8 Counties in Illinois Davis-Bacon Wage Rates: Heavy and Highway

Updated

Federal prevailing wage rates (Davis-Bacon) for heavy and highway construction in 8 Counties in Illinois: 44 classifications, base rates from $37.90 to $62.71 an hour plus fringe benefits. General decision IL20260011, modification 2, published May 21, 2026.

TypeDavis-Bacon (construction)
NumberIL20260011
Modification2
PublishedMay 21, 2026
StateIllinois
AreaIllinois Counties of Boone, De Kalb, Du Page, Kane, Kendall, Lake, McHenry and Will
Construction typeHeavy and Highway
Get new federal construction bids in Illinois by email
Only new notices that match, once a day. Federal bids in Illinois that match your words.

Wage rates and fringe benefits (44)

ClassificationBase rateFringeTotalIllinois median
Carpenter: Heavy & Highway (Dupage Ane Lake Counties)$52.01$38.85$90.86
Carpenter: Building (Dupage Ane Lake Counties)$52.01$38.85$90.86
Carpenter and Piledriver (Will County)$49.76$38.26$88.02$45.56 (+$4.20)
Carpenter and Piledriver (Kane, Mchenry (North of Hwy 52), and Kendall Counties)$52.01$38.86$90.87$45.56 (+$6.45)
Carpenter (De Kalb County)$48.60$38.53$87.13$37.36 (+$11.24)
Carpenter (Carroll, Jo Daviess, Lee, Ogle (Oregon and South Thereof), Stephenson, and Whiteside Counties)$48.60$38.53$87.13$37.36 (+$11.24)
Carpenter (Boone County)$51.00$36.13$87.13$37.36 (+$13.64)
Line Construction: Lineman and Equipment Operator (Will County)$62.10$37.29$99.39
Line Construction: Groundman (Will County)$48.44$29.09$77.53$48.44
Electrician (Kane (Northern Half) and Mchenry (All) Counties)$59.11$42.23$101.34$48.28 (+$10.83)
Electrician (Lake County)$48.28$50.46$98.74$48.28
Electrician (Will County)$52.00$45.01$97.01$48.28 (+$3.72)
Electrician (Boone (All) & Dekalb (Remainder) Counties)$62.61$43.96$106.57$48.28 (+$14.33)
Electrician (Dekalb (Sandwich Twp), Kane (Southern Half) & Kendall (All) Counties)$60.17$43.50$103.67$48.28 (+$11.89)
Electrician (Dupage County)$41.00$43.40$84.40$48.28 (-$7.28)
Ironworker: Sheeter (Du Page (Eastern 1/4), Lake, and Mchenry (Hebron, Woodstock, and East Thereof) Counties)$62.71$46.58$109.29
Ironworker, Ornamental (Lake, Dupage (Eastern 1/4) and Mchenry (Hebron, Woodstock & East Thereof) Counties)$59.26$44.81$104.07
Ironworker (Kendall (Southern Part) and Will Counties)$47.80$42.50$90.30$42.82 (+$4.98)
Ironworker (Boone, Dekalb (Except Southeast), and Mchenry (Northwest) Counties)$41.37$44.41$85.78$42.82 (-$1.45)
Laborer, Sewer Construction: Group 2 Concrete Laborers; Steel Setters. (Dupage County)$51.53$36.94$88.47
Laborer, Sewer Construction: Group 1 Signalmen Top Laborers, and All Other Laborers Not Mentioned. (Dupage County)$51.40$36.94$88.34
Laborer, Tunnel: Group 1 Cage Tenders; Dumpmen; Flagmen; Signalmen; Top Laborers (Dupage County)$51.40$36.94$88.34
Laborer, Compressed Air: 34 Lbs and over (Du Page County)$55.40$36.94$92.34
LABORER, COMPRESSED AIR, 27-33 lbs (DU PAGE COUNTY)$54.40$36.94$91.34
LABORER, COMPRESSED AIR, 21-26 lbs (DU PAGE COUNTY)$53.40$36.94$90.34
LABORER, COMPRESSED AIR, 16-20 lbs (DU PAGE COUNTY)$52.90$36.94$89.84
LABORER, COMPRESSED AIR, 0-15 lbs (DU PAGE COUNTY)$52.40$36.94$89.34
Laborer Group 8 Flagman (Boone, Kane, Kendall, and Mchenry Counties)$51.40$36.94$88.34
Laborer Group 7 Caisson Diggers, Dynamiters (Boone, Kane, Kendall, and Mchenry Counties)$51.75$36.94$88.69
Laborer Group 6 Tunnel Laborers, Tile Layers & Bottom Men (Boone, Kane, Kendall, and Mchenry Counties)$51.75$36.94$88.69
Laborer Group 3 Mortar & Concrete Mixers (Boone, Kane, Kendall, and Mchenry Counties)$51.68$36.94$88.62
Laborer Group 2 Air Tampers & Vibrators (Boone, Kane, Kendall, and Mchenry Counties)$51.68$36.94$88.62
Laborer Group 5 Cement Gun Nozzle (Gunite) (Lake County)$51.60$36.94$88.54
Laborer Group 3 Asphalt Tampers and Smoothers (Lake County)$51.40$36.94$88.34
Laborer Group 2 Cement Gun Laborers (Lake County)$51.48$36.94$88.42
Laborer Group 1 General Laborers; Asphalt (Lake County)$51.40$36.94$88.34
Painter: Brush Only (Lake and Will Counties)$53.05$33.91$86.96
Painter: Brush, Drywall Taper/Finisher, Sandblaster, and Spray (De Kalb, Du Page, Kane, Kendall and Mchenry Counties)$53.05$27.63$80.68
Cement Mason/Concrete Finisher (Will County)$46.25$45.10$91.35$36.56 (+$9.69)
Cement Mason/Concrete Finisher (De Kalb, Kane, Kendall, and Mchenry Counties)$50.70$40.60$91.30$36.56 (+$14.14)
Cement Mason/Concrete Finisher (Lake County)$48.50$42.82$91.32$36.56 (+$11.94)
Plasterer (Boone County)$37.90$37.66$75.56
Cement Mason/Concrete Finisher (Boone County)$41.03$36.39$77.42$36.56 (+$4.47)
Cement Mason/Concrete Finisher (Dupage County)$38.00$24.03$62.03$36.56 (+$1.44)

The median is the middle rate for the same work across Illinois's heavy and highway wage determinations in force today, shown when at least three have it.

How to use these rates

On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.

