79
TERRAZZO FINISHER...................................$ 44.93 20.98
----------------------------------------------------------------
BRCA0004-005 05/01/2024
Rates Fringes
BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR
PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA
LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS,
NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA
STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE THE
STANDARD SAN BERNARDINO/RIVERSIDE COUNTY HOURLY
WAGE RATE...........................................$ 45.53 20.29
----------------------------------------------------------------
CARP0034-002 07/01/2021
Rates Fringes
DIVER: MANIFOLD OPERATOR (STANDBY) DEPTH PAY
(SURFACE DIVING): 050 TO 100 FT $2.00 PER
FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00
PER FOOT SATURATION DIVING: THE STANDBY RATE
SHALL APPLY UNTIL SATURATION STARTS. THE
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 59.51 34.69
DIVER: MANIFOLD OPERATOR (MIXED GAS) DEPTH PAY
(SURFACE DIVING): 050 TO 100 FT $2.00 PER
FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO
220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00
PER FOOT SATURATION DIVING: THE STANDBY RATE
SHALL APPLY UNTIL SATURATION STARTS. THE
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 64.51 34.69
DIVER: DIVER WET DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT
$3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT
221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.
DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.
WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES
WORKING IN ANY COMBINATION OF CLASSIFICATIONS
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT.........................$ 103.62 34.69
DIVER: DIVER TENDER DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT
$3.00 PER FOOT 151 TO 220 FT $4.00 PER
FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.
DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.
WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES
WORKING IN ANY COMBINATION OF CLASSIFICATIONS
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT.........................$ 59.51 34.69
DIVER: DIVER STANDBY DEPTH PAY (SURFACE DIVING):
050 TO 100 FT $2.00 PER FOOT 101 TO 150
FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER
FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION
DIVING: THE STANDBY RATE SHALL APPLY UNTIL
SATURATION STARTS. THE SATURATION DIVING RATE
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.
DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE
FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED
FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT.
WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK
IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES
WORKING IN ANY COMBINATION OF CLASSIFICATIONS
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE
HIGHEST RATE FOR THAT SHIFT.........................$ 60.51 34.69
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN
DEPTH PAY (SURFACE DIVING): 050 TO 100 FT
$2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT
151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER
$5.00 PER FOOT SATURATION DIVING: THE STANDBY
RATE SHALL APPLY UNTIL SATURATION STARTS. THE
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE
PAID FOR ALL SATURATION HOURS. DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT. WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT......................................$ 54.10 34.69
----------------------------------------------------------------
CARP0034-003 07/01/2021
Rates Fringes
PILEDRIVER..........................................$ 54.10 34.69
----------------------------------------------------------------
CARP1109-002 07/01/2020
Rates Fringes
CARPENTERS: MILLWRIGHT..............................$ 47.92 32.41
CARPENTERS: JOURNEYMAN CARPENTER....................$ 45.42 30.82
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER........$ 52.65 30.82
CARPENTERS (HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER).................................$ 45.57 30.82
----------------------------------------------------------------
ELEC0100-001 09/01/2025
Rates Fringes
ELECTRICIAN.........................................$ 50.00 30.15
----------------------------------------------------------------
ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY.......................................$ 40.76 21.76
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST
(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND
BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE
EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS DAY, THANKSGIVING DAY AND DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 53.30 22.26
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER
HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY.......................................$ 70.16 24.71
----------------------------------------------------------------
ENGI0003-006 06/29/2020
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 3 (Truck crane oiler).........................$ 45.12 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 3 (Oiler).....................................$ 42.89 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 3 (Lifting devices)...........................$ 49.14 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 2 (Truck crane oiler).........................$ 45.41 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 2 (Oiler).....................................$ 43.11 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 2 (Lifting devices)...........................$ 50.82 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 1 (Truck crane oiler).........................$ 45.66 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 1 (Oiler).....................................$ 43.38 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 1 (Lifting devices)...........................$ 52.64 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:
LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 42.50 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:
LIFTING DEVICES: GROUP 5: DECK ENGINEER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL. ..$ 44.73 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:
LIFTING DEVICES: GROUP 4: ASSISTANT OPERATOR IN
LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS
AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER FOOTNOTE:
WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A
YO-YO CAT: $.60 PER HOUR ADDITIONAL. ..........$ 47.47 31.15
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 5)..............$ 58.09 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 4)..............$ 59.23 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 3)..............$ 60.37 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 2)..............$ 61.70 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)............$ 65.43 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1)..............$ 62.96 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)...$ 58.19 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)...$ 59.33 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)...$ 60.47 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)...$ 61.80 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)...$ 63.06 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:CRANE: GROUP 5: BOOM CAT FOOTNOTE: WORK
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO
CAT: $.60 PER HOUR ADDITIONAL.......................$ 62.24 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 3 (Hydraulic).............................$ 60.61 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 3 (Cranes)................................$ 65.56 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS;
DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE
LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER
CRANE FOOTNOTE: WORK SUSPENDED BY ROPES OR
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 67.04 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: CRANES: GROUP 1: CRANE OVER 100 TONS; DERRICK
OVER 100 TONS; SELF- PROPELLED BOOM-TYPE LIFTING
DEVICE OVER 100 TONS FOOTNOTE: WORK SUSPENDED BY
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER
HOUR ADDITIONAL.....................................$ 68.81 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS
AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER GROUP
5: BOOM CAT FOOTNOTE: WORK SUSPENDED BY ROPES OR
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 63.54 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:CRANES GROUP 2: CLAMSHELL AND DRAGLINE
