11 Counties in New Jersey Davis-Bacon Wage Rates: Highway
Updated
Federal prevailing wage rates (Davis-Bacon) for highway construction in 11 Counties in New Jersey: 7 classifications, base rates from $34.05 to $59.29 an hour plus fringe benefits. General decision NJ20260002, modification 2, published May 18, 2026.
| Type | Davis-Bacon (construction) |
|---|---|
| Number | NJ20260002 |
| Modification | 2 |
| Published | May 18, 2026 |
| State | New Jersey |
| Area | New Jersey Counties of Bergen, Essex, Hudson, Hunterdon, Middlesex, Morris, Passaic, Somerset, Sussex, Union and Warren |
| Construction type | Highway |
Wage rates and fringe benefits (7)
| Classification | Base rate | Fringe | Total | New Jersey median |
|---|---|---|---|---|
| Carpenter | $57.42 | $34.02 | $91.44 | |
| Ironworkers (Warren County) | $34.05 | $24.00 | $58.05 | |
| Painters: Work on Bridges (All Bridges That Span Major Waterways, Railroad Bridges, Bridges over Canyons, Overpasses) | $59.29 | $33.56 | $92.85 | |
| Painters: (All Other Work) Brush and Roller | $45.55 | $29.86 | $75.41 | |
| Painters: (All Other Work) Spray | $45.55 | $29.86 | $75.41 | |
| Cement Mason (Hunterdon, Middlesex, Somerset and Union Counties) | $53.21 | $33.42 | $86.63 | |
| Truck Drivers: Group 1 Winch Trailer Driver (Essex, Morris, Sussex and Union Counties) | $46.61 | $31.82 | $78.43 |
The median is the middle rate for the same work across New Jersey's highway wage determinations in force today, shown when at least three have it.
How to use these rates
On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.
Other Davis-Bacon highway wage determinations in New Jersey
- 10 Counties in New Jersey NJ20260001
All New Jersey prevailing wage rates · Open federal bids in New Jersey
Full text of NJ20260002
Show the official text (105,502 characters)
General Decision Number: NJ20260002 05/18/2026
State: New Jersey
Construction Types: Highway
Counties: New Jersey Counties of
Bergen, Essex, Hudson, Hunterdon,
Middlesex, Morris, Passaic, Somerset,
Sussex, Union and Warren
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
BRNJ0002-005 05/01/2025
Rates Fringes
BRICKLAYER (BERGEN, ESSEX AND HUDSON COUNTIES;
HUNTERDON COUNTY (NORTH AND WEST OF A LINE DRAWN
FROM CLOVER HILL, THROUGH REAVILLE, THROUGH
FLEMINGTON, THROUGH HIGH BRIDGE, THROUGH CALIFON,
THROUGH FAIRMONT, TO POTTERSVILLE); MIDDLESEX
COUNTY (BOROUGH OF DUNELLEN; TOWNSHIP OF EDISON
(TOWN OF OAK TREE ONLY); TOWNSHIP OF PISCATAWAY
(TOWN OF NEW MARKET ONLY); BOROUGH OF SOUTH
PLAINFIELD); MORRIS AND PASSAIC COUNTIES; SOMERSET
COUNTY (NORTH OF A LINE DRAWN FROM THE POINT WHERE
THE LAMINGTON RIVER leaves the boundary line
between Hunterdon and Somerset Counties; then,
continuing along the Lamington River to where it
becomes the North Branch of the Raritan River;
then, continuing along the North Branch of the
Raritan River to where it becomes Chambers Brook;
then, continuing along Chambers Brook until it
becomes the boundary line between the Townships of
Bernards and Bridgewater; then, continuing along
the boundary line between the Townships of Bernards
and Bridgewater, until that boundary line
intersects with Route 78; then, continuing along
Route 78 until Route 78 intersects with Route 525;
then, continuing along Route 525 until Route 525
intersects with the boundary line between the
Townships of Bridgewater and Warren; then,
continuing along the boundary line between the
Townships of Bridgewater and Warren until that
boundary line intersects with Route 22; then,
following Route 22 until Route 22 intersects with
Sebrings Mills Rd. (also known as King George Rd.);
then, continuing south on Sebrings Mills Rd. until