Other Davis-Bacon heavy and highway wage determinations in Illinois

All Illinois prevailing wage rates · Open federal bids in Illinois

Full text of IL20260011

Show the official text (63,588 characters)
General Decision Number: IL20260011 05/21/2026


State: Illinois


Construction Types: Heavy and Highway


Counties: Illinois Counties of 
Boone, De Kalb, Du Page, Kane, Kendall, 
Lake, McHenry and Will




Excludes Landscape Projects


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026
          2                05/21/2026


 CARP0555-003 06/01/2022
                                                     Rates                  Fringes
CARPENTER: HEAVY & HIGHWAY (DUPAGE ANE LAKE 
COUNTIES)...........................................$ 52.01                  38.85
CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES)......$ 52.01                  38.85
----------------------------------------------------------------

 CARP0555-008 06/01/2020
                                                     Rates                  Fringes
CARPENTER AND PILEDRIVER (WILL COUNTY)..............$ 49.76                  38.26
----------------------------------------------------------------

 CARP0555-011 06/01/2022
                                                     Rates                  Fringes
CARPENTER AND PILEDRIVER (KANE, MCHENRY (NORTH OF 
HWY 52), AND KENDALL COUNTIES)......................$ 52.01                  38.86
----------------------------------------------------------------

 CARP0790-003 05/01/2025
                                                     Rates                  Fringes
CARPENTER (DE KALB COUNTY)..........................$ 48.60                  38.53
----------------------------------------------------------------

 CARP0790-004 05/01/2025
                                                     Rates                  Fringes
CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE (OREGON 
AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE 
COUNTIES)...........................................$ 48.60                  38.53
----------------------------------------------------------------

 CARP0792-003 05/01/2025
                                                     Rates                  Fringes
CARPENTER (BOONE COUNTY)............................$ 51.00                  36.13
----------------------------------------------------------------

 ELEC0009-002 05/26/2024
                                                     Rates                  Fringes
LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR 
(WILL COUNTY).......................................$ 62.10                  37.29
LINE CONSTRUCTION: GROUNDMAN (WILL COUNTY)..........$ 48.44                  29.09
----------------------------------------------------------------

 ELEC0117-001 06/02/2025
                                                     Rates                  Fringes
ELECTRICIAN (KANE (NORTHERN HALF) AND MCHENRY (ALL) 
COUNTIES)...........................................$ 59.11                  42.23
----------------------------------------------------------------

 ELEC0150-001 06/03/2024
                                                     Rates                  Fringes
ELECTRICIAN (LAKE COUNTY)...........................$ 48.28                  50.46
----------------------------------------------------------------

 ELEC0176-011 06/01/2023
                                                     Rates                  Fringes
ELECTRICIAN (WILL COUNTY)...........................$ 52.00                  45.01
----------------------------------------------------------------

 ELEC0196-001 03/06/2023
                                                     Rates                  Fringes
LINE CONSTRUCTION: LINEMAN, SUBSTATION TECHNICIAN, 
CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE 
OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN   
(BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND 
MCHENRY COUNTIES)    FOOTNOTE:  A.  PAID HOLIDAYS:  
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND 
THANKSGIVING DAY....................................$ 59.17                  27.12
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER   (BOONE, 
DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY 
COUNTIES)    FOOTNOTE:  A.  PAID HOLIDAYS:  
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND 
THANKSGIVING DAY....................................$ 39.19                  20.32
LINE CONSTRUCTION: GROUNDMAN   (BOONE, DEKALB, 
DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES)  
  FOOTNOTE:  A.  PAID HOLIDAYS:  MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 37.81                  19.86
LINE CONSTRUCTION: EQUIPMENT OPERATOR   (BOONE, 
DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY 
COUNTIES)    FOOTNOTE:  A.  PAID HOLIDAYS:  
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND 
THANKSGIVING DAY....................................$ 49.22                  23.73
----------------------------------------------------------------

 ELEC0364-003 06/02/2025
                                                     Rates                  Fringes
ELECTRICIAN (BOONE (ALL) & DEKALB (REMAINDER) 
COUNTIES)...........................................$ 62.61                  43.96
----------------------------------------------------------------

 ELEC0461-006 06/02/2025
                                                     Rates                  Fringes
ELECTRICIAN (DEKALB (SANDWICH TWP), KANE (SOUTHERN 
HALF) & KENDALL (ALL) COUNTIES).....................$ 60.17                  43.50
----------------------------------------------------------------

 ELEC0701-001 06/03/2019
                                                     Rates                  Fringes
ELECTRICIAN (DUPAGE COUNTY).........................$ 41.00                  43.40
----------------------------------------------------------------