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.;
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS;
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 66.08 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: CRANES GROUP 3: CLAMSHELL AND DRAGLINE
UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45
TONS AND UNDER; FOOTNOTE: WORK SUSPENDED BY ROPES
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 64.34 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: CRANES GROUP 4: BOOM TRUCK OR DUAL
PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS;
TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING
DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15
TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE
LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) -
UNDER 15 TONS; FOOTNOTE: WORK SUSPENDED BY
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER
HOUR ADDITIONAL.....................................$ 61.30 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: CRANES GROUP 1: CLAMSHELL AND DRAGLINE
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK,
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE,
OVER 100 TONS FOOTNOTE: WORK SUSPENDED BY ROPES
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 68.59 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A
ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743
SERIES OR SMALLER, AND SIMILAR (WITHOUT
ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P.
(BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES,
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 55.49 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 BIT
SHARPENER; BOILER TENDER; BOX OPERATOR;
BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR
(SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND;
FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR;
GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC
MONITOR; KEN SEAL MACHINE (OR SIMILAR);
MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION
PLANT; RESERVOIR-DEBRIS TUG (SELF- PROPELLED
FLOATING); ROSS CARRIER (CONSTRUCTION SITE);
ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE;
SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR
(INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR;
SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER;
TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT;
WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY)
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 57.70 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST
REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME
TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR
SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER;
DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.;
FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR;
HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT
LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE
(VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL
FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM);
MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR
WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING
MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST
DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL;
SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE
CURING MAHCINE (ON STREETS, HIGHWAYS, AIRPORTS AND
CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER);
SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR
CONCRETE FORMS); TIE SPACER; TOWER MOBILE;
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO
AND INCLUDING 5 FT. DEPTH; TRUCK- TYPE LOADER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 58.84 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6
ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER;
BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT
ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL
GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING
MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT
ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK
ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200
SERIES OR SIMILAR UP TO AND INCLUDING 30 FT.
M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR;
HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER
LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR
(WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR
SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT
BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR
COMBINATION; PAVING FABRIC INSTALLATION AND/OR
LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES
ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND
SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE
PAVING); SELF- PROPELLED PIPELINE WRAPPING MACHINE;
TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER
MOVING MACHINE FOOTNOTE: WORK SUSPENDED BY ROPES
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 59.98 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5
CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION
SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR
CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE
CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE
GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR
SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL
(NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR
JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR
MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE)
(CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR
TYPES); MECHANICAL BURM, CURB AND/OR CURB AND
GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT
HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR
(SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED
(AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR
WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER;
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5
FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 61.30 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4 ASPHALT
PLANT ENGINEER/BOX PERSON; CHICAGO BOOM;
COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING
3/4 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY);
DOZER AND/OR PUSH CAT; PULL- TYPE ELEVATING LOADER;
GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR
OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING
SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT,
HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY
REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER
UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER
(MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR
SPREADER MACHINE (ASPHALT, BARBER-GREENE AND
SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR
SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS;
POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT;
RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS,
ETC.); RUBBER- TIRED EARTHMOVING EQUIPMENT
(SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL
TRACTOR WITH DRAG; SOIL STABILIZER (P & H OR
EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE
RIG; UNLICENSED CONSTUCTION WORK BOAT OPERATOR, ON
SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.;
TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL
COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR
PUGMILL EQUIPMENT) FOOTNOTE: WORK SUSPENDED BY
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER
HOUR ADDITIONAL.....................................$ 62.57 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT
MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE
AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE
BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC;
CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE,
TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT,
TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL;
HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4
CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE
ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER
SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS
WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR
LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL
EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER
HOUR) FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES,
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 63.95 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2
HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU.
YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK
BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR
(FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND
INCLUDING 7 CU. YDS. M.R.C. FOOTNOTE: WORK
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO
CAT: $.60 PER HOUR ADDITIONAL.......................$ 65.43 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1
OPERATOR OF HELICOPTER (WHEN USED IN ERECTION
WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER;
POWER SHOVELS, OVER 7 CU. YDS. FOOTNOTE: WORK
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO
CAT: $.60 PER HOUR ADDITIONAL.......................$ 66.96 32.53
----------------------------------------------------------------
ENGI0003-006 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 3 (Truck crane oiler).........................$ 45.12 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 3 (Oiler).....................................$ 42.89 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 3 (Lifting devices)...........................$ 49.14 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 2 (Truck crane oiler).........................$ 45.41 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 2 (Oiler).....................................$ 43.11 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 2 (Lifting devices)...........................$ 50.82 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 1 (Truck crane oiler).........................$ 45.66 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 1 (Oiler).....................................$ 43.38 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1::
GROUP 1 (Lifting devices)...........................$ 52.64 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:
LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 42.50 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:
LIFTING DEVICES: GROUP 5: DECK ENGINEER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL. ..$ 44.73 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:
LIFTING DEVICES: GROUP 4: ASSISTANT OPERATOR IN
LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS
AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER FOOTNOTE:
WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A
YO-YO CAT: $.60 PER HOUR ADDITIONAL. ..........$ 47.47 31.15
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 5)..............$ 58.09 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 4)..............$ 59.23 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 3)..............$ 60.37 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 2)..............$ 61.70 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)............$ 65.43 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: UNDERGROUND: (GROUP 1)..............$ 62.96 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)...$ 58.19 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)...$ 59.33 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)...$ 60.47 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)...$ 61.80 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)...$ 63.06 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:CRANE: GROUP 5: BOOM CAT FOOTNOTE: WORK
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO
CAT: $.60 PER HOUR ADDITIONAL.......................$ 62.24 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 3 (Hydraulic).............................$ 60.61 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1:: GROUP 3 (Cranes)................................$ 65.56 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS;
DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE
LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER
CRANE FOOTNOTE: WORK SUSPENDED BY ROPES OR
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 67.04 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: CRANES: GROUP 1: CRANE OVER 100 TONS; DERRICK
OVER 100 TONS; SELF- PROPELLED BOOM-TYPE LIFTING
DEVICE OVER 100 TONS FOOTNOTE: WORK SUSPENDED BY
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER
HOUR ADDITIONAL.....................................$ 68.81 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA
1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS
AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER GROUP
5: BOOM CAT FOOTNOTE: WORK SUSPENDED BY ROPES OR
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 63.54 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1:CRANES GROUP 2: CLAMSHELL AND DRAGLINE
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.;
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS;
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 66.08 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: CRANES GROUP 3: CLAMSHELL AND DRAGLINE
UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45
TONS AND UNDER; FOOTNOTE: WORK SUSPENDED BY ROPES
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 64.34 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: CRANES GROUP 4: BOOM TRUCK OR DUAL
PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS;
TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING
DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15
TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE
LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) -
UNDER 15 TONS; FOOTNOTE: WORK SUSPENDED BY
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER
HOUR ADDITIONAL.....................................$ 61.30 32.53
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS
- AREA 1: CRANES GROUP 1: CLAMSHELL AND DRAGLINE
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK,
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE,
OVER 100 TONS FOOTNOTE: WORK SUSPENDED BY ROPES
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 68.59 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A
ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743
SERIES OR SMALLER, AND SIMILAR (WITHOUT
ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P.
(BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES,
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 55.49 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 BIT
SHARPENER; BOILER TENDER; BOX OPERATOR;
BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR
(SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND;
FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR;
GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC
MONITOR; KEN SEAL MACHINE (OR SIMILAR);
MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION
PLANT; RESERVOIR-DEBRIS TUG (SELF- PROPELLED
FLOATING); ROSS CARRIER (CONSTRUCTION SITE);
ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE;
SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR
(INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR;
SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER;
TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT;
WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY)
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 57.70 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST
REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME
TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR
SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER;
DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.;
FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR;
HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT
LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE
(VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL
FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM);
MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR
WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING
MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST
DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL;
SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE
CURING MAHCINE (ON STREETS, HIGHWAYS, AIRPORTS AND
CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER);
SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR
CONCRETE FORMS); TIE SPACER; TOWER MOBILE;
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO
AND INCLUDING 5 FT. DEPTH; TRUCK- TYPE LOADER
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 58.84 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6
ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER;
BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT
ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL
GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING
MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT
ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK
ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200
SERIES OR SIMILAR UP TO AND INCLUDING 30 FT.
M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR;
HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER
LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR
(WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR
SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT
BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR
COMBINATION; PAVING FABRIC INSTALLATION AND/OR
LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES
ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND
SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE
PAVING); SELF- PROPELLED PIPELINE WRAPPING MACHINE;
TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER
MOVING MACHINE FOOTNOTE: WORK SUSPENDED BY ROPES
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR
ADDITIONAL..........................................$ 59.98 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5
CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION
SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR
CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE
CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE
GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR
SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL
(NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR
JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR
MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE)
(CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR
TYPES); MECHANICAL BURM, CURB AND/OR CURB AND
GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT
HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR
(SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED
(AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR
WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER;
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5
FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 61.30 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4 ASPHALT
PLANT ENGINEER/BOX PERSON; CHICAGO BOOM;
COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING
3/4 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY);
DOZER AND/OR PUSH CAT; PULL- TYPE ELEVATING LOADER;
GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR
OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING
SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT,
HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY
REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER
UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER
(MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR
SPREADER MACHINE (ASPHALT, BARBER-GREENE AND
SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR
SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS;
POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT;
RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS,
ETC.); RUBBER- TIRED EARTHMOVING EQUIPMENT
(SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL
TRACTOR WITH DRAG; SOIL STABILIZER (P & H OR
EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE
RIG; UNLICENSED CONSTUCTION WORK BOAT OPERATOR, ON
SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.;
TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL
COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR
PUGMILL EQUIPMENT) FOOTNOTE: WORK SUSPENDED BY
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER
HOUR ADDITIONAL.....................................$ 62.57 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT
MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE
AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE
BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC;
CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE,
TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT,
TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL;
HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4
CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE
ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER
SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS
WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR
LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL
EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER
HOUR) FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES,
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 63.95 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2
HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU.
YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK
BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR
(FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND
INCLUDING 7 CU. YDS. M.R.C. FOOTNOTE: WORK
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO
CAT: $.60 PER HOUR ADDITIONAL.......................$ 65.43 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1
OPERATOR OF HELICOPTER (WHEN USED IN ERECTION
WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER;
POWER SHOVELS, OVER 7 CU. YDS. FOOTNOTE: WORK
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO
CAT: $.60 PER HOUR ADDITIONAL.......................$ 66.96 32.53
----------------------------------------------------------------
ENGI0003-008 08/01/2024
Rates Fringes
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (4) BARGEMAN; DECKHAND;
FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART........................................$ 53.23 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (3) BOOSTER PUMP
OPERATOR; DECK ENGINEER; DECK MATE; DREDGE
