Home / Prevailing wage rates / California / CA20260021

Tulare County, California Davis-Bacon Wage Rates: Heavy and Highway

Updated

Federal prevailing wage rates (Davis-Bacon) for heavy and highway construction in Tulare County, California: 79 classifications, base rates from $28.94 to $65.56 an hour plus fringe benefits. General decision CA20260021, modification 2, published May 18, 2026.

TypeDavis-Bacon (construction)
NumberCA20260021
Modification2
PublishedMay 18, 2026
StateCalifornia
AreaCalifornia Counties of Tulare
Construction typeHeavy and Highway
Get new federal construction bids in California by email
Only new notices that match, once a day. Federal bids in California that match your words.

Wage rates and fringe benefits (79)

ClassificationBase rateFringeTotalCalifornia median
Boilermaker$45.60$38.99$84.59
Marble Finisher$42.06$19.80$61.86
Tile Layer$50.28$22.05$72.33$56.79 (-$6.51)
Tile Finisher$32.68$18.32$51.00$35.78 (-$3.10)
Terrazzo Worker/Setter$60.58$29.79$90.37
Terrazzo Finisher$44.93$20.98$65.91
Piledriver$54.10$34.69$88.79
Carpenters: Millwright$47.92$32.41$80.33
Carpenters: Journeyman Carpenter$45.42$30.82$76.24
Carpenters: Bridge Builder/Highway Carpenter$52.65$30.82$83.47
Carpenters (Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer)$45.57$30.82$76.39
Electrician$50.00$30.15$80.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Truck crane oiler)$45.12$31.15$76.27$45.12
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Oiler)$42.89$31.15$74.04$45.12 (-$2.23)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Lifting devices)$49.14$31.15$80.29$45.12 (+$4.02)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Truck crane oiler)$45.41$31.15$76.56$45.41
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Oiler)$43.11$31.15$74.26$45.41 (-$2.30)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Lifting devices)$50.82$31.15$81.97$45.41 (+$5.41)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Truck crane oiler)$45.66$31.15$76.81$45.66
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Oiler)$43.38$31.15$74.53$45.66 (-$2.28)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Lifting devices)$52.64$31.15$83.79$45.66 (+$6.98)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 5)$58.09$32.53$90.62$61.03 (-$2.94)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 4)$59.23$32.53$91.76$61.03 (-$1.80)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 3)$60.37$32.53$92.90$61.03 (-$0.66)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 2)$61.70$32.53$94.23$61.03 (+$0.67)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1-a)$65.43$32.53$97.96$61.03 (+$4.40)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1)$62.96$32.53$95.49$61.03 (+$1.93)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 5)$58.19$32.53$90.72$61.13 (-$2.95)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 4)$59.33$32.53$91.86$61.13 (-$1.80)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 3)$60.47$32.53$93.00$61.13 (-$0.66)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 2)$61.80$32.53$94.33$61.13 (+$0.66)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1-a)$65.53$32.53$98.06$61.13 (+$4.40)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1)$63.06$32.53$95.59$61.13 (+$1.93)
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Hydraulic)$60.61$32.53$93.14$63.09 (-$2.48)
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Cranes)$65.56$32.53$98.09$63.09 (+$2.48)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Truck crane oiler)$45.12$31.15$76.27$45.12
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Oiler)$42.89$31.15$74.04$45.12 (-$2.23)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 3 (Lifting devices)$49.14$31.15$80.29$45.12 (+$4.02)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Truck crane oiler)$45.41$31.15$76.56$45.41
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Oiler)$43.11$31.15$74.26$45.41 (-$2.30)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 2 (Lifting devices)$50.82$31.15$81.97$45.41 (+$5.41)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Truck crane oiler)$45.66$31.15$76.81$45.66
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Oiler)$43.38$31.15$74.53$45.66 (-$2.28)
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: : GROUP 1 (Lifting devices)$52.64$31.15$83.79$45.66 (+$6.98)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 5)$58.09$32.53$90.62$61.03 (-$2.94)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 4)$59.23$32.53$91.76$61.03 (-$1.80)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 3)$60.37$32.53$92.90$61.03 (-$0.66)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 2)$61.70$32.53$94.23$61.03 (+$0.67)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1-a)$65.43$32.53$97.96$61.03 (+$4.40)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Underground: (Group 1)$62.96$32.53$95.49$61.03 (+$1.93)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 5)$58.19$32.53$90.72$61.13 (-$2.95)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 4)$59.33$32.53$91.86$61.13 (-$1.80)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 3)$60.47$32.53$93.00$61.13 (-$0.66)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 2)$61.80$32.53$94.33$61.13 (+$0.66)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1-a)$65.53$32.53$98.06$61.13 (+$4.40)
Operator: Power Equipment, Tunnel and Underground Work - Area 1: : Shafts, Stopes, Raises: (Group 1)$63.06$32.53$95.59$61.13 (+$1.93)
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Hydraulic)$60.61$32.53$93.14$63.09 (-$2.48)
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: : GROUP 3 (Cranes)$65.56$32.53$98.09$63.09 (+$2.48)
Operator: Power Equipment, Landscape Work Only: Group 3 (Area 2)$49.64$28.56$78.20
Operator: Power Equipment, Landscape Work Only: Group 3 (Area 1)$47.64$28.56$76.20
Operator: Power Equipment, Landscape Work Only: Group 2 (Area 2)$54.25$28.56$82.81
Operator: Power Equipment, Landscape Work Only: Group 2 (Area 1)$52.25$28.56$80.81
Operator: Power Equipment, Landscape Work Only: Group 1 (Area 2)$57.85$28.56$86.41
Operator: Power Equipment, Landscape Work Only: Group 1 (Area 1)$55.85$28.56$84.41
Ironworker (Ornamental, Reinforcing and Structural)$50.70$35.15$85.85
Ironworker (Fence Erector)$45.78$26.51$72.29
Laborer: Traffic Control/Lane Closure: Escort Driver, Flag Person$36.26$27.30$63.56
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction)$35.25$27.30$62.55$32.09 (+$3.16)
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment Warranty Period)$28.94$27.30$56.24$32.09 (-$3.15)
Tunnel and Shaft Laborers: Shotcrete Specialist (Tulare County)$46.41$27.72$74.13
Tunnel and Shaft Laborers: Group 5 Grout Crew; Reboundman; Swamper/ Brakeman (Tulare County)$44.42$27.72$72.14
Tunnel and Shaft Laborers: Group 2 Rodmen; Shaft Work & Raise (Below Actual or Excavated Ground Level) (Tulare County)$45.66$27.72$73.38
Tunnel and Shaft Laborers: Group 1 Diamond Driller; Groundmen; Gunite and Shotcrete Nozzlemen (Tulare County)$45.89$27.72$73.61
Plasterer Tender Work on a Swing Stage Scaffold: $1.00 per Hour Additional$39.77$28.54$68.31
Parking Lot Striping/Highway Marking: Highway Improvement: Group 3 Protective Coating, Pavement Sealing$35.11$17.62$52.73
Parking Lot Striping/Highway Marking: Highway Improvememt: Group 2 Gamecourt & Playground Installer$34.71$17.62$52.33
Cement Mason/Concrete Finisher$32.15$23.27$55.42
Plumber & Steamfitter$51.65$41.59$93.24
Underground Utility Worker / Landscape Fitter$36.01$18.50$54.51

The median is the middle rate for the same work across California's heavy and highway wage determinations in force today, shown when at least three have it.