 ENGI0150-015 06/01/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, GROUP 5 OILERS  (BOONE 
AND DE KALB COUNTIES)  PREMIUM PAY:    LONG BOOM :  
  CRANES & DERRICKS 90' TO 150' INCLUDING JIB 
RECEIVE AN EXTRA  $.50 PER HOUR.  CRANES & DERRICKS 
OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50  PER 
HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 
10' OF BOOM  OR JIB.    CAPACITY PAY:  CRANES & 
DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON 
WITH  LESS THAN 90' OF BOOM OR JIB SHALL BE 
COMPENSATED $.01 PER HOUR  FOR EACH TON OF THE 
RATED CAPACITY IN EXCESS OF 50 TON.    LONG BOOM 
PAY AND CAPACITY PAY CANNOT BE COMBINED.    CRANE 
MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, 
AND  TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 
PER HOUR.    CRETER CRANES:    WHEN THE CRETER 
CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE  
OF EXTENDING 70' OR MORE, THE ENGINEER SHALL 
RECEIVE AN EXTRA  $.50 PER HOUR.    TRUCK MOUNTED 
CONCRETE PUMPS:    WHEN THE TRUCK MOUNTED CONCRETE 
PUMP IS EQUIPPED WITH A BOOM,  WHICH IS CAPABLE OF 
EXTENDING 90' OR MORE, THE ENGINEER SHALL  RECEIVE 
$.50 PER HOUR EXTRA.    TRUCK MOUNTED CONCRETE 
CONVEYOR:    TRUCK MOUNTED CONCRETE CONVEYORS 
EQUIPPED WITH CONVEYORS THAT  ARE CAPABLE OF 
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE  
AN EXTRA $.50 PER HOUR.    UNDERGROUND WORK:    
EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE 
PAID AN  ADDITIONAL $.40 PER HOUR. EMPLOYEES 
WORKING UNDER AIR PRESSURE  1/2 POUND TO 7 POUNDS 
SHALL RECEIVE AN ADDITIONAL $.50 PER  HOUR. 
EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR 
OVER  SHALL RECEIVE $.65 PER HOUR MORE.    MINING 
MACHINES- BORING MACHINES:    THE CREW OPERATING 
AND MAINTAINING THE MINING MACHINES SHALL BE  
COMPENSATED AN ADDITIONAL $.50 PER HOUR.............$ 50.85                  51.05
OPERATOR:  POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR 
- SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL 
OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; 
ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL 
EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND 
UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, 
MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, 
EXTRACTING OR DRILLING); LIGHT PLANTS ALL (1 TO 5); 
PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 
300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING 
MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC 
DRILL WINCHES; BOBCATS UP TO AND INCLUDING .75 CU 
YD  (BOONE AND DE KALB COUNTIES)   PREMIUM PAY:    
LONG BOOM :    CRANES & DERRICKS 90' TO 150' 
INCLUDING JIB RECEIVE AN EXTRA  $.50 PER HOUR.  
CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE 
AN EXTRA $.50  PER HOUR PLUS AN ADDITIONAL $.10 FOR 
EACH ADDITIONAL 10' OF BOOM  OR JIB.    CAPACITY 
PAY:  CRANES & DERRICKS WITH MAXIMUM CAPACITY 
EXCEEDING 50 TON WITH  LESS THAN 90' OF BOOM OR JIB 
SHALL BE COMPENSATED $.01 PER HOUR  FOR EACH TON OF 
THE RATED CAPACITY IN EXCESS OF 50 TON.    LONG 
BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED.    
CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE 
DRILLS, AND  TRUCK MOUNTED DRILL RIGS RECEIVE AN 
EXTRA $.50 PER HOUR.    CRETER CRANES:    WHEN THE 
CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM 
CAPABLE  OF EXTENDING 70' OR MORE, THE ENGINEER 
SHALL RECEIVE AN EXTRA  $.50 PER HOUR.    TRUCK 
MOUNTED CONCRETE PUMPS:    WHEN THE TRUCK MOUNTED 
CONCRETE PUMP IS EQUIPPED WITH A BOOM,  WHICH IS 
CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER 
SHALL  RECEIVE $.50 PER HOUR EXTRA.    TRUCK 
MOUNTED CONCRETE CONVEYOR:    TRUCK MOUNTED 
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT  
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER 
SHALL RECEIVE  AN EXTRA $.50 PER HOUR.    
UNDERGROUND WORK:    EMPLOYEES WORKING IN TUNNELS, 
SHAFTS, ETC. SHALL BE PAID AN  ADDITIONAL $.40 PER 
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE  1/2 
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 
PER  HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 
7 POUNDS OR OVER  SHALL RECEIVE $.65 PER HOUR MORE. 
   MINING MACHINES- BORING MACHINES:    THE CREW 
OPERATING AND MAINTAINING THE MINING MACHINES SHALL 
BE  COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 53.30                  51.05
OPERATOR:  POWER EQUIPMENT, GROUP 3 BOILERS; 
BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; 
COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, 
TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE 
TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON 
BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; 
HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, 
TUGGER SINGLE DRUM; JEEP DIGGERS; PIPE JACKING 
MACHINES; POST- HOLE DIGGER; POWER SAW, CONCRETE, 
POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN 
ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; 
STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK 
BOATS; TAMPER-FORM MOTOR DRIVEN  (BOONE AND DE KALB 
COUNTIES)  PREMIUM PAY:    LONG BOOM :    CRANES & 
DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA 
 $.50 PER HOUR.  CRANES & DERRICKS OVER 150' 
INCLUDING JIB RECEIVE AN EXTRA $.50  PER HOUR PLUS 
AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM  
OR JIB.    CAPACITY PAY:  CRANES & DERRICKS WITH 
MAXIMUM CAPACITY EXCEEDING 50 TON WITH  LESS THAN 
90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER 
HOUR  FOR EACH TON OF THE RATED CAPACITY IN EXCESS 
OF 50 TON.    LONG BOOM PAY AND CAPACITY PAY CANNOT 
BE COMBINED.    CRANE MOUNTED EARTH AUGER, RAISED 
AND BLIND HOLE DRILLS, AND  TRUCK MOUNTED DRILL 
RIGS RECEIVE AN EXTRA $.50 PER HOUR.    CRETER 
CRANES:    WHEN THE CRETER CRANE IS EQUIPPED WITH A 
CONVEYOR SYSTEM CAPABLE  OF EXTENDING 70' OR MORE, 
THE ENGINEER SHALL RECEIVE AN EXTRA  $.50 PER HOUR. 
   TRUCK MOUNTED CONCRETE PUMPS:    WHEN THE TRUCK 
MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM,  
WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE 
ENGINEER SHALL  RECEIVE $.50 PER HOUR EXTRA.    
TRUCK MOUNTED CONCRETE CONVEYOR:    TRUCK MOUNTED 
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT  
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER 
SHALL RECEIVE  AN EXTRA $.50 PER HOUR.    
UNDERGROUND WORK:    EMPLOYEES WORKING IN TUNNELS, 
SHAFTS, ETC. SHALL BE PAID AN  ADDITIONAL $.40 PER 
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE  1/2 
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 
PER  HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 
7 POUNDS OR OVER  SHALL RECEIVE $.65 PER HOUR MORE. 
   MINING MACHINES- BORING MACHINES:    THE CREW 
OPERATING AND MAINTAINING THE MINING MACHINES SHALL 
BE  COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 54.75                  51.05
OPERATOR:  POWER EQUIPMENT, GROUP 2 BATCH PLANT; 
BITUMINOUS MIXER; BOBCATS OVER .75 CU YD; BOILER 
AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING 
CONVEYORS;  COMBINATION BACKKHOE FRONT END LOADER 
MACHINE, LESS THAN 1 CU YD BACKHOE BUCKET WITH 
ATTACHMENTS; COMPRESSOR AND THROTTLE VALVE; 
COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER 
OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; 
CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 
27 CU FT; CONCRETE SPREADER; CONCRETE CURING 
MACHINE, BURLAP MACHINE; BELTING MACHINE AND 
SEALING MACHINE; CONVEYOR  MUCK CARS (HAGLUND OR 
SIMILAR TYPE); FINISHING MACHINE-CONCRETE; GREASER 
ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; 
HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM 
TRUCKS, ALL ATTACHMENTS; LOCOMOTIVES, DINKY; PUMP 
CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM 
BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; 
ROTOTILLER, SEAMAN, ETC SELF-PROPELLED; 
SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR; 
SPREADER-CHIP- STONE ETC; SCRAPER; SCRAPER-PRIME 
MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO 
GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH 
MACHINE ATTACHED THERETO); TANK CAR HEATER; 
TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR 
COMPACTOR, ETC; TUG BOATS  PREMIUM PAY:    LONG 
BOOM :    CRANES & DERRICKS 90' TO 150' INCLUDING 
JIB RECEIVE AN EXTRA  $.50 PER HOUR.  CRANES & 
DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA 
$.50  PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH 
ADDITIONAL 10' OF BOOM  OR JIB.    CAPACITY PAY:  
CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 
50 TON WITH  LESS THAN 90' OF BOOM OR JIB SHALL BE 
COMPENSATED $.01 PER HOUR  FOR EACH TON OF THE 
RATED CAPACITY IN EXCESS OF 50 TON.    LONG BOOM 
PAY AND CAPACITY PAY CANNOT BE COMBINED.    CRANE 
MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, 
AND  TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 
PER HOUR.    CRETER CRANES:    WHEN THE CRETER 
CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE  
OF EXTENDING 70' OR MORE, THE ENGINEER SHALL 
RECEIVE AN EXTRA  $.50 PER HOUR.    TRUCK MOUNTED 
CONCRETE PUMPS:    WHEN THE TRUCK MOUNTED CONCRETE 
PUMP IS EQUIPPED WITH A BOOM,  WHICH IS CAPABLE OF 
EXTENDING 90' OR MORE, THE ENGINEER SHALL  RECEIVE 
$.50 PER HOUR EXTRA.    TRUCK MOUNTED CONCRETE 
CONVEYOR:    TRUCK MOUNTED CONCRETE CONVEYORS 
EQUIPPED WITH CONVEYORS THAT  ARE CAPABLE OF 
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE  
AN EXTRA $.50 PER HOUR.    UNDERGROUND WORK:    
EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE 
PAID AN  ADDITIONAL $.40 PER HOUR. EMPLOYEES 
WORKING UNDER AIR PRESSURE  1/2 POUND TO 7 POUNDS 
SHALL RECEIVE AN ADDITIONAL $.50 PER  HOUR. 
EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR 
OVER  SHALL RECEIVE $.65 PER HOUR MORE.    MINING 
MACHINES- BORING MACHINES:    THE CREW OPERATING 
AND MAINTAINING THE MINING MACHINES SHALL BE  
COMPENSATED AN ADDITIONAL $.50 PER HOUR.  (BOONE 
AND DE KALB COUNTIES)...............................$ 56.05                  51.05
OPERATOR:  POWER EQUIPMENT, GROUP 1 ASPHALT PLANT; 
ASPHALT HEATER AND PLANER COMBINATION; ASPHALT 
SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO 
OR SIMILAR; BELT LOADER; CAISSON RIGS; CAR DUMPER, 
CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE FRONT 
END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET 
WITH ATTACHMENTS); BACKHOE WITH SHEAR ATTACHMENT; 
CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE 
CONVEYOR; CONCRETE PAVER OVER 27E CU FT; CONCRETE 
PLACER; CONCRETE TUBE FLOAT; CRANES, ALL 
ATTACHMENTS; CRANES, HAMMERHEAD, LINDEN, PECO AND 
MACHINES OF A LIKE NATURE; CRETER CRANE; CRUSHER, 
STONE; DERRICKS; DERRICK BOATS; DERRICKS, 
TRAVELING; DREDGES; FIELD MECHANIC WELDER; FORMLESS 
CURB AND GUTTER MACHINE; GRADALL AND MACHINES OF A 
LIKE NATURE; GRADER, ELEVATING; GRADER, MOTOR 
GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, 
PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER 
MOUNTED; HOISTS, ONE, TWO, AND THREE DRUM; 
HYDRAULIC  BACKHOES; LOCOMOTIVE, ALL MUCKING 
MACHINE; PILE DRIVERS AND SKID RIG; PRE-STRESS 
MACHINE; PUMP CRETES DUAL RAM; ROCK DRILL-CRAWLER 
OR SKID RIG; ROCK DRILL TRUCK MOUNTED; ROTO MILL 
GRINDER, 36"" AND OVER; ROTO MILL GRINDER, LESS THAN 
36""; SLIP- FORM PAVER; SOIL TEST DRILL RIG, TRUCK 
MOUNTED; STRADDLE BUGGIES; GCI CRANE AND SIMILAR; 
HYDRAULIC TELESCOPING FORM (TUNNEL); TIE BACK 
MACHINE; TRACTOR DRAWN BELT LOADER: TRACTOR DRAWN 
BELT LOADER WITH ATTACHED PUSHER; TRACTOR WITH 
BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER 
CONVEYOR MACHINE; RAISED OR BLIND HOE DRILL (TUNNEL 
& SHAFT); TRENCHING MACHINE; TRUCK MOUNTED CONCRETE 
PUMP WITH BOOM; TRUCK MOUNTED CONCRETE CONVEYOR; 
UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5 
FT; WHEEL EXCAVATOR & WIDENER (APSCO)  (BOONE AND 
DE KALB COUNTIES)   PREMIUM PAY:    LONG BOOM :    
CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE 
AN EXTRA  $.50 PER HOUR.  CRANES & DERRICKS OVER 
150' INCLUDING JIB RECEIVE AN EXTRA $.50  PER HOUR 
PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF 
BOOM  OR JIB.    CAPACITY PAY:  CRANES & DERRICKS 
WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH  LESS 
THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 
PER HOUR  FOR EACH TON OF THE RATED CAPACITY IN 
EXCESS OF 50 TON.    LONG BOOM PAY AND CAPACITY PAY 
CANNOT BE COMBINED.    CRANE MOUNTED EARTH AUGER, 
RAISED AND BLIND HOLE DRILLS, AND  TRUCK MOUNTED 
DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR.    
CRETER CRANES:    WHEN THE CRETER CRANE IS EQUIPPED 
WITH A CONVEYOR SYSTEM CAPABLE  OF EXTENDING 70' OR 
MORE, THE ENGINEER SHALL RECEIVE AN EXTRA  $.50 PER 
HOUR.    TRUCK MOUNTED CONCRETE PUMPS:    WHEN THE 
TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A 
BOOM,  WHICH IS CAPABLE OF EXTENDING 90' OR MORE, 
THE ENGINEER SHALL  RECEIVE $.50 PER HOUR EXTRA.    
TRUCK MOUNTED CONCRETE CONVEYOR:    TRUCK MOUNTED 
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT  
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER 
SHALL RECEIVE  AN EXTRA $.50 PER HOUR.    
UNDERGROUND WORK:    EMPLOYEES WORKING IN TUNNELS, 
SHAFTS, ETC. SHALL BE PAID AN  ADDITIONAL $.40 PER 
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE  1/2 
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 
PER  HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 
7 POUNDS OR OVER  SHALL RECEIVE $.65 PER HOUR MORE. 
   MINING MACHINES- BORING MACHINES:    THE CREW 
OPERATING AND MAINTAINING THE MINING MACHINES SHALL 
BE  COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 56.60                  51.05
----------------------------------------------------------------