TENDER; WINCH OPERATOR AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART........................................$ 56.53 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (2) DREDGE DOZER; HEAVY
DUTY REPAIRMAN : AREA DESCRIPTIONS AREA 1:
ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY THE REMAINGING COUNTIES
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA
2: REMAINDER CALAVERAS COUNTY: AREA 1:
REMAINDER AREA 2: EASTERN PART COLUSA COUNTY:
AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO
COUNTY: AREA 1: NORTH CENTRAL PART AREA 2:
REMAINDER FRESNO COUNTY: AREA 1: REMAINDER
AREA 2: EASTERN PART GLENN COUNTY: AREA 1:
EASTERN PART AREA 2: REMAINDER LASSEN COUNTY:
AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA
2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MONTERREY
COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2:
SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL
BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA
COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1:
AL BUT THE CENTRAL PORTION AREA 2: REMAINDER
PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 57.65 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 2: (1) LEVERMAN AREA
DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA
COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC
COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN
AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY:
AREA 1: NORTHERNMOST PART AREA 2: REMAINDER
CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2:
EASTERN PART COLUSA COUNTY: AREA 1: EASTERN
PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1:
NORTH CENTRAL PART AREA 2: REMAINDER FRESNO
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
GLENN COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART
ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA
COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA
1: EXCEPT EASTERN PART AREA 2: EASTERN PART
MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART
AREA 2: EASTERN PART MONTERREY COUNTY AREA 1:
EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN
PART NEVADA COUNTY: AREA 1: ALL BUT THE
NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY
AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS
COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 62.61 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (4) BARGEMAN; DECKHAND;
FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART........................................$ 51.23 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (3) BOOSTER PUMP
OPERATOR; DECK ENGINEER; DECK MATE; DREDGE
TENDER; WINCH OPERATOR AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN,
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND
YUBA COUNTIES AREA 2: MODOC COUNTY THE
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND
AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1:
NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
COLUSA COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL
PART AREA 2: REMAINDER FRESNO COUNTY: AREA
1: REMAINDER AREA 2: EASTERN PART GLENN
COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER
LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA
2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MARIPOSA
COUNTY AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT
SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART
NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN
PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2:
REMAINDER PLACER COUNTY: AREA 1: AL BUT THE
CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY:
AREA 1: WESTERN PORTION AREA 2: REMAINDER
SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN
CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1:
WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY:
AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA
COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER
AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY
COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA
1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER
WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE
COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2:
EASTERN PART........................................$ 54.53 39.55
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (1) LEVERMAN AREA
DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA
COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC
COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN
AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY:
AREA 1: NORTHERNMOST PART AREA 2: REMAINDER
CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2:
EASTERN PART COLUSA COUNTY: AREA 1: EASTERN
PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1:
NORTH CENTRAL PART AREA 2: REMAINDER FRESNO
COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART
GLENN COUNTY: AREA 1: EASTERN PART AREA 2:
REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART
ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA
COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA
1: EXCEPT EASTERN PART AREA 2: EASTERN PART
MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART
AREA 2: EASTERN PART MONTERREY COUNTY AREA 1:
EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN
PART NEVADA COUNTY: AREA 1: ALL BUT THE
NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY
AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT
THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS
COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 60.61 39.55
DREDGING ( CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING) AREA 1: (2) DREDGE DOZER; HEAVY
DUTY REPAIRMAN AREA DESCRIPTIONS AREA 1:
ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY THE REMAINGING COUNTIES
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA
2: REMAINDER CALAVERAS COUNTY: AREA 1:
REMAINDER AREA 2: EASTERN PART COLUSA COUNTY:
AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO
COUNTY: AREA 1: NORTH CENTRAL PART AREA 2:
REMAINDER FRESNO COUNTY: AREA 1: REMAINDER
AREA 2: EASTERN PART GLENN COUNTY: AREA 1:
EASTERN PART AREA 2: REMAINDER LASSEN COUNTY:
AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF
BORDER WITH SHASTA COUNTY AREA 2: REMAINDER
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA
2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART MONTERREY
COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2:
SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL
BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA
COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1:
AL BUT THE CENTRAL PORTION AREA 2: REMAINDER
PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2:
REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE
NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA
COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER
SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2:
REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE
NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA
COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH
MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER
TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE
NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2:
REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT
EASTERN PART AREA 2: EASTERN PART.................$ 55.65 39.55
----------------------------------------------------------------
ENGI0003-019 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3 (AREA 2)....................................$ 49.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3 (AREA 1)....................................$ 47.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2 (AREA 2)....................................$ 54.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2 (AREA 1)....................................$ 52.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1 (AREA 2)....................................$ 57.85 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1 (AREA 1)....................................$ 55.85 28.56
------------------------------------Source: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.