How to use these rates

On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.

Other Davis-Bacon heavy and highway wage determinations in California

All California prevailing wage rates · Open federal bids in California

Full text of CA20260021

Show the official text (91,382 characters)
General Decision Number: CA20260021 05/18/2026


State: California


Construction Types: Heavy and Highway


Counties: California Counties of 
Tulare




Includes Dredging Projects (does not include self-propelled hopper dredge work); Excludes water well drilling


Modification Number     Publication Date
          1                01/09/2026
          2                05/18/2026


 ASBE0016-006 05/01/2025
                                                     Rates                  Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER 
(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, 
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL 
INSULATION MATERIALS FROM MECHANICAL SYSTEMS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT)...............$ 35.31                  12.75
----------------------------------------------------------------

 ASBE0016-010 01/01/2024
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES THE 
APPLICATION OF ALL  INSULATING MATERIALS, 
PROTECTIVE  COVERINGS, COATINGS, AND FINISHES TO 
ALL TYPES OF MECHANICAL SYSTEMS)....................$ 64.56                  25.07
----------------------------------------------------------------

 BOIL0549-004 01/01/2021
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 45.60                  38.99
----------------------------------------------------------------

 BRCA0003-001 08/01/2024
                                                     Rates                  Fringes
MARBLE FINISHER.....................................$ 42.06                  19.80
----------------------------------------------------------------

 BRCA0003-016 04/01/2024
                                                     Rates                  Fringes
TILE LAYER..........................................$ 50.28                  22.05
TILE FINISHER.......................................$ 32.68                  18.32
----------------------------------------------------------------

 BRCA0003-017 07/01/2024
                                                     Rates                  Fringes
TERRAZZO WORKER/SETTER..............................$ 60.58                  29.79
TERRAZZO FINISHER...................................$ 44.93                  20.98
----------------------------------------------------------------

 BRCA0004-005 05/01/2024
                                                     Rates                  Fringes
BRICKLAYER; MARBLE SETTER  *THE WAGE SCALE FOR 
PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA 
LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, 
NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA 
STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE THE 
STANDARD SAN BERNARDINO/RIVERSIDE COUNTY HOURLY 
WAGE RATE...........................................$ 45.53                  20.29
----------------------------------------------------------------

 CARP0034-002 07/01/2021
                                                     Rates                  Fringes
DIVER: MANIFOLD OPERATOR (STANDBY)    DEPTH PAY 
(SURFACE DIVING):    050 TO 100 FT    $2.00 PER 
FOOT     101 TO 150 FT    $3.00 PER FOOT     151 TO 
220 FT    $4.00 PER FOOT  221 FT.-DEEPER   $5.00 
PER FOOT  SATURATION DIVING:  THE STANDBY RATE 
SHALL APPLY UNTIL SATURATION STARTS.  THE 
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE 
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND 
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE 
PAID FOR ALL SATURATION HOURS.    DIVING IN 
ENCLOSURES:  WHERE IT IS NECESSARY FOR DIVERS TO 
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE 
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM 
SHALL BE PAID:  DISTANCE TRAVELED FROM ENTRANCE 26 
FEET TO 300 FEET:  $1.00 PER FOOT.  WHEN IT IS 
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR 
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE 
PREMIUM WILL BE $1.00 PER FOOT.    WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT......................................$ 59.51                  34.69
DIVER: MANIFOLD OPERATOR (MIXED GAS)    DEPTH PAY 
(SURFACE DIVING):    050 TO 100 FT    $2.00 PER 
FOOT     101 TO 150 FT    $3.00 PER FOOT     151 TO 
220 FT    $4.00 PER FOOT  221 FT.-DEEPER   $5.00 
PER FOOT  SATURATION DIVING:  THE STANDBY RATE 
SHALL APPLY UNTIL SATURATION STARTS.  THE 
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE 
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND 
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE 
PAID FOR ALL SATURATION HOURS.    DIVING IN 
ENCLOSURES:  WHERE IT IS NECESSARY FOR DIVERS TO 
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE 
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM 
SHALL BE PAID:  DISTANCE TRAVELED FROM ENTRANCE 26 
FEET TO 300 FEET:  $1.00 PER FOOT.  WHEN IT IS 
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR 
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE 
PREMIUM WILL BE $1.00 PER FOOT.    WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT......................................$ 64.51                  34.69
DIVER: DIVER WET    DEPTH PAY (SURFACE DIVING):    
050 TO 100 FT    $2.00 PER FOOT     101 TO 150 FT   
 $3.00 PER FOOT     151 TO 220 FT    $4.00 PER FOOT 
 221 FT.-DEEPER   $5.00 PER FOOT  SATURATION 
DIVING:  THE STANDBY RATE SHALL APPLY UNTIL 
SATURATION STARTS.  THE SATURATION DIVING RATE 
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY 
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE 
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.  
  DIVING IN ENCLOSURES:  WHERE IT IS NECESSARY FOR 
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER 
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE 
FOLLOWING PREMIUM SHALL BE PAID:  DISTANCE TRAVELED 
FROM ENTRANCE 26 FEET TO 300 FEET:  $1.00 PER FOOT. 
 WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY 
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN 
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.    WORK 
IN COMBINATION OF CLASSIFICATIONS:  EMPLOYEES 
WORKING IN ANY COMBINATION OF CLASSIFICATIONS 
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN 
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE 
HIGHEST RATE FOR THAT SHIFT.........................$ 103.62                  34.69
DIVER: DIVER TENDER    DEPTH PAY (SURFACE DIVING):  
  050 TO 100 FT    $2.00 PER FOOT     101 TO 150 FT 
   $3.00 PER FOOT     151 TO 220 FT    $4.00 PER 
FOOT  221 FT.-DEEPER   $5.00 PER FOOT  SATURATION 
DIVING:  THE STANDBY RATE SHALL APPLY UNTIL 
SATURATION STARTS.  THE SATURATION DIVING RATE 
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY 
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE 
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.  
  DIVING IN ENCLOSURES:  WHERE IT IS NECESSARY FOR 
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER 
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE 
FOLLOWING PREMIUM SHALL BE PAID:  DISTANCE TRAVELED 
FROM ENTRANCE 26 FEET TO 300 FEET:  $1.00 PER FOOT. 
 WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY 
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN 
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.    WORK 
IN COMBINATION OF CLASSIFICATIONS:  EMPLOYEES 
WORKING IN ANY COMBINATION OF CLASSIFICATIONS 
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN 
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE 
HIGHEST RATE FOR THAT SHIFT.........................$ 59.51                  34.69
DIVER: DIVER STANDBY    DEPTH PAY (SURFACE DIVING): 
   050 TO 100 FT    $2.00 PER FOOT     101 TO 150 
FT    $3.00 PER FOOT     151 TO 220 FT    $4.00 PER 
FOOT  221 FT.-DEEPER   $5.00 PER FOOT  SATURATION 
DIVING:  THE STANDBY RATE SHALL APPLY UNTIL 
SATURATION STARTS.  THE SATURATION DIVING RATE 
APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY 
UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE 
DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.  
  DIVING IN ENCLOSURES:  WHERE IT IS NECESSARY FOR 
DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER 
ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE 
FOLLOWING PREMIUM SHALL BE PAID:  DISTANCE TRAVELED 
FROM ENTRANCE 26 FEET TO 300 FEET:  $1.00 PER FOOT. 
 WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY 
PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN 
HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.    WORK 
IN COMBINATION OF CLASSIFICATIONS:  EMPLOYEES 
WORKING IN ANY COMBINATION OF CLASSIFICATIONS 
WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN 
A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE 
HIGHEST RATE FOR THAT SHIFT.........................$ 60.51                  34.69
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN    
DEPTH PAY (SURFACE DIVING):    050 TO 100 FT    
$2.00 PER FOOT     101 TO 150 FT    $3.00 PER FOOT  
   151 TO 220 FT    $4.00 PER FOOT  221 FT.-DEEPER  
 $5.00 PER FOOT  SATURATION DIVING:  THE STANDBY 
RATE SHALL APPLY UNTIL SATURATION STARTS.  THE 
SATURATION DIVING RATE APPLIES WHEN DIVERS ARE 
UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND 
DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE 
PAID FOR ALL SATURATION HOURS.    DIVING IN 
ENCLOSURES:  WHERE IT IS NECESSARY FOR DIVERS TO 
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE 
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM 
SHALL BE PAID:  DISTANCE TRAVELED FROM ENTRANCE 26 
FEET TO 300 FEET:  $1.00 PER FOOT.  WHEN IT IS 
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR 
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE 
PREMIUM WILL BE $1.00 PER FOOT.    WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT......................................$ 54.10                  34.69
----------------------------------------------------------------