it goes over Green Brook, which is the Middlesex
County line); SUSSEX, UNION AND WARREN
Work 100 degrees F. and over: to be paid at the
rate of double
Work on high stacks: 22% per hour additional........$ 49.60 37.96
----------------------------------------------------------------
BRNJ0002-006 11/01/2019
Rates Fringes
BRICKLAYER (HUNTERDON COUNTY (south and east of a
line drawn from Clover Hill, through Reaville,
through Flemington, through High Bridge, through
Califon, through Fairmont, to Pottersville);
MIDDLESEX COUNTY (does not include the Borough of
Dunellen; Township of Edison (Town of Oak Tree);
Township of Piscataway (Town of New Market);
Borough of South Plainfield); SOMERSET COUNTY
(south of a line drawn from the point where the
Lamington River leaves the boundary line between
Hunterdon and Somerset Counties; then, continuing
along the Lamington River to where it becomes the
North Branch of the Raritan River; then, continuing
along the North Branch of the Raritan River to
where it becomes Chambers Brook; then, continuing
along Chambers Brook until it becomes the boundary
line between the Townships of Bernards and
Bridgewater; then, continuing along the boundary
line between the Townships of Bernards and
Bridgewater, until that boundary line intersects
with Route 78; then, continuing along Route 78
until Route 78 intersects with Route 525; then,
continuing along Route 525 until Route 525
intersects with the boundary line between the
Townships of Bridgewater and Warren; then,
continuing along the boundary line between the
Townships of Bridgewater and Warren until that
boundary line intersects with Route 22; then,
continuing along Route 22 until Route 22 intersects
with Sebrings Mills Rd. (also known as King George
Rd.); then, continuing south along Sebrings Mills
Rd. until it goes over Green Brook, which is the
Middlesex County
Work 100 degrees F. and over: to be paid at the
rate of double
Work on high stacks: 22% per hour additional........$ 43.56 32.50
----------------------------------------------------------------
BRNJ0002-008 05/01/2025
Rates Fringes
CEMENT MASON (BERGEN, ESSEX AND HUDSON COUNTIES;
HUNTERDON COUNTY (north and west of a line drawn
from Clover Hill, through Reaville, through
Flemington, through High Bridge, through Califon,
through Fairmont, to Pottersville); MIDDLESEX
COUNTY (Borough of Dunellen; Township of Edison
(Town of Oak Tree only); Township of Piscataway
(Town of New Market only); Borough of South
Plainfield); MORRIS AND PASSAIC COUNTIES; SOMERSET
COUNTY (north of a line drawn from the point where
the Lamington River leaves the boundary line
between Hunterdon and Somerset Counties; then,
continuing along the Lamington River to where it
becomes the North Branch of the Raritan River;
then, continuing along the North Branch of the
Raritan River to where it becomes Chambers Brook;
then, continuing along Chambers Brook until it
becomes the boundary line between the Townshipsbof
Bernards and Bridgewater; then, continuing along
the boundary line between the Townships of Bernards
and Bridgewater, until that boundary line
intersects with Route 78; then, continuing along
Route 78 until Route 78 intersects with Route 525;
then, continuing along Route 525 until Route 525
intersects with the boundary line between the
Townships of Bridgewater and Warren; then,
continuing along the boundary line between the
Townships of Bridgewater and Warren until that
boundary line intersects with Route 2; then,
continuing along Route 22 until Route 22 intersects
with Sebrings Mills Rd. (also known as King George
Rd.); then, continuing south on Sebrings Mills Rd.