 ENGI0150-024 06/01/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); 
BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING  
(DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL 
COUNTIES)   ........................................$ 57.80                  51.00
OPERATOR:  POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR 
- SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL 
OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; 
COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL 
BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; 
GENERATORS - LARGE , OVER 50 KW; HEATERS, 
MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, 
EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); 
PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 
300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING 
MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC 
DRILL WINCHES;  (DUPAGE, KANE, KENDALL, LAKE, 
MCHENRY, AND WILL COUNTIES).........................$ 59.00                  51.00
OPERATOR:  POWER EQUIPMENT, GROUP 3 BOILERS; 
BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; 
COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, 
TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE 
TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON 
BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; 
HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, 
TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE 
JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, 
CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER 
THAN ASPHALT; SEED AND STRAW BLOWER; STEAM 
GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH 
A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN  
(DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL 
COUNTIES)...........................................$ 60.40                  51.00
OPERATOR:  POWER EQUIPMENT, GROUP 2 BATCH PLANT*; 
BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; 
BULLDOZER; CAR LOADER TRAILING CONVEYORS; 
COMBINATION BACKKHOE FRONT END LOADER MACHINE, 
(LESS THAN 1 CU YD BACKHOE BUCKET WITH 
ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; 
COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER 
OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; 
CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 
27 CU FT; CONCRETE SPREADER; CONCRETE CURING 
MACHINE; BURLAP MACHINE; BELTING MACHINE AND 
SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR  MUCK 
CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL); 
FINISHING MACHINE-CONCRETE; GREASER ENGINEER; 
HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER 
DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL 
ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO 
OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY; 
OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); 
PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS, 
GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW 
PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED; 
SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR; 
SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER 
IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2 
HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE 
ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE 
FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH, 
PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG 
BOATS  (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND 
WILL COUNTIES)   *REQUIRES OILER....................$ 62.45                  51.00
OPERATOR:  POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; 
ASPHALT HEATER AND PLANER COMBINATION; ASPHALT 
HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ 
GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH 
CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT 
LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX 
PLANT*, COMBINATION BACKHOE; FRONT END LOADER 
MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH 
ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); 
CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; 
CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL 
ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND 
MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER, 
STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS, 
TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR 
($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC 
WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL 
AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING; 
GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, 
FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL 
POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE 
DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR 
ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND 
SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM 
(REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK 
DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK 
MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER, 
(36"" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL 
RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC 
TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT 
LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED 
PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; 
TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER 
MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE 
PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING 
MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; 
WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND 
HOE DRILL, TUNNEL & SHAFT*  (DUPAGE, KANE, KENDALL, 
LAKE, MCHENRY, AND WILL COUNTIES)   ................$ 63.00                  51.00
----------------------------------------------------------------