 CARP0034-003 07/01/2021
                                                     Rates                  Fringes
PILEDRIVER..........................................$ 54.10                  34.69
----------------------------------------------------------------

 CARP1109-002 07/01/2020
                                                     Rates                  Fringes
CARPENTERS: MILLWRIGHT..............................$ 47.92                  32.41
CARPENTERS: JOURNEYMAN CARPENTER....................$ 45.42                  30.82
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER........$ 52.65                  30.82
CARPENTERS (HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER).................................$ 45.57                  30.82
----------------------------------------------------------------

 ELEC0100-001 09/01/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 50.00                  30.15
----------------------------------------------------------------

 ELEC1245-001 01/01/2025
                                                     Rates                  Fringes
LINE CONSTRUCTION: (3) GROUNDMAN    HOLIDAYS: NEW 
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, 
THANKSGIVING DAY AND DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 40.76                  21.76
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST   
(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR 
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND 
BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE 
EQUIPMENT)    HOLIDAYS: NEW YEAR'S DAY, M.L. KING 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERANS DAY, THANKSGIVING DAY AND DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 53.30                  22.26
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER    
HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, 
THANKSGIVING DAY AND DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 70.16                  24.71
----------------------------------------------------------------

 ENGI0003-006 06/29/2020
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 3 (Truck crane oiler).........................$ 45.12                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 3 (Oiler).....................................$ 42.89                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 3 (Lifting devices)...........................$ 49.14                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 2 (Truck crane oiler).........................$ 45.41                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 2 (Oiler).....................................$ 43.11                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 2 (Lifting devices)...........................$ 50.82                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 1 (Truck crane oiler).........................$ 45.66                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 1 (Oiler).....................................$ 43.38                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 1 (Lifting devices)...........................$ 52.64                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1: 
LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER     
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 42.50                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1: 
LIFTING DEVICES: GROUP 5: DECK ENGINEER    
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.    ..$ 44.73                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1: 
LIFTING DEVICES: GROUP 4: ASSISTANT OPERATOR IN 
LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS 
AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER  FOOTNOTE: 
WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A 
YO-YO CAT: $.60 PER HOUR ADDITIONAL.      ..........$ 47.47                  31.15
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 5)..............$ 58.09                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 4)..............$ 59.23                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 3)..............$ 60.37                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 2)..............$ 61.70                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)............$ 65.43                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 1)..............$ 62.96                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)...$ 58.19                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)...$ 59.33                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)...$ 60.47                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)...$ 61.80                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)...$ 63.06                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1:CRANE: GROUP 5: BOOM CAT   FOOTNOTE: WORK 
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO 
CAT: $.60 PER HOUR ADDITIONAL.......................$ 62.24                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1:: GROUP 3 (Hydraulic).............................$ 60.61                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1:: GROUP 3 (Cranes)................................$ 65.56                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS; 
DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER 
CRANE    FOOTNOTE: WORK SUSPENDED BY ROPES OR 
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 67.04                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1: CRANES: GROUP 1: CRANE OVER 100 TONS; DERRICK 
OVER 100 TONS; SELF- PROPELLED BOOM-TYPE LIFTING 
DEVICE OVER 100 TONS    FOOTNOTE: WORK SUSPENDED BY 
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER 
HOUR ADDITIONAL.....................................$ 68.81                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS 
AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER    GROUP 
5: BOOM CAT   FOOTNOTE: WORK SUSPENDED BY ROPES OR 
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 63.54                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1:CRANES   GROUP 2: CLAMSHELL AND DRAGLINE 
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; 
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; 
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE 
  FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 66.08                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: CRANES  GROUP 3: CLAMSHELL AND DRAGLINE 
UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND 
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 
TONS AND UNDER;   FOOTNOTE: WORK SUSPENDED BY ROPES 
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 64.34                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: CRANES   GROUP 4: BOOM TRUCK OR DUAL 
PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; 
TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING 
DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 
TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE 
LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) - 
UNDER 15 TONS;          FOOTNOTE: WORK SUSPENDED BY 
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER 
HOUR ADDITIONAL.....................................$ 61.30                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: CRANES    GROUP 1: CLAMSHELL AND DRAGLINE 
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, 
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 
OVER 100 TONS    FOOTNOTE: WORK SUSPENDED BY ROPES 
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 68.59                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8-A 
ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 
SERIES OR SMALLER, AND SIMILAR (WITHOUT 
ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. 
(BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER        
      FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, 
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 55.49                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8 BIT 
SHARPENER; BOILER TENDER; BOX OPERATOR; 
BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR 
(SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; 
FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR; 
GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC 
MONITOR; KEN SEAL MACHINE (OR SIMILAR); 
MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION 
PLANT; RESERVOIR-DEBRIS TUG (SELF- PROPELLED 
FLOATING); ROSS CARRIER (CONSTRUCTION SITE); 
ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; 
SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR 
(INCLUDES VACUUM SWEEPER);  SLUSHER OPERATOR; 
SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; 
TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; 
WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY) 
 FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 57.70                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST 
REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME 
TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR 
SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER; 
DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.; 
FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; 
HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT 
LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE 
(VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL 
FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); 
MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR 
WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING 
MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST 
DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; 
SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE 
CURING MAHCINE (ON STREETS, HIGHWAYS, AIRPORTS AND 
CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); 
SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR 
CONCRETE FORMS); TIE SPACER; TOWER MOBILE; 
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO 
AND INCLUDING 5 FT. DEPTH; TRUCK- TYPE LOADER  
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 58.84                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 6 
ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; 
BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT 
ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL 
GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING 
MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT 
ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK 
ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200 
SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. 
M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; 
HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER 
LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR 
(WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR 
SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT 
BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR 
COMBINATION; PAVING FABRIC INSTALLATION AND/OR 
LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES 
ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND 
SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE 
PAVING); SELF- PROPELLED PIPELINE WRAPPING MACHINE; 
TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER 
MOVING MACHINE  FOOTNOTE: WORK SUSPENDED BY ROPES 
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 59.98                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 5 
CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION 
SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR 
CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE 
CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE 
GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR 
SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL 
(NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR 
JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR 
MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE) 
(CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR 
TYPES); MECHANICAL BURM, CURB AND/OR CURB AND 
GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT 
HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR 
(SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED 
(AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR 
WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; 
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 
FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR  
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 61.30                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 4 ASPHALT 
PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; 
COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 
3/4 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY); 
DOZER AND/OR PUSH CAT; PULL- TYPE ELEVATING LOADER; 
GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR 
OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING 
SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, 
HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY 
REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER 
UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER 
(MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR 
SPREADER MACHINE (ASPHALT, BARBER-GREENE AND 
SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR 
SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; 
POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; 
RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS, 
ETC.); RUBBER- TIRED EARTHMOVING EQUIPMENT 
(SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL 
TRACTOR WITH DRAG; SOIL STABILIZER (P & H OR 
EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE 
RIG; UNLICENSED CONSTUCTION WORK BOAT OPERATOR, ON 
SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; 
TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL 
COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR 
PUGMILL EQUIPMENT)  FOOTNOTE: WORK SUSPENDED BY 
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER 
HOUR ADDITIONAL.....................................$ 62.57                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT 
MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE 
AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE 
BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC; 
CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, 
TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, 
TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; 
HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4 
CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE 
ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER 
SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS 
WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR 
LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL 
EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER 
HOUR)  FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, 
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 63.95                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 2 
HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU. 
YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK 
BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR 
(FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND 
INCLUDING 7 CU. YDS. M.R.C.  FOOTNOTE: WORK 
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO 
CAT: $.60 PER HOUR ADDITIONAL.......................$ 65.43                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 1 
OPERATOR OF HELICOPTER (WHEN USED IN ERECTION 
WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; 
POWER SHOVELS, OVER 7 CU. YDS.  FOOTNOTE: WORK 
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO 
CAT: $.60 PER HOUR ADDITIONAL.......................$ 66.96                  32.53
----------------------------------------------------------------