until it goes over Green Brook, which is the
Middlesex County line); SUSSEX, UNION AND WARREN
Cement mason: Epoxy, acid and latex work: $.50 per
hour additional.....................................$ 49.60 37.96
----------------------------------------------------------------
BRNJ0002-009 11/01/2019
Rates Fringes
CEMENT MASON (HUNTERDON COUNTY (south and east of a
line drawn from Clover Hill, through Reaville,
through Flemington, through High Bridge, through
Califon, through Fairmont, to Pottersville);
MIDDLESEX COUNTY (does not include the Borough of
Dunellen; Township of Edison (Town of Oak Tree);
Township of Piscataway (Town of New Market);
Borough of South Plainfield); SOMERSET COUNTY
(south of a line drawn from the point where the
Lamington River leaves the boundary line between
Hunterdon and Somerset Counties; then, continuing
along the Lamington River to where it becomes the
North Branch of the Raritan River; then, continuing
along the North Branch of the Raritan River to
where it becomes Chambers Brook; then, continuing
along Chambers Brook until it becomes the boundary
line between the Townships of Bernards and
Bridgewater; then, continuing along the boundary
line between the Townships of Bernards and
Bridgewater, until that boundary line intersects
with Route 78; then, continuing along Route 78
until Route 78 intersects with Route 525; then,
continuing along Route 525 until Route 525
intersects with the boundary line between the
Townships of Bridgewater and Warren; then,
continuing along the boundary line between the
Townships of Bridgewater and Warren until that
boundary line intersects with Route 22; then,
continuing along Route 22 until Route 22 intersects
with Sebrings Mills Rd. (also known as King George
Rd.); then, continuing south along Sebrings Mills
Rd. until it goes over Green Brook, which is the
Middlesex County
Cement mason: Epoxy, acid and latex work: $.50 per
hour additional.....................................$ 43.56 32.50
----------------------------------------------------------------
CARP0006-008 05/01/2025
Rates Fringes
CARPENTER...........................................$ 57.42 34.02
----------------------------------------------------------------
CARP1556-001 05/01/2024
Rates Fringes
DOCK BUILDER & PILEDRIVERMEN WORK ON LAND PILE
DRIVING, WHILE HANDLING AND WORKING WITH CREOSOTE
AND CREOSOTE-IMPREGNATED PRODUCTS: $.25 PER HOUR
ADDITIONAL. Work on hazardous/toxic/contaminated
waste removal, on a hazardous/toxic/contaminated
waste site, where the worker comes into contact
with hazardous/toxic/contaminated waste material,
and when A, B or C personal protective equipme is
required and used for respiratory, skin or eye
protection: 20% per hour additional.................$ 52.98 52.44
----------------------------------------------------------------
ELEC0102-001 06/03/2024
Rates Fringes
LINE CONSTRUCTION: ALL OTHER WORK: GROUNDMAN.
HUNTERDON COUNTY (Townships of Alexandria and
Bethlehem; Boroughs of Bloomsbury and Califon; Town
of Clinton; Township of Clinton; Township of
Delaware (west of a line following county Route 523
from the Delaware River north to the Raritan
Township line); Township of East Amwell (east of
State Hwy. 31); Township of Franklin; Boroughs of
Frenchtown, Glen Gardner, Hampton and High Bridge;
Townships of Holland and Kingwood; Borough of
Lebanon; Township of Lebanon; Borough of Milford;
Township of Raritan (east of State Hwy. 31 and
north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 38.21 23.98
LINE CONSTRUCTION: ALL OTHER WORK: LINE TECHNICIAN;
EQUIPMENT OPERATOR. HUNTERDON COUNTY (Townships of
Alexandria and Bethlehem; Boroughs of Bloomsbury
and Califon; Town of Clinton; Township of Clinton;
Township of Delaware (west of a line following
county Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(east of State Hwy. 31); Township of Franklin;
Boroughs of Frenchtown, Glen Gardner, Hampton and
High Bridge; Townships of Holland and Kingwood;
Borough of Lebanon; Township of Lebanon; Borough of
Milford; Township of Raritan (east of State Hwy. 31
and north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 65.43 42.20
LINE CONSTRUCTION: ALL OTHER WORK: LINE
TECHNICIAN-WELDER. HUNTERDON COUNTY (Townships of
Alexandria and Bethlehem; Boroughs of Bloomsbury
and Califon; Town of Clinton; Township of Clinton;
Township of Delaware (west of a line following
county Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(east of State Hwy. 31); Township of Franklin;
Boroughs of Frenchtown, Glen Gardner, Hampton and
High Bridge; Townships of Holland and Kingwood;
Borough of Lebanon; Township of Lebanon; Borough of
Milford; Township of Raritan (east of State Hwy. 31
and north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 66.86 41.95
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) CABLE SPLICER. HUNTERDON COUNTY
(Townships of Alexandria and Bethlehem; Boroughs of
Bloomsbury and Califon; Town of Clinton; Township
of Clinton; Township of Delaware (west of a line
following county Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (east of State Hwy. 31); Township of
Franklin; Boroughs of Frenchtown, Glen Gardner,
Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon;
Borough of Milford; Township of Raritan (east of
State Hwy. 31 and north of County Route 523);
Townships of Readington, Tewksbury and Union);
MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does
not include the Township of Franklin east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line; does not include the Township of
Montgomery west and south of a line following U.S.