 IRON0001-014 06/01/2025
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL AND REINFORCING (DU PAGE 
(EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, 
WOODSTOCK, AND EAST THEREOF) COUNTIES)..............$ 62.46                  46.58
IRONWORKER: SHEETER (DU PAGE (EASTERN 1/4), LAKE, 
AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) 
COUNTIES)...........................................$ 62.71                  46.58
----------------------------------------------------------------

 IRON0063-003 06/01/2025
                                                     Rates                  Fringes
IRONWORKER, ORNAMENTAL (LAKE, DUPAGE (EASTERN 1/4) 
AND  MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) 
COUNTIES)...........................................$ 59.26                  44.81
----------------------------------------------------------------

 IRON0393-003 06/01/2021
                                                     Rates                  Fringes
IRONWORKER (DEKALB (SOUTHEASTERN 2/3 INCLUDING 
SYCAMORE AND DEKALB),  DUPAGE (REMAINDER), KANE, 
KENDALL (NORTHERN PART), AND MCHENRY (SOUTHEAST 
1/4) COUNTIES)......................................$ 48.83                  39.84
----------------------------------------------------------------

 IRON0444-006 06/01/2022
                                                     Rates                  Fringes
IRONWORKER (KENDALL (SOUTHERN PART) AND WILL 
COUNTIES)...........................................$ 47.80                  42.50
----------------------------------------------------------------

 IRON0498-003 06/01/2021
                                                     Rates                  Fringes
IRONWORKER (BOONE, DEKALB (EXCEPT SOUTHEAST), AND 
MCHENRY (NORTHWEST) COUNTIES).......................$ 41.37                  44.41
----------------------------------------------------------------

 LABO0002-004 06/01/2025
                                                     Rates                  Fringes
LABORER, SEWER CONSTRUCTION: GROUP 5 ASBESTOS 
ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE 
REMOVAL LABORERS & DOSIMETER USE (ANY DEVICE) 
MONITORING NUCLEAR EXPOSURE. (DUPAGE COUNTY)........$ 51.40                  36.94
LABORER, SEWER CONSTRUCTION: GROUP 4 BOTTOM MEN; 
BRACERS-BRACING; BRICKLAYER'S TENDER; CATCH BASIN 
DIGGER; DRAINLAYER; DYNAMITER; FORM MEN; 
JACKHAMMERMEN; POWERPAC; PIPELAYERS; RODDERS; 
WELDERS & BURNERS; WELL POINT SYSTEM MEN. (DUPAGE 
COUNTY).............................................$ 51.75                  36.94
LABORER, SEWER CONSTRUCTION: GROUP 3 CEMENT 
CARRIERS; CEMENT MIXERS; CONCRETE REPAIRMEN; MORTAR 
MEN; SCAFFOLD MEN; AND SECOND BOTTOM MEN. (DUPAGE 
COUNTY).............................................$ 51.63                  36.94
LABORER, SEWER CONSTRUCTION: GROUP 2 CONCRETE 
LABORERS; STEEL SETTERS. (DUPAGE COUNTY)............$ 51.53                  36.94
LABORER, SEWER CONSTRUCTION: GROUP 1 SIGNALMEN TOP 
LABORERS, AND ALL OTHER LABORERS NOT MENTIONED. 
(DUPAGE COUNTY).....................................$ 51.40                  36.94
----------------------------------------------------------------