 ENGI0003-006 06/30/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 3 (Truck crane oiler).........................$ 45.12                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 3 (Oiler).....................................$ 42.89                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 3 (Lifting devices)...........................$ 49.14                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 2 (Truck crane oiler).........................$ 45.41                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 2 (Oiler).....................................$ 43.11                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 2 (Lifting devices)...........................$ 50.82                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 1 (Truck crane oiler).........................$ 45.66                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 1 (Oiler).....................................$ 43.38                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1:: 
GROUP 1 (Lifting devices)...........................$ 52.64                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1: 
LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER     
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 42.50                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1: 
LIFTING DEVICES: GROUP 5: DECK ENGINEER    
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.    ..$ 44.73                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING - AREA 1: 
LIFTING DEVICES: GROUP 4: ASSISTANT OPERATOR IN 
LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS 
AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER  FOOTNOTE: 
WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A 
YO-YO CAT: $.60 PER HOUR ADDITIONAL.      ..........$ 47.47                  31.15
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 5)..............$ 58.09                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 4)..............$ 59.23                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 3)..............$ 60.37                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 2)..............$ 61.70                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)............$ 65.43                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: UNDERGROUND: (GROUP 1)..............$ 62.96                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)...$ 58.19                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)...$ 59.33                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)...$ 60.47                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)...$ 61.80                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)...$ 63.06                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1:CRANE: GROUP 5: BOOM CAT   FOOTNOTE: WORK 
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO 
CAT: $.60 PER HOUR ADDITIONAL.......................$ 62.24                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1:: GROUP 3 (Hydraulic).............................$ 60.61                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1:: GROUP 3 (Cranes)................................$ 65.56                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS; 
DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER 
CRANE    FOOTNOTE: WORK SUSPENDED BY ROPES OR 
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 67.04                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1: CRANES: GROUP 1: CRANE OVER 100 TONS; DERRICK 
OVER 100 TONS; SELF- PROPELLED BOOM-TYPE LIFTING 
DEVICE OVER 100 TONS    FOOTNOTE: WORK SUSPENDED BY 
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER 
HOUR ADDITIONAL.....................................$ 68.81                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION - AREA 
1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS 
AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER    GROUP 
5: BOOM CAT   FOOTNOTE: WORK SUSPENDED BY ROPES OR 
CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 63.54                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1:CRANES   GROUP 2: CLAMSHELL AND DRAGLINE 
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; 
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; 
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE 
  FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 66.08                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: CRANES  GROUP 3: CLAMSHELL AND DRAGLINE 
UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND 
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 
TONS AND UNDER;   FOOTNOTE: WORK SUSPENDED BY ROPES 
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 64.34                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: CRANES   GROUP 4: BOOM TRUCK OR DUAL 
PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; 
TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING 
DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 
TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE 
LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) - 
UNDER 15 TONS;          FOOTNOTE: WORK SUSPENDED BY 
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER 
HOUR ADDITIONAL.....................................$ 61.30                  32.53
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: CRANES    GROUP 1: CLAMSHELL AND DRAGLINE 
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, 
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 
OVER 100 TONS    FOOTNOTE: WORK SUSPENDED BY ROPES 
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 68.59                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8-A 
ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 
SERIES OR SMALLER, AND SIMILAR (WITHOUT 
ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. 
(BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER        
      FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, 
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 55.49                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8 BIT 
SHARPENER; BOILER TENDER; BOX OPERATOR; 
BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR 
(SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; 
FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR; 
GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC 
MONITOR; KEN SEAL MACHINE (OR SIMILAR); 
MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION 
PLANT; RESERVOIR-DEBRIS TUG (SELF- PROPELLED 
FLOATING); ROSS CARRIER (CONSTRUCTION SITE); 
ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; 
SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR 
(INCLUDES VACUUM SWEEPER);  SLUSHER OPERATOR; 
SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; 
TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; 
WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY) 
 FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 57.70                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST 
REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME 
TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR 
SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER; 
DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.; 
FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; 
HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT 
LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE 
(VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL 
FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); 
MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR 
WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING 
MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST 
DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; 
SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE 
CURING MAHCINE (ON STREETS, HIGHWAYS, AIRPORTS AND 
CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); 
SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR 
CONCRETE FORMS); TIE SPACER; TOWER MOBILE; 
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO 
AND INCLUDING 5 FT. DEPTH; TRUCK- TYPE LOADER  
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 58.84                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 6 
ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; 
BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT 
ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL 
GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING 
MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT 
ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK 
ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200 
SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. 
M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; 
HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER 
LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR 
(WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR 
SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT 
BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR 
COMBINATION; PAVING FABRIC INSTALLATION AND/OR 
LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES 
ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND 
SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE 
PAVING); SELF- PROPELLED PIPELINE WRAPPING MACHINE; 
TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER 
MOVING MACHINE  FOOTNOTE: WORK SUSPENDED BY ROPES 
OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR 
ADDITIONAL..........................................$ 59.98                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 5 
CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION 
SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR 
CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE 
CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE 
GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR 
SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL 
(NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR 
JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR 
MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE) 
(CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR 
TYPES); MECHANICAL BURM, CURB AND/OR CURB AND 
GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT 
HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR 
(SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED 
(AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR 
WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; 
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 
FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR  
FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR 
WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL.......$ 61.30                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 4 ASPHALT 
PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; 
COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 
3/4 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY); 
DOZER AND/OR PUSH CAT; PULL- TYPE ELEVATING LOADER; 
GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR 
OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING 
SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, 
HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY 
REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER 
UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER 
(MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR 
SPREADER MACHINE (ASPHALT, BARBER-GREENE AND 
SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR 
SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; 
POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; 
RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS, 
ETC.); RUBBER- TIRED EARTHMOVING EQUIPMENT 
(SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL 
TRACTOR WITH DRAG; SOIL STABILIZER (P & H OR 
EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE 
RIG; UNLICENSED CONSTUCTION WORK BOAT OPERATOR, ON 
SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; 
TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL 
COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR 
PUGMILL EQUIPMENT)  FOOTNOTE: WORK SUSPENDED BY 
ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER 
HOUR ADDITIONAL.....................................$ 62.57                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT 
MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE 
AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE 
BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC; 
CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, 
TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, 
TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; 
HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4 
CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE 
ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER 
SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS 
WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR 
LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL 
EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER 
HOUR)  FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, 
OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL....$ 63.95                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 2 
HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU. 
YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK 
BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR 
(FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND 
INCLUDING 7 CU. YDS. M.R.C.  FOOTNOTE: WORK 
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO 
CAT: $.60 PER HOUR ADDITIONAL.......................$ 65.43                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 1 
OPERATOR OF HELICOPTER (WHEN USED IN ERECTION 
WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; 
POWER SHOVELS, OVER 7 CU. YDS.  FOOTNOTE: WORK 
SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO 
CAT: $.60 PER HOUR ADDITIONAL.......................$ 66.96                  32.53
----------------------------------------------------------------