Hwy. 206 (formerly State Hwy. 31) north from the
Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 61.82 34.46
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) GROUNDMAN. HUNTERDON COUNTY
(Townships of Alexandria and Bethlehem; Boroughs of
Bloomsbury and Califon; Town of Clinton; Township
of Clinton; Township of Delaware (west of a line
following county Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (east of State Hwy. 31); Township of
Franklin; Boroughs of Frenchtown, Glen Gardner,
Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon;
Borough of Milford; Township of Raritan (east of
State Hwy. 31 and north of County Route 523);
Townships of Readington, Tewksbury and Union);
MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does
not include the Township of Franklin east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line; does not include the Township of
Montgomery west and south of a line following U.S.
Hwy. 206 (formerly State Hwy. 31) north from the
Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 38.21 18.80
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) GROUND PERSON. HUNTERDON COUNTY
(Townships of Alexandria and Bethlehem; Boroughs of
Bloomsbury and Califon; Town of Clinton; Township
of Clinton; Township of Delaware (west of a line
following county Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (east of State Hwy. 31); Township of
Franklin; Boroughs of Frenchtown, Glen Gardner,
Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon;
Borough of Milford; Township of Raritan (east of
State Hwy. 31 and north of County Route 523);
Townships of Readington, Tewksbury and Union);
MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does
not include the Township of Franklin east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line; does not include the Township of
Montgomery west and south of a line following U.S.
Hwy. 206 (formerly State Hwy. 31) north from the
Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 65.43 42.20
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) LINE TECHNICIAN; EQUIPMENT OPERATOR;
X-RAY TECHNICIAN; EQUIPMENT REPAIR PERSON;
EQUIPMENT SERVICE PERSON; HOLE-DIGGING EQUIPMENT
OPERATOR; TRUCK WITH WINCH OR POLE AND STEEL HAND;
TRUCK WITHOUT WINCH HUNTERDON COUNTY (Townships of
Alexandria and Bethlehem; Boroughs of Bloomsbury
and Califon; Town of Clinton; Township of Clinton;
Township of Delaware (west of a line following
county Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(east of State Hwy. 31); Township of Franklin;
Boroughs of Frenchtown, Glen Gardner, Hampton and
High Bridge; Townships of Holland and Kingwood;
Borough of Lebanon; Township of Lebanon; Borough of
Milford; Township of Raritan (east of State Hwy. 31
and north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 56.20 31.33
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) LINE TECHNICIAN-WELDER. HUNTERDON
COUNTY (Townships of Alexandria and Bethlehem;
Boroughs of Bloomsbury and Califon; Town of
Clinton; Township of Clinton; Township of Delaware
(west of a line following county Route 523 from the
Delaware River north to the Raritan Township line);
Township of East Amwell (east of State Hwy. 31);
Township of Franklin; Boroughs of Frenchtown, Glen
Gardner, Hampton and High Bridge; Townships of
Holland and Kingwood; Borough of Lebanon; Township
of Lebanon; Borough of Milford; Township of Raritan
(east of State Hwy. 31 and north of County Route
523); Townships of Readington, Tewksbury and
Union); MORRIS AND PASSAIC COUNTIES; SOMERSET
COUNTY (does not include the Township of Franklin
east of a line following Cedar Grove Lane from the
Raritan River, in a southwesterly direction, to the
Millstone Branch of the Pennsylvania Railroad;
then, west along the railroad to the Delaware and
Raritan Canal; then, south along the canal to the
Middlesex County line; does not include the
Township of Montgomery west and south of a line
following U.S. Hwy. 206 (formerly State Hwy. 31)
north from the Mercer County line to Harlingen Rd.;
then, west along Harlingen Rd. and the
Dutchtown-Zion road to the Hillsborough township
line); SUSSEX, UNION AND WARREN COUNTIES) Work
with, or the removal of, asbestos materials: 112%
times the journeyman rate...........................$ 59.01 32.90
LINE CONSTRUCTION: ALL OTHER WORK: CABLE SPLICER
HUNTERDON COUNTY (Townships of Alexandria and
Bethlehem; Boroughs of Bloomsbury and Califon; Town
of Clinton; Township of Clinton; Township of
Delaware (west of a line following county Route 523
from the Delaware River north to the Raritan
Township line); Township of East Amwell (east of
State Hwy. 31); Township of Franklin; Boroughs of
Frenchtown, Glen Gardner, Hampton and High Bridge;
Townships of Holland and Kingwood; Borough of
Lebanon; Township of Lebanon; Borough of Milford;
Township of Raritan (east of State Hwy. 31 and
north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 71.97 46.42
----------------------------------------------------------------
ELEC0102-001 06/02/2025
Rates Fringes
LINE CONSTRUCTION: ALL OTHER WORK: GROUNDMAN.