 LABO0002-009 06/01/2025
                                                     Rates                  Fringes
LABORER, TUNNEL: GROUP 5 ASBESTOS ABATEMENT 
LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; 
DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE 
(DUPAGE COUNTY)   ..................................$ 51.40                  36.94
LABORER, TUNNEL: GROUP 4 AIR TRAC DRILL OPERATOR; 
MINER; BRICKLAYER TENDERS; CONCRETE BLOWER 
OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; 
FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE 
OPERATORS; MUCKING MACHINE OPERATOR; LASER BEAM 
OPERATOR; LINER PLATE AND RING SETTERS; SHIELD 
DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS; 
PIPE JACKING MACHINE OPERATOR; SKINNERS; 
MAINTENANCE TECHNICIAN (DUPAGE COUNTY)..............$ 51.75                  36.94
LABORER, TUNNEL: GROUP 3 CONCRETE REPAIRMEN; LOCK 
TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT 
MACHINE OPERATORS; TRACK LAYERS (DUPAGE COUNTY).....$ 51.63                  36.94
LABORER, TUNNEL: GROUP 2 AIR HOIST OPERATOR; KEY 
BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK 
TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS; 
SWITCHMEN; CAR PUSHER (DUPAGE COUNTY)...............$ 51.53                  36.94
LABORER, TUNNEL: GROUP 1 CAGE TENDERS; DUMPMEN; 
FLAGMEN; SIGNALMEN; TOP LABORERS (DUPAGE COUNTY)....$ 51.40                  36.94
LABORER, COMPRESSED AIR: 34 LBS AND OVER (DU PAGE 
COUNTY).............................................$ 55.40                  36.94
LABORER, COMPRESSED AIR, 27-33 lbs (DU PAGE COUNTY).$ 54.40                  36.94
LABORER, COMPRESSED AIR, 21-26 lbs (DU PAGE COUNTY).$ 53.40                  36.94
LABORER, COMPRESSED AIR, 16-20 lbs (DU PAGE COUNTY).$ 52.90                  36.94
LABORER, COMPRESSED AIR, 0-15 lbs (DU PAGE COUNTY)..$ 52.40                  36.94
----------------------------------------------------------------

 LABO0032-007 05/01/2025
                                                     Rates                  Fringes
LABORER: SKILLED LABORER   SKILLED LABORER: 
ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER 
HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER 
HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT 
HANDLER, CHLORIDE HANDLER, UNLOADING & LABORERS 
WITH STEEL WORKERS & RE-BARS, WET CONCRETE WORKERS, 
TUNNEL TENDERS IN FREE AIR, BATCH DUMPER, MASON 
TENDER, KETTLE & TAR MAN, TANK CLEANER, PLASTIC 
INSTALLER, SCAFFOLD WORKER, MOTORIZED BUGGIES OR 
MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF 
BUILDING MATERIALS, LABORERS WITH DE-WATERING 
SYSTEMS, SEWER WORKERS PLUS DEPTH, VIBRATOR 
OPERATOR; CEMENT SILICA, CLAY, FLY ASH, LIME & 
PLASTERS HANDLERS (BULK OR BAG); COFFERDAM WORKER 
PLUS DEPTH, CONCRETE PAVING, PLACING, CUTTING & 
TYING OF REINFORCING, DECK HAND, DREDGE HAND AND 
SHORE LABORER, BANKMAN ON FLOATING PLANT, GRADE 
CHECKER, POWER TOOLS, FRONT END MAN ON CHIP 
SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITE 
NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER, 
BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & 
DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL 
FORM SETTER - STREET & HIGHWAY, AIR TAMPING 
HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW 
OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING 
MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS 
ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE 
DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER CURB ASPHALT 
MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT 
PORTABLE OR TEMPORART PLANT, LABORER HANDLING 
MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM 
OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING 
MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING & 
SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH 
BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE 
PUMP.  (DE KALB COUNTY).............................$ 50.39                  36.31
LABORER: GENERAL LABORER   GENERAL LABORER: 
CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR 
SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN 
& SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING 
LABORER, CLEANING LUMBER, PIT MAN, MATERIAL 
CHECKER, LANDSCAPER, UNLOADING EXPLOSIVES, LAYING 
OF SOD, PLANTING OF TREES, ASPHALT WORKERS WITH 
MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING, 
FIRE-PROOFING, DRIVING STAKES, STRINGLINES FOR ALL 
MACHINERY, WINDOW CLEANING, DEMOLITION WORKER, 
EXPLOSIVE HANDLING, TRIMMING & REMOVAL OF TREES, 
MULTI-PLATE PIPE, PILOT CARS FOR TRAFFIC CONTROL, 
POWER RIGGING     (DE KALB COUNTY)..................$ 47.04                  36.31
----------------------------------------------------------------

 LABO0075-002 06/01/2025
                                                     Rates                  Fringes
LABORER GROUP 7 DOSIMETER (ANY DEVICE) USED FOR 
MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT 
WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; 
AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL 
50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH 
(WILL COUNTY).......................................$ 51.60                  36.94
LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; 
CAISSON LABORERS 50 FEET OR MORE BELOW GROUND 
LEVEL; LABORERS WORKING UNDER RADIO ACTIVE 
CONDITIONS (SUITING UP); BLASTING MEN (POWDERMEN) 
(WILL COUNTY).......................................$ 51.75                  36.94
LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON 
LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND 
OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50 
FEET; AND ALL LABORERS WORKING INSIDE OF A SPHERE 
OR ANY TYPE OF TANK FOR EVERY ADDITIONAL 50 FEET OR 
PART THEREOF ABOVE 100 FEET IN HEIGHT (WILL COUNTY).$ 51.60                  36.94
LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS 
INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN 
(BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE 
(THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL 
BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN 
PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE 
OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE 
BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH 
LABORERS 8 FEET OR MORE BELOW GROUND LEVEL 
REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK 
INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL 
STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND 
LEVEL DOWN 15 FEET; ALL AIR TOOLS 8 FEET OR MORE 
BELOW GROUND LEVEL; ALL LABORERS WORKING ON 
SWINGING-SUSPENDED OR ANY TYPE OR MAKE OF 
SCAFFOLDS, 48 FEET TO 100 FEET; ALL CHIMNEY AND 
SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100 
FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL 
LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR 
MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET; 
ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER 
TYPE 8 FEET OR MORE BELOW GROUND LEVEL; 
VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND 
LEVEL    (WILL COUNTY)..............................$ 51.75                  36.94
LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS; 
PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR 
SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT 
RUNAWAYS, AND RADII (ANY TYPE OF FORM) STRINGLINE 
MEN FOR ALL AFOREMENTIONED WORK; WAGON AND TOWER 
DRILLERS ON LAND AND FLOATING PLANT USED ON 
DREDGING; ASPHALT GUNNERS AND PLUG MEN 
(UNDERCOATING ON ROAD WORK); MORTAR PUMP LABORERS; 
PLASTER PUMP LABORERS (WILL COUNTY).................$ 51.40                  36.94
LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND 
MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE 
USED, ON PUBLIC UTILITY WORK (GROUND LEVEL TO 8 
FEET); PUMPCRETE PIPE HANDLERS  (WILL COUNTY).......$ 51.75                  36.94
LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT 
SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK (GROUND 
LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE 
DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND 
MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH 
DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS; 
SAND AND STONE WHEELERS TO MIXER HANDLERS); 
CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & 
PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN; 
CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER; 
CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; 
MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN 
& TARMEN, TANK CLEANERS; SCAFFOLD AND STAGING 
LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR 
ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS 
SHALL BE TENDED BY LABORERS IF THE EMPLOYER 
DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING 
OF SLAB STEEL ROAD FORMS IN ANY MANNER, EXCEPT ROAD 
FORM SETTING, SETTING CENTER STRIPS, CONTRACTION 
AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND 
HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST 
IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER 
AND DRAIN TILE, RAILROAD TILES AND ALL OTHER 
CREOSOTED MATERIALS; PAVING BLOCKS AND CONCRETE 
FORMS; HANDLING OF INSULATION OF ANY TYPE; ALL WORK 
INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR 
FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR 
AND COMPOSITION MIXERS OF SEWER WORK; TRACK 
LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A 
HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON 
SWINGING SUSPENDED, OR ANY TYPE OR MAKE OF 
SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING 
INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; 
WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK 
FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS 
(ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR 
CONCRETE OR MASONS EMPLOYERS; USE OF SKID STEER 
LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE 
WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE 
DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC 
UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN; 
SNAPPING OF WALL TIES AND REMOVAL OF RODS; DRILLING 
OF ANCHOR BOLT HOLES; CONCRETE OR ASPHALT CLIPPER 
TYPE SAWS AND SELF-PROPELLED SAWS; SHOULDER AND 
GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR 
ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING; 
CLEANING LUMBER, NAIL PULLING, DECK HAND; 
DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING 
PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND 
FLAGMEN ON ALL CONSTRUCTION WORK; CLEANING OF 
DEBRIS; REMOVAL OF TREES; CONCRETE CURING, 
TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER 
OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL; 
WRECKING AND DEMOLITION LABORERS  (WILL COUNTY).....$ 51.40                  36.94
----------------------------------------------------------------