 ENGI0003-008 08/01/2024
                                                     Rates                  Fringes
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 2:   (4) BARGEMAN; DECKHAND; 
FIREMAN; LEVEEHAND; OILER     AREA DESCRIPTIONS    
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, 
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND 
YUBA COUNTIES    AREA 2:  MODOC COUNTY  THE 
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED BELOW:    ALPINE COUNTY:  AREA 1:  
NORTHERNMOST PART  AREA 2:  REMAINDER  CALAVERAS 
COUNTY:   AREA 1: REMAINDER   AREA 2: EASTERN PART  
  COLUSA COUNTY:  AREA 1:  EASTERN PART  AREA 2:  
REMAINDER  ELDORADO COUNTY:  AREA 1:  NORTH CENTRAL 
PART  AREA 2:  REMAINDER     FRESNO COUNTY:   AREA 
1: REMAINDER   AREA 2: EASTERN PART    GLENN 
COUNTY:  AREA 1:  EASTERN PART  AREA 2: REMAINDER   
 LASSEN COUNTY:  AREA 1:  WESTERN PART ALONG THE 
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY  AREA 
2:  REMAINDER  MADERA COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART    MARIPOSA 
COUNTY   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART    MONTERREY COUNTY   AREA 1: EXCEPT 
SOUTHWESTERN PART   AREA 2: SOUTHWESTERN PART    
NEVADA COUNTY:  AREA 1:  ALL BUT THE NORTHERN 
PORTION ALONG THE BORDER OF SIERRA COUNTY  AREA 2:  
REMAINDER  PLACER COUNTY:  AREA 1:  AL BUT THE 
CENTRAL PORTION  AREA 2:  REMAINDER  PLUMAS COUNTY: 
 AREA 1:  WESTERN PORTION  AREA 2:  REMAINDER  
SHASTA COUNTY:  AREA 1:  ALL BUT THE NORTHEASTERN 
CORNER  AREA 2:  REMAINDER  SIERRA COUNTY:  AREA 1: 
 WESTERN PART  AREA 2:  REMAINDER  SISKIYOU COUNTY: 
 AREA 1:  CENTRAL PART  AREA 2:  REMAINDER  SONOMA 
COUNTY:  AREA 1:  ALL BUT THE NORTHWESTERN CORNER  
AREA 2:  REMAINDER  TEHAMA COUNTY:  AREA 1:  ALL 
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY 
COUNTIES  AREA 2:  REMAINDER  TRINITY COUNTY:  AREA 
1:  EAST CENTRAL PART AND THE NORTHEASTERN BORDER 
WITH SHASTA COUNTY  AREA 2:  REMAINDER  TUOLUMNE 
COUNTY:   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART........................................$ 53.23                  39.55
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 2:   (3) BOOSTER PUMP 
OPERATOR; DECK   ENGINEER; DECK MATE; DREDGE 
TENDER; WINCH OPERATOR     AREA DESCRIPTIONS    
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, 
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND 
YUBA COUNTIES    AREA 2:  MODOC COUNTY  THE 
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED BELOW:    ALPINE COUNTY:  AREA 1:  
NORTHERNMOST PART  AREA 2:  REMAINDER  CALAVERAS 
COUNTY:   AREA 1: REMAINDER   AREA 2: EASTERN PART  
  COLUSA COUNTY:  AREA 1:  EASTERN PART  AREA 2:  
REMAINDER  ELDORADO COUNTY:  AREA 1:  NORTH CENTRAL 
PART  AREA 2:  REMAINDER     FRESNO COUNTY:   AREA 
1: REMAINDER   AREA 2: EASTERN PART    GLENN 
COUNTY:  AREA 1:  EASTERN PART  AREA 2: REMAINDER   
 LASSEN COUNTY:  AREA 1:  WESTERN PART ALONG THE 
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY  AREA 
2:  REMAINDER  MADERA COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART    MARIPOSA 
COUNTY   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART    MONTERREY COUNTY   AREA 1: EXCEPT 
SOUTHWESTERN PART   AREA 2: SOUTHWESTERN PART    
NEVADA COUNTY:  AREA 1:  ALL BUT THE NORTHERN 
PORTION ALONG THE BORDER OF SIERRA COUNTY  AREA 2:  
REMAINDER  PLACER COUNTY:  AREA 1:  AL BUT THE 
CENTRAL PORTION  AREA 2:  REMAINDER  PLUMAS COUNTY: 
 AREA 1:  WESTERN PORTION  AREA 2:  REMAINDER  
SHASTA COUNTY:  AREA 1:  ALL BUT THE NORTHEASTERN 
CORNER  AREA 2:  REMAINDER  SIERRA COUNTY:  AREA 1: 
 WESTERN PART  AREA 2:  REMAINDER  SISKIYOU COUNTY: 
 AREA 1:  CENTRAL PART  AREA 2:  REMAINDER  SONOMA 
COUNTY:  AREA 1:  ALL BUT THE NORTHWESTERN CORNER  
AREA 2:  REMAINDER  TEHAMA COUNTY:  AREA 1:  ALL 
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY 
COUNTIES  AREA 2:  REMAINDER  TRINITY COUNTY:  AREA 
1:  EAST CENTRAL PART AND THE NORTHEASTERN BORDER 
WITH SHASTA COUNTY  AREA 2:  REMAINDER  TUOLUMNE 
COUNTY:   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART........................................$ 56.53                  39.55
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 2:   (2) DREDGE DOZER; HEAVY 
DUTY REPAIRMAN :    AREA DESCRIPTIONS    AREA 1: 
ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, 
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES 
   AREA 2:  MODOC COUNTY  THE REMAINGING COUNTIES 
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: 
   ALPINE COUNTY:  AREA 1:  NORTHERNMOST PART  AREA 
2:  REMAINDER  CALAVERAS COUNTY:   AREA 1: 
REMAINDER   AREA 2: EASTERN PART    COLUSA COUNTY:  
AREA 1:  EASTERN PART  AREA 2:  REMAINDER  ELDORADO 
COUNTY:  AREA 1:  NORTH CENTRAL PART  AREA 2:  
REMAINDER     FRESNO COUNTY:   AREA 1: REMAINDER   
AREA 2: EASTERN PART    GLENN COUNTY:  AREA 1:  
EASTERN PART  AREA 2: REMAINDER    LASSEN COUNTY:  
AREA 1:  WESTERN PART ALONG THE SOUTHERN PORTION OF 
BORDER WITH SHASTA COUNTY  AREA 2:  REMAINDER  
MADERA COUNTY:   AREA 1: EXCEPT EASTERN PART   AREA 
2: EASTERN PART    MARIPOSA COUNTY   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART    MONTERREY 
COUNTY   AREA 1: EXCEPT SOUTHWESTERN PART   AREA 2: 
SOUTHWESTERN PART    NEVADA COUNTY:  AREA 1:  ALL 
BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA 
COUNTY  AREA 2:  REMAINDER  PLACER COUNTY:  AREA 1: 
 AL BUT THE CENTRAL PORTION  AREA 2:  REMAINDER  
PLUMAS COUNTY:  AREA 1:  WESTERN PORTION  AREA 2:  
REMAINDER  SHASTA COUNTY:  AREA 1:  ALL BUT THE 
NORTHEASTERN CORNER  AREA 2:  REMAINDER  SIERRA 
COUNTY:  AREA 1:  WESTERN PART  AREA 2:  REMAINDER  
SISKIYOU COUNTY:  AREA 1:  CENTRAL PART  AREA 2:  
REMAINDER  SONOMA COUNTY:  AREA 1:  ALL BUT THE 
NORTHWESTERN CORNER  AREA 2:  REMAINDER  TEHAMA 
COUNTY:  AREA 1:  ALL BUT THE WESTERN BORDER WITH 
MENDOCINO & TRINITY COUNTIES  AREA 2:  REMAINDER  
TRINITY COUNTY:  AREA 1:  EAST CENTRAL PART AND THE 
NORTHEASTERN BORDER WITH SHASTA COUNTY  AREA 2:  
REMAINDER  TUOLUMNE COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART.................$ 57.65                  39.55
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 2:   (1) LEVERMAN     AREA 
DESCRIPTIONS    AREA 1: ALAMEDA,BUTTE, CONTRA 
COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN 
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, 
SUTTER, YOLO, AND YUBA COUNTIES    AREA 2:  MODOC 
COUNTY  THE REMAINGING COUNTIES ARE SPLIT BETWEEN 
AREA 1 AND AREA 2 AS NOTED BELOW:    ALPINE COUNTY: 
 AREA 1:  NORTHERNMOST PART  AREA 2:  REMAINDER  
CALAVERAS COUNTY:   AREA 1: REMAINDER   AREA 2: 
EASTERN PART    COLUSA COUNTY:  AREA 1:  EASTERN 
PART  AREA 2:  REMAINDER  ELDORADO COUNTY:  AREA 1: 
 NORTH CENTRAL PART  AREA 2:  REMAINDER     FRESNO 
COUNTY:   AREA 1: REMAINDER   AREA 2: EASTERN PART  
  GLENN COUNTY:  AREA 1:  EASTERN PART  AREA 2: 
REMAINDER    LASSEN COUNTY:  AREA 1:  WESTERN PART 
ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA 
COUNTY  AREA 2:  REMAINDER  MADERA COUNTY:   AREA 
1: EXCEPT EASTERN PART   AREA 2: EASTERN PART    
MARIPOSA COUNTY   AREA 1: EXCEPT EASTERN PART   
AREA 2: EASTERN PART    MONTERREY COUNTY   AREA 1: 
EXCEPT SOUTHWESTERN PART   AREA 2: SOUTHWESTERN 
PART    NEVADA COUNTY:  AREA 1:  ALL BUT THE 
NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY  
AREA 2:  REMAINDER  PLACER COUNTY:  AREA 1:  AL BUT 
THE CENTRAL PORTION  AREA 2:  REMAINDER  PLUMAS 
COUNTY:  AREA 1:  WESTERN PORTION  AREA 2:  
REMAINDER  SHASTA COUNTY:  AREA 1:  ALL BUT THE 
NORTHEASTERN CORNER  AREA 2:  REMAINDER  SIERRA 
COUNTY:  AREA 1:  WESTERN PART  AREA 2:  REMAINDER  
SISKIYOU COUNTY:  AREA 1:  CENTRAL PART  AREA 2:  
REMAINDER  SONOMA COUNTY:  AREA 1:  ALL BUT THE 
NORTHWESTERN CORNER  AREA 2:  REMAINDER  TEHAMA 
COUNTY:  AREA 1:  ALL BUT THE WESTERN BORDER WITH 
MENDOCINO & TRINITY COUNTIES  AREA 2:  REMAINDER  
TRINITY COUNTY:  AREA 1:  EAST CENTRAL PART AND THE 
NORTHEASTERN BORDER WITH SHASTA COUNTY  AREA 2:  
REMAINDER  TUOLUMNE COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART.................$ 62.61                  39.55
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 1:   (4) BARGEMAN; DECKHAND; 
FIREMAN; LEVEEHAND; OILER     AREA DESCRIPTIONS    
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, 
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND 
YUBA COUNTIES    AREA 2:  MODOC COUNTY  THE 
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED BELOW:    ALPINE COUNTY:  AREA 1:  
NORTHERNMOST PART  AREA 2:  REMAINDER  CALAVERAS 