HUNTERDON COUNTY (Townships of Alexandria and
Bethlehem; Boroughs of Bloomsbury and Califon; Town
of Clinton; Township of Clinton; Township of
Delaware (west of a line following county Route 523
from the Delaware River north to the Raritan
Township line); Township of East Amwell (east of
State Hwy. 31); Township of Franklin; Boroughs of
Frenchtown, Glen Gardner, Hampton and High Bridge;
Townships of Holland and Kingwood; Borough of
Lebanon; Township of Lebanon; Borough of Milford;
Township of Raritan (east of State Hwy. 31 and
north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 38.21 23.98
LINE CONSTRUCTION: ALL OTHER WORK: LINE TECHNICIAN;
EQUIPMENT OPERATOR. HUNTERDON COUNTY (Townships of
Alexandria and Bethlehem; Boroughs of Bloomsbury
and Califon; Town of Clinton; Township of Clinton;
Township of Delaware (west of a line following
county Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(east of State Hwy. 31); Township of Franklin;
Boroughs of Frenchtown, Glen Gardner, Hampton and
High Bridge; Townships of Holland and Kingwood;
Borough of Lebanon; Township of Lebanon; Borough of
Milford; Township of Raritan (east of State Hwy. 31
and north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 65.43 42.20
LINE CONSTRUCTION: ALL OTHER WORK: LINE
TECHNICIAN-WELDER. HUNTERDON COUNTY (Townships of
Alexandria and Bethlehem; Boroughs of Bloomsbury
and Califon; Town of Clinton; Township of Clinton;
Township of Delaware (west of a line following
county Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(east of State Hwy. 31); Township of Franklin;
Boroughs of Frenchtown, Glen Gardner, Hampton and
High Bridge; Townships of Holland and Kingwood;
Borough of Lebanon; Township of Lebanon; Borough of
Milford; Township of Raritan (east of State Hwy. 31
and north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 66.86 41.95
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) CABLE SPLICER. HUNTERDON COUNTY
(Townships of Alexandria and Bethlehem; Boroughs of
Bloomsbury and Califon; Town of Clinton; Township
of Clinton; Township of Delaware (west of a line
following county Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (east of State Hwy. 31); Township of
Franklin; Boroughs of Frenchtown, Glen Gardner,
Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon;
Borough of Milford; Township of Raritan (east of
State Hwy. 31 and north of County Route 523);
Townships of Readington, Tewksbury and Union);
MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does
not include the Township of Franklin east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line; does not include the Township of
Montgomery west and south of a line following U.S.
Hwy. 206 (formerly State Hwy. 31) north from the
Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 61.82 34.46
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) GROUNDMAN. HUNTERDON COUNTY
(Townships of Alexandria and Bethlehem; Boroughs of
Bloomsbury and Califon; Town of Clinton; Township
of Clinton; Township of Delaware (west of a line
following county Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (east of State Hwy. 31); Township of
Franklin; Boroughs of Frenchtown, Glen Gardner,
Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon;
Borough of Milford; Township of Raritan (east of
State Hwy. 31 and north of County Route 523);
Townships of Readington, Tewksbury and Union);
MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does
not include the Township of Franklin east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line; does not include the Township of
Montgomery west and south of a line following U.S.
Hwy. 206 (formerly State Hwy. 31) north from the
Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 38.21 18.80
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) GROUND PERSON. HUNTERDON COUNTY
(Townships of Alexandria and Bethlehem; Boroughs of
Bloomsbury and Califon; Town of Clinton; Township
of Clinton; Township of Delaware (west of a line
following county Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (east of State Hwy. 31); Township of
Franklin; Boroughs of Frenchtown, Glen Gardner,
Hampton and High Bridge; Townships of Holland and
Kingwood; Borough of Lebanon; Township of Lebanon;
Borough of Milford; Township of Raritan (east of
State Hwy. 31 and north of County Route 523);
Townships of Readington, Tewksbury and Union);
MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does
not include the Township of Franklin east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line; does not include the Township of
Montgomery west and south of a line following U.S.
Hwy. 206 (formerly State Hwy. 31) north from the
Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 65.43 42.20
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) LINE TECHNICIAN; EQUIPMENT OPERATOR;
X-RAY TECHNICIAN; EQUIPMENT REPAIR PERSON;
EQUIPMENT SERVICE PERSON; HOLE-DIGGING EQUIPMENT
OPERATOR; TRUCK WITH WINCH OR POLE AND STEEL HAND;
TRUCK WITHOUT WINCH HUNTERDON COUNTY (Townships of
Alexandria and Bethlehem; Boroughs of Bloomsbury
and Califon; Town of Clinton; Township of Clinton;
Township of Delaware (west of a line following
county Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(east of State Hwy. 31); Township of Franklin;
Boroughs of Frenchtown, Glen Gardner, Hampton and
High Bridge; Townships of Holland and Kingwood;
Borough of Lebanon; Township of Lebanon; Borough of
Milford; Township of Raritan (east of State Hwy. 31
and north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 56.20 31.33
LINE CONSTRUCTION: (HIGH-TENSION PIPE-TYPE CABLE
INSTALLATION) LINE TECHNICIAN-WELDER. HUNTERDON
COUNTY (Townships of Alexandria and Bethlehem;
Boroughs of Bloomsbury and Califon; Town of
Clinton; Township of Clinton; Township of Delaware
(west of a line following county Route 523 from the
Delaware River north to the Raritan Township line);
Township of East Amwell (east of State Hwy. 31);
Township of Franklin; Boroughs of Frenchtown, Glen
Gardner, Hampton and High Bridge; Townships of
Holland and Kingwood; Borough of Lebanon; Township
of Lebanon; Borough of Milford; Township of Raritan
(east of State Hwy. 31 and north of County Route
523); Townships of Readington, Tewksbury and
Union); MORRIS AND PASSAIC COUNTIES; SOMERSET
COUNTY (does not include the Township of Franklin
east of a line following Cedar Grove Lane from the
Raritan River, in a southwesterly direction, to the
Millstone Branch of the Pennsylvania Railroad;
then, west along the railroad to the Delaware and
Raritan Canal; then, south along the canal to the
Middlesex County line; does not include the
Township of Montgomery west and south of a line
following U.S. Hwy. 206 (formerly State Hwy. 31)
north from the Mercer County line to Harlingen Rd.;
then, west along Harlingen Rd. and the
Dutchtown-Zion road to the Hillsborough township
line); SUSSEX, UNION AND WARREN COUNTIES) Work
with, or the removal of, asbestos materials: 112%
times the journeyman rate...........................$ 59.01 32.90
LINE CONSTRUCTION: ALL OTHER WORK: CABLE SPLICER
HUNTERDON COUNTY (Townships of Alexandria and
Bethlehem; Boroughs of Bloomsbury and Califon; Town
of Clinton; Township of Clinton; Township of
Delaware (west of a line following county Route 523
from the Delaware River north to the Raritan
Township line); Township of East Amwell (east of
State Hwy. 31); Township of Franklin; Boroughs of
Frenchtown, Glen Gardner, Hampton and High Bridge;
Townships of Holland and Kingwood; Borough of
Lebanon; Township of Lebanon; Borough of Milford;
Township of Raritan (east of State Hwy. 31 and
north of County Route 523); Townships of
Readington, Tewksbury and Union); MORRIS AND
PASSAIC COUNTIES; SOMERSET COUNTY (does not include
the Township of Franklin east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County line;
does not include the Township of Montgomery west
and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line); SUSSEX, UNION AND
WARREN COUNTIES) Work with, or the removal of,
asbestos materials: 112% times the journeyman rate..$ 71.97 46.42
----------------------------------------------------------------
ELEC0269-010 01/05/2026
Rates Fringes
ELECTRICIAN HUNTERDON COUNTY (Township of Delaware
(east of a line following County Route 523 from the
Delaware River north to the Raritan Township line);
Township of East Amwell (west of State Hwy. 31);
Borough of Flemington; City of Lambertville;
Township of Raritan (west of State Hwy. 31 and
south of County Route 523); Borough of Stockton;
Township of West Amwell); SOMERSET COUNTY (Township
of Montgomery (west and south of a line following
U.S. Hwy. 206 (formerly State Hwy. 31) north from
the Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line):....................$ 63.82 41.99
----------------------------------------------------------------
ELEC0269-013 10/01/2017
Rates Fringes
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) GROUND PERSON; TRUCK WITH WINCH
OPERATOR. HUNTERDON COUNTY (Township of Delaware
(east of a line following County Route 523 from the
Delaware River north to the Raritan Township line);
Township of East Amwell (west of State Hwy. 31);
Borough of Flemington; City of Lambertville;
Township of Raritan (west of State Hwy. 31 and
south of County Route 523); Borough of Stockton;
Township of West Amwell); SOMERSET COUNTY (Township
of Montgomery (west and south of a line following
U.S. Hwy. 206 (formerly State Hwy. 31) north from
the Mercer County line to Harlingen Rd.; then, west
along Harlingen Rd. and the Dutchtown-Zion road to
the Hillsborough township line).....................$ 39.83 24.27
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) LINE TECHNICIAN; CABLE SPLICER;
HEAVY EQUIPMENT OPERATOR. (HUNTERDON COUNTY
(Township of Delaware (east of a line following
County Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(west of State Hwy. 31); Borough of Flemington;
City of Lambertville; Township of Raritan (west of
State Hwy. 31 and south of County Route 523);
Borough of Stockton; Township of West Amwell);
SOMERSET COUNTY (Township of Montgomery (west and
south of a line following U.S. Hwy. 206 (formerly
State Hwy. 31) north from the Mercer County line to
Harlingen Rd.; then, west along Harlingen Rd. and
the Dutchtown-Zion road to the Hillsborough
township line)......................................$ 49.79 30.34
LINE CONSTRUCTION: ALL OTHER WORK: GROUNDPERSON;
TRUCK WITH WINCH OPERATOR. (HUNTERDON COUNTY
(Township of Delaware (east of a line following
County Route 523 from the Delaware River north to
the Raritan Township line); Township of East Amwell
(west of State Hwy. 31); Borough of Flemington;
City of Lambertville; Township of Raritan (west of
State Hwy. 31 and south of County Route 523);
Borough of Stockton; Township of West Amwell);
SOMERSET COUNTY (Township of Montgomery (west and
south of a line following U.S. Hwy. 206 (formerly
State Hwy. 31) north from the Mercer County line to
Harlingen Rd.; then, west along Harlingen Rd. and
the Dutchtown-Zion road to the Hillsborough
township line)......................................$ 39.83 24.27
LINE CONSTRUCTION: ALL OTHER WORK: LINE TECHNICIAN;
CABLE SPLICER; HEAVY EQUIPMENT OPERATOR. (HUNTERDON
COUNTY (Township of Delaware (east of a line
following County Route 523 from the Delaware River
north to the Raritan Township line); Township of
East Amwell (west of State Hwy. 31); Borough of
Flemington; City of Lambertville; Township of
Raritan (west of State Hwy. 31 and south of County
Route 523); Borough of Stockton; Township of West
Amwell); SOMERSET COUNTY (Township of Montgomery
(west and south of a line following U.S. Hwy. 206
(formerly State Hwy. 31) north from the Mercer
County line to Harlingen Rd.; then, west along
Harlingen Rd. and the Dutchtown-Zion road to the
Hillsborough township line).........................$ 49.79 30.34
----------------------------------------------------------------
ELEC0456-001 06/02/2025
Rates Fringes
ELECTRICIAN: CABLE SPLICER (MIDDLESEX COUNTY;
SOMERSET COUNTY (Township of Franklin (east of a
line following Cedar Grove Lane from the Raritan
River, in a southwesterly direction, to the
Millstone Branch of the Pennsylvania Railroad;
then, west along the railroad to the Delaware and
Raritan Canal; then, south along the canal to the
Middlesex County
Work on line voltage of 440 volts and over: 10% per
hour
Work from trusses, scaffolds and ladders 40 ft. or
more from the ground or floor; or under air
pressure; or over conveyors or moving equipment or
machinery: 10% per hour additional..................$ 65.35 46.56
ELECTRICIAN (MIDDLESEX COUNTY; SOMERSET COUNTY
(Township of Franklin (east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County
Work on line voltage of 440 volts and over: 10% per
hour
Work from trusses, scaffolds and ladders 40 ft. or
more from the ground or floor; or under air
pressure; or over conveyors or moving equipment or
machinery: 10% per hour additional..................$ 61.40 39.14
----------------------------------------------------------------
ELEC0456-002 05/28/2018
Rates Fringes
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) CABLE SPLICER. (MIDDLESEX COUNTY;
SOMERSET COUNTY (Township of Franklin (east of a
line following Cedar Grove Lane from the Raritan
River, in a southwesterly direction, to the
Millstone Branch of the Pennsylvania Railroad;
then, west along the railroad to the Delaware and
Raritan Canal; then, south along the canal to the
Middlesex County line)).............................$ 59.47 40.29
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) CRANE OPERATOR. (MIDDLESEX COUNTY;
SOMERSET COUNTY (Township of Franklin (east of a
line following Cedar Grove Lane from the Raritan
River, in a southwesterly direction, to the
Millstone Branch of the Pennsylvania Railroad;
then, west along the railroad to the Delaware and
Raritan Canal; then, south along the canal to the
Middlesex County line)).............................$ 59.47 40.29
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) GROUNDMAN (WHEN INSTALLTING CONDUIT
ON PUBLIC ROADWAYS). (MIDDLESEX COUNTY; SOMERSET
COUNTY (Township of Franklin (east of a line
following Cedar Grove Lane from the Raritan River,
in a southwesterly direction, to the Millstone
Branch of the Pennsylvania Railroad; then, west
along the railroad to the Delaware and Raritan
Canal; then, south along the canal to the Middlesex
County line)).......................................$ 31.03 21.02
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) GROUNDMAN; WINCH OPERATOR.
(MIDDLESEX COUNTY; SOMERSET COUNTY (Township of
Franklin (east of a line following Cedar Grove Lane
from the Raritan River, in a southwesterly
direction, to the Millstone Branch of the
Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County
line))..............................................$ 50.92 34.50
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE
UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT
INSTALLATIONS:) LINE TECHNICIAN; X-RAY TECHNICIAN;
EQUIPMENT REPAIR PERSON; EQUIPMENT SERVICEPERSON;
ELECTRICAL INSTALLATION WORKER; HOLE-DIGGING
EQUIPMENT OPERATOR; TRUCK OPERATOR WITH WINCH OR
POLE; TURCK OPERATOR WITHOUT WINCH. (MIDDLESEX
COUNTY; SOMERSET COUNTY (Township of Franklin (east
of a line following Cedar Grove Lane from the
Raritan River, in a southwesterly direction, to the
Millstone Branch of the Pennsylvania Railroad;
then, west along the railroad to the Delaware and
Raritan Canal; then, south along the canal to the
Middlesex County line)).............................$ 51.71 35.03
LINE CONSTRUCTION: (ALL OTHER WORK:) CABLE SPLICER.
(MIDDLESEX COUNTY; SOMERSET COUNTY (Township of
Franklin (east of a line following Cedar Grove Lane
from the Raritan River, in a southwesterly
direction, to the Millstone Branch of the
Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County
line))..............................................$ 59.46 40.28
LINE CONSTRUCTION: (ALL OTHER WORK:) CRANE
OPERATOR. (MIDDLESEX COUNTY; SOMERSET COUNTY
(Township of Franklin (east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County
line))..............................................$ 58.44 39.59
LINE CONSTRUCTION: (ALL OTHER WORK:) LINE
TECHNICIAN. (MIDDLESEX COUNTY; SOMERSET COUNTY
(Township of Franklin (east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County
line))..............................................$ 51.71 35.03
LINE CONSTRUCTION: (ALL OTHER WORK:) WINCH
OPERATOR. (MIDDLESEX COUNTY; SOMERSET COUNTY
(Township of Franklin (east of a line following
Cedar Grove Lane from the Raritan River, in a
southwesterly direction, to the Millstone Branch of
the Pennsylvania Railroad; then, west along the
railroad to the Delaware and Raritan Canal; then,
south along the canal to the Middlesex County
line))..............................................$ 50.92 34.50
----------------------------------------------------------------
ENGI0825-004 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
1) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM
INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND);
DERRICKS (ALL DERRICKS, LAND, FLOATING OR CHICAGO
BOOM TYPE WITH BOOM INCLUDING JIB, 140 FT. AND
OVER, ABOVE GROUND) HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 70.24 37.50
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
2) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM
INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND);
DERRICKS (ALL DERRICKS, LAND, FLOATING OR CHICAGO
BOOM