 LABO0149-002 06/01/2025
                                                     Rates                  Fringes
LABORER GROUP 9 ASBESTOS APATEMENT LABORERS, TOXIC 
& HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER (ANY 
DEVICE) MONITORING NUCLEAR EXPOSURE (BOONE, KANE, 
KENDALL, AND MCHENRY COUNTIES)......................$ 52.40                  36.94
LABORER GROUP 8 FLAGMAN (BOONE, KANE, KENDALL, AND 
MCHENRY COUNTIES)...................................$ 51.40                  36.94
LABORER GROUP 7 CAISSON DIGGERS, DYNAMITERS (BOONE, 
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.75                  36.94
LABORER GROUP 6 TUNNEL LABORERS, TILE LAYERS & 
BOTTOM MEN (BOONE, KANE, KENDALL, AND MCHENRY 
COUNTIES)...........................................$ 51.75                  36.94
LABORER GROUP 5 CHAIN SAW MAN, JACKHAMMER MAN, 
DRILLMAN, CONCRETE BREADERS & AIR SPADE  (BOONE, 
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.63                  36.94
LABORER GROUP 4 STRINGLINE & FORM SETTER; TORCHMAN 
(DEMOLITION), SHEETING & CRIBBING, BLACK TOP RAKERS 
& LUTEMEN, MACHINE SCREWMEN (BOONE, KANE, KENDALL, 
AND MCHENRY COUNTIES)...............................$ 51.68                  36.94
LABORER GROUP 3 MORTAR & CONCRETE MIXERS (BOONE, 
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.68                  36.94
LABORER GROUP 2 AIR TAMPERS & VIBRATORS (BOONE, 
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.68                  36.94
LABORER GROUP 1 COMMON LABORER, ASPHALT LABORER, 
ASPHALT PLANT LABORER, STRIPING LABORER, CLIPPER 
TYPE CONCRETE SAW, SELF-PROPELLED SAWS (BOONE, 
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.40                  36.94
----------------------------------------------------------------

 LABO0152-003 06/01/2025
                                                     Rates                  Fringes
LABORER GROUP 6 ASBESTOS ABATEMENT LABORERS; TOXIC 
AND HAZARDOUS WASTE REMOVAL LABORERS; DOSIMETER 
(ANY DEVICE MONITORING NUCLEAR EXPOSURE) (LAKE 
COUNTY).............................................$ 51.60                  36.94
LABORER GROUP 5 CEMENT GUN NOZZLE (GUNITE) (LAKE 
COUNTY).............................................$ 51.60                  36.94
LABORER GROUP 4 RAKERS AND LUTEMEN; MACHINE 
SCREWMAN; KETTLEMEN; MIXERMEN, DRUM-MEN; 
JACKHAMMERMEN (ASPHALT); MITE BOX SPREADERS; 
LABORERS ON BIRCH OVERMAN AND SIMILAR SPREADER 
EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR 
COMPRESSORS; PAVING FORM SETTERS; JACKHAMMERMAN 
(CONCRETE); POWER DRIVE CONCRETE SAWS (LAKE COUNTY).$ 51.63                  36.94
LABORER GROUP 3 ASPHALT TAMPERS AND SMOOTHERS (LAKE 
COUNTY).............................................$ 51.40                  36.94
LABORER GROUP 2 CEMENT GUN LABORERS (LAKE COUNTY)...$ 51.48                  36.94
LABORER GROUP 1 GENERAL LABORERS; ASPHALT (LAKE 
COUNTY).............................................$ 51.40                  36.94
----------------------------------------------------------------

 PAIN0014-003 06/01/2024
                                                     Rates                  Fringes
PAINTER:  BRUSH ONLY (LAKE AND WILL COUNTIES).......$ 53.05                  33.91
----------------------------------------------------------------

 PAIN0030-001 06/01/2024
                                                     Rates                  Fringes
PAINTER: BRUSH, DRYWALL TAPER/FINISHER, 
SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE, 
KENDALL AND MCHENRY COUNTIES).......................$ 53.05                  27.63
----------------------------------------------------------------

 PAIN0030-004 06/01/2024
                                                     Rates                  Fringes
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, 
PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY 
STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, 
STEPHENSON AND WINNEBAGO COUNTIES)..................$ 45.15                  29.41
----------------------------------------------------------------

 PLAS0011-002 06/01/2023
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (WILL COUNTY)........$ 46.25                  45.10
----------------------------------------------------------------

 PLAS0011-008 06/01/2023
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (DE KALB, KANE, 
KENDALL, AND MCHENRY COUNTIES)......................$ 50.70                  40.60
----------------------------------------------------------------

 PLAS0011-013 06/01/2023
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (LAKE COUNTY)........$ 48.50                  42.82
----------------------------------------------------------------

 PLAS0011-015 06/01/2023
                                                     Rates                  Fringes
PLASTERER (BOONE COUNTY)............................$ 37.90                  37.66
CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY).......$ 41.03                  36.39
----------------------------------------------------------------