COUNTY:   AREA 1: REMAINDER   AREA 2: EASTERN PART  
  COLUSA COUNTY:  AREA 1:  EASTERN PART  AREA 2:  
REMAINDER  ELDORADO COUNTY:  AREA 1:  NORTH CENTRAL 
PART  AREA 2:  REMAINDER     FRESNO COUNTY:   AREA 
1: REMAINDER   AREA 2: EASTERN PART    GLENN 
COUNTY:  AREA 1:  EASTERN PART  AREA 2: REMAINDER   
 LASSEN COUNTY:  AREA 1:  WESTERN PART ALONG THE 
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY  AREA 
2:  REMAINDER  MADERA COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART    MARIPOSA 
COUNTY   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART    MONTERREY COUNTY   AREA 1: EXCEPT 
SOUTHWESTERN PART   AREA 2: SOUTHWESTERN PART    
NEVADA COUNTY:  AREA 1:  ALL BUT THE NORTHERN 
PORTION ALONG THE BORDER OF SIERRA COUNTY  AREA 2:  
REMAINDER  PLACER COUNTY:  AREA 1:  AL BUT THE 
CENTRAL PORTION  AREA 2:  REMAINDER  PLUMAS COUNTY: 
 AREA 1:  WESTERN PORTION  AREA 2:  REMAINDER  
SHASTA COUNTY:  AREA 1:  ALL BUT THE NORTHEASTERN 
CORNER  AREA 2:  REMAINDER  SIERRA COUNTY:  AREA 1: 
 WESTERN PART  AREA 2:  REMAINDER  SISKIYOU COUNTY: 
 AREA 1:  CENTRAL PART  AREA 2:  REMAINDER  SONOMA 
COUNTY:  AREA 1:  ALL BUT THE NORTHWESTERN CORNER  
AREA 2:  REMAINDER  TEHAMA COUNTY:  AREA 1:  ALL 
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY 
COUNTIES  AREA 2:  REMAINDER  TRINITY COUNTY:  AREA 
1:  EAST CENTRAL PART AND THE NORTHEASTERN BORDER 
WITH SHASTA COUNTY  AREA 2:  REMAINDER  TUOLUMNE 
COUNTY:   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART........................................$ 51.23                  39.55
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 1:   (3) BOOSTER PUMP 
OPERATOR; DECK   ENGINEER; DECK MATE; DREDGE 
TENDER; WINCH OPERATOR     AREA DESCRIPTIONS    
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, 
MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND 
YUBA COUNTIES    AREA 2:  MODOC COUNTY  THE 
REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED BELOW:    ALPINE COUNTY:  AREA 1:  
NORTHERNMOST PART  AREA 2:  REMAINDER  CALAVERAS 
COUNTY:   AREA 1: REMAINDER   AREA 2: EASTERN PART  
  COLUSA COUNTY:  AREA 1:  EASTERN PART  AREA 2:  
REMAINDER  ELDORADO COUNTY:  AREA 1:  NORTH CENTRAL 
PART  AREA 2:  REMAINDER     FRESNO COUNTY:   AREA 
1: REMAINDER   AREA 2: EASTERN PART    GLENN 
COUNTY:  AREA 1:  EASTERN PART  AREA 2: REMAINDER   
 LASSEN COUNTY:  AREA 1:  WESTERN PART ALONG THE 
SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY  AREA 
2:  REMAINDER  MADERA COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART    MARIPOSA 
COUNTY   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART    MONTERREY COUNTY   AREA 1: EXCEPT 
SOUTHWESTERN PART   AREA 2: SOUTHWESTERN PART    
NEVADA COUNTY:  AREA 1:  ALL BUT THE NORTHERN 
PORTION ALONG THE BORDER OF SIERRA COUNTY  AREA 2:  
REMAINDER  PLACER COUNTY:  AREA 1:  AL BUT THE 
CENTRAL PORTION  AREA 2:  REMAINDER  PLUMAS COUNTY: 
 AREA 1:  WESTERN PORTION  AREA 2:  REMAINDER  
SHASTA COUNTY:  AREA 1:  ALL BUT THE NORTHEASTERN 
CORNER  AREA 2:  REMAINDER  SIERRA COUNTY:  AREA 1: 
 WESTERN PART  AREA 2:  REMAINDER  SISKIYOU COUNTY: 
 AREA 1:  CENTRAL PART  AREA 2:  REMAINDER  SONOMA 
COUNTY:  AREA 1:  ALL BUT THE NORTHWESTERN CORNER  
AREA 2:  REMAINDER  TEHAMA COUNTY:  AREA 1:  ALL 
BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY 
COUNTIES  AREA 2:  REMAINDER  TRINITY COUNTY:  AREA 
1:  EAST CENTRAL PART AND THE NORTHEASTERN BORDER 
WITH SHASTA COUNTY  AREA 2:  REMAINDER  TUOLUMNE 
COUNTY:   AREA 1: EXCEPT EASTERN PART   AREA 2: 
EASTERN PART........................................$ 54.53                  39.55
DREDGING (CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 1:   (1) LEVERMAN     AREA 
DESCRIPTIONS    AREA 1: ALAMEDA,BUTTE, CONTRA 
COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN 
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, 
SUTTER, YOLO, AND YUBA COUNTIES    AREA 2:  MODOC 
COUNTY  THE REMAINGING COUNTIES ARE SPLIT BETWEEN 
AREA 1 AND AREA 2 AS NOTED BELOW:    ALPINE COUNTY: 
 AREA 1:  NORTHERNMOST PART  AREA 2:  REMAINDER  
CALAVERAS COUNTY:   AREA 1: REMAINDER   AREA 2: 
EASTERN PART    COLUSA COUNTY:  AREA 1:  EASTERN 
PART  AREA 2:  REMAINDER  ELDORADO COUNTY:  AREA 1: 
 NORTH CENTRAL PART  AREA 2:  REMAINDER     FRESNO 
COUNTY:   AREA 1: REMAINDER   AREA 2: EASTERN PART  
  GLENN COUNTY:  AREA 1:  EASTERN PART  AREA 2: 
REMAINDER    LASSEN COUNTY:  AREA 1:  WESTERN PART 
ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA 
COUNTY  AREA 2:  REMAINDER  MADERA COUNTY:   AREA 
1: EXCEPT EASTERN PART   AREA 2: EASTERN PART    
MARIPOSA COUNTY   AREA 1: EXCEPT EASTERN PART   
AREA 2: EASTERN PART    MONTERREY COUNTY   AREA 1: 
EXCEPT SOUTHWESTERN PART   AREA 2: SOUTHWESTERN 
PART    NEVADA COUNTY:  AREA 1:  ALL BUT THE 
NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY  
AREA 2:  REMAINDER  PLACER COUNTY:  AREA 1:  AL BUT 
THE CENTRAL PORTION  AREA 2:  REMAINDER  PLUMAS 
COUNTY:  AREA 1:  WESTERN PORTION  AREA 2:  
REMAINDER  SHASTA COUNTY:  AREA 1:  ALL BUT THE 
NORTHEASTERN CORNER  AREA 2:  REMAINDER  SIERRA 
COUNTY:  AREA 1:  WESTERN PART  AREA 2:  REMAINDER  
SISKIYOU COUNTY:  AREA 1:  CENTRAL PART  AREA 2:  
REMAINDER  SONOMA COUNTY:  AREA 1:  ALL BUT THE 
NORTHWESTERN CORNER  AREA 2:  REMAINDER  TEHAMA 
COUNTY:  AREA 1:  ALL BUT THE WESTERN BORDER WITH 
MENDOCINO & TRINITY COUNTIES  AREA 2:  REMAINDER  
TRINITY COUNTY:  AREA 1:  EAST CENTRAL PART AND THE 
NORTHEASTERN BORDER WITH SHASTA COUNTY  AREA 2:  
REMAINDER  TUOLUMNE COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART.................$ 60.61                  39.55
DREDGING ( CLAMSHELL & DIPPER DREDGING;  HYDRAULIC 
SUCTION DREDGING) AREA 1:   (2) DREDGE DOZER; HEAVY 
DUTY REPAIRMAN    AREA DESCRIPTIONS    AREA 1: 
ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, 
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES 
   AREA 2:  MODOC COUNTY  THE REMAINGING COUNTIES 
ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: 
   ALPINE COUNTY:  AREA 1:  NORTHERNMOST PART  AREA 
2:  REMAINDER  CALAVERAS COUNTY:   AREA 1: 
REMAINDER   AREA 2: EASTERN PART    COLUSA COUNTY:  
AREA 1:  EASTERN PART  AREA 2:  REMAINDER  ELDORADO 
COUNTY:  AREA 1:  NORTH CENTRAL PART  AREA 2:  
REMAINDER     FRESNO COUNTY:   AREA 1: REMAINDER   
AREA 2: EASTERN PART    GLENN COUNTY:  AREA 1:  
EASTERN PART  AREA 2: REMAINDER    LASSEN COUNTY:  
AREA 1:  WESTERN PART ALONG THE SOUTHERN PORTION OF 
BORDER WITH SHASTA COUNTY  AREA 2:  REMAINDER  
MADERA COUNTY:   AREA 1: EXCEPT EASTERN PART   AREA 
2: EASTERN PART    MARIPOSA COUNTY   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART    MONTERREY 
COUNTY   AREA 1: EXCEPT SOUTHWESTERN PART   AREA 2: 
SOUTHWESTERN PART    NEVADA COUNTY:  AREA 1:  ALL 
BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA 
COUNTY  AREA 2:  REMAINDER  PLACER COUNTY:  AREA 1: 
 AL BUT THE CENTRAL PORTION  AREA 2:  REMAINDER  
PLUMAS COUNTY:  AREA 1:  WESTERN PORTION  AREA 2:  
REMAINDER  SHASTA COUNTY:  AREA 1:  ALL BUT THE 
NORTHEASTERN CORNER  AREA 2:  REMAINDER  SIERRA 
COUNTY:  AREA 1:  WESTERN PART  AREA 2:  REMAINDER  
SISKIYOU COUNTY:  AREA 1:  CENTRAL PART  AREA 2:  
REMAINDER  SONOMA COUNTY:  AREA 1:  ALL BUT THE 
NORTHWESTERN CORNER  AREA 2:  REMAINDER  TEHAMA 
COUNTY:  AREA 1:  ALL BUT THE WESTERN BORDER WITH 
MENDOCINO & TRINITY COUNTIES  AREA 2:  REMAINDER  
TRINITY COUNTY:  AREA 1:  EAST CENTRAL PART AND THE 
NORTHEASTERN BORDER WITH SHASTA COUNTY  AREA 2:  
REMAINDER  TUOLUMNE COUNTY:   AREA 1: EXCEPT 
EASTERN PART   AREA 2: EASTERN PART.................$ 55.65                  39.55
----------------------------------------------------------------

 ENGI0003-019 06/30/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 3 (AREA 2)....................................$ 49.64                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 3 (AREA 1)....................................$ 47.64                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 2 (AREA 2)....................................$ 54.25                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 2 (AREA 1)....................................$ 52.25                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 1 (AREA 2)....................................$ 57.85                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 1 (AREA 1)....................................$ 55.85                  28.56
------------------------------------

Source: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.