 PLAS0803-001 08/01/2010
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (DUPAGE COUNTY)......$ 38.00                  24.03
----------------------------------------------------------------

 TEAM0179-002 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: 6 AXLE TRUCKS   (KENDALL AND WILL 
COUNTIES)    FOOTNOTES:    A.HEALTH AND WELFARE 
$448.80 PER WEEK; PENSION $562.80 PER WEEK.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.67                  0.30
TRUCK DRIVER: 5 AXLE TRUCKS   (KENDALL AND WILL 
COUNTIES)    FOOTNOTES:    A.HEALTH AND WELFARE 
$448.80 PER WEEK; PENSION $562.80 PER WEEK.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.47                  0.30
TRUCK DRIVER: 4 AXLE TRUCKS   (KENDALL AND WILL 
COUNTIES)    FOOTNOTES:    A.HEALTH AND WELFARE 
$448.80 PER WEEK; PENSION $562.80 PER WEEK.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.27                  0.30
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (KENDALL AND WILL 
COUNTIES)    FOOTNOTES:    A.HEALTH AND WELFARE 
$448.80 PER WEEK; PENSION $562.80 PER WEEK.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.12                  0.30
----------------------------------------------------------------

 TEAM0301-001 06/01/2024
                                                     Rates                  Fringes
TRUCK DRIVER: 6 AXLES (LAKE AND MCHENRY COUNTIES)   
 FOOTNOTES:    A.$500.00 PER WEEK PENSION.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 45.09                  13.40
TRUCK DRIVER: 5 AXLES (LAKE AND MCHENRY COUNTIES)   
 FOOTNOTES:    A.$500.00 PER WEEK PENSION.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 44.89                  13.40
TRUCK DRIVER: 4 AXLES (LAKE AND MCHENRY COUNTIES)   
 FOOTNOTES:    A.$500.00 PER WEEK PENSION.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 44.69                  13.40
TRUCK DRIVER: 2-3 AXLES (LAKE AND MCHENRY COUNTIES) 
   FOOTNOTES:    A.$500.00 PER WEEK PENSION.  B. 
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 44.54                  13.40
----------------------------------------------------------------

 TEAM0325-004 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: 6 AXLES (BOONE AND WINNEBAGO 
COUNTIES)    FOOTNOTE:  AN ADDITIONAL $.20 PER AXLE 
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX 
(6) AXLES...........................................$ 48.93                  26.70
TRUCK DRIVER: 5 AXLES (BOONE AND WINNEBAGO 
COUNTIES)    FOOTNOTE:  AN ADDITIONAL $.20 PER AXLE 
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX 
(6) AXLES...........................................$ 48.82                  26.70
TRUCK DRIVER: 4 AXLES (BOONE AND WINNEBAGO 
COUNTIES)    FOOTNOTE:  AN ADDITIONAL $.20 PER AXLE 
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX 
(6) AXLES...........................................$ 48.62                  26.70
TRUCK DRIVER: 2 - 3 AXLES (BOONE AND WINNEBAGO 
COUNTIES)    FOOTNOTE:  AN ADDITIONAL $.20 PER AXLE 
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX 
(6) AXLES...........................................$ 48.47                  26.70
----------------------------------------------------------------

 TEAM0330-002 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: 6 AXLES   (DEKALB COUNTY)    
FOOTNOTE:  A.HEALTH AND WELFARE $468.00  PER 
WEEK;PENSION $644.34 PER WEEK    LOW BOY 
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 45.38                  0.30
TRUCK DRIVER: 5 AXLES   (DEKALB COUNTY)    
FOOTNOTE:  A.HEALTH AND WELFARE $468.00  PER 
WEEK;PENSION $644.34 PER WEEK    LOW BOY 
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 45.18                  0.30
TRUCK DRIVER: 4 AXLES   (DEKALB COUNTY)    
FOOTNOTE:  A.HEALTH AND WELFARE $468.00  PER 
WEEK;PENSION $644.34 PER WEEK    LOW BOY 
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 44.98                  0.30
TRUCK DRIVER: 2-3 AXLES   (DEKALB COUNTY)    
FOOTNOTE:  A.HEALTH AND WELFARE $468.00  PER 
WEEK;PENSION $644.34 PER WEEK    LOW BOY 
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR  AN 
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL 
VEHICLES WITH MORE THAN SIX (6) AXLES.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.     900 STRAIGHT TIME HOURS OR MORE 
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL 
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS 
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 
YEARS - 4 WEEKS PAID VACATION.......................$ 44.83                  0.30
----------------------------------------------------------------

 TEAM0673-003 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: 6 AXLES (DU PAGE AND KANE COUNTIES)   
 FOOTNOTE:  A.   AN ADDITIONAL $.20 PER AXLE SHALL 
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) 
AXLES.  LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR  
HEALTH AND WELFARE: $453.20 PER WEEK  PENSON: 
$589.90 PER WEEK  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.     900 
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR 
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID 
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS 
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID 
VACATION............................................$ 45.86                  0.30
TRUCK DRIVER: 5 AXLES (DU PAGE AND KANE COUNTIES)   
 FOOTNOTE:  A.   AN ADDITIONAL $.20 PER AXLE SHALL 
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) 
AXLES.  LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR  
HEALTH AND WELFARE: $453.20 PER WEEK  PENSON: 
$589.90 PER WEEK  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.     900 
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR 
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID 
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS 
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID 
VACATION............................................$ 45.66                  0.30
TRUCK DRIVER: 4 AXLES (DU PAGE AND KANE COUNTIES)   
 FOOTNOTE:  A.   AN ADDITIONAL $.20 PER AXLE SHALL 
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) 
AXLES.  LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR  
HEALTH AND WELFARE: $453.20 PER WEEK  PENSON: 
$589.90 PER WEEK  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.     900 
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR 
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID 
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS 
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID 
VACATION............................................$ 45.46                  0.30
TRUCK DRIVER: 2-3 AXLES (DU PAGE AND KANE COUNTIES) 
   FOOTNOTE:  A.   AN ADDITIONAL $.20 PER AXLE 
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX 
(6) AXLES.  LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR 
 HEALTH AND WELFARE: $453.20 PER WEEK  PENSON: 
$589.90 PER WEEK  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.     900 
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR 
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID 
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS 
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID 
VACATION............................................$ 45.31                  0.30
----------------------------------------------------------------

 TEAM0731-002 04/01/2025
                                                     Rates                  Fringes
TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY 
WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED 
TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC 
CONTROL DEVICES, THE SET-UP AND INSTALLATION OF 
TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH 
BARRELS AND GLARE SCREENS, TRAFFIC CONTROL 
SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, 
CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND 
SIGN FABRICATION EQUIPMENT).........................$ 43.40                  22.71
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/

Source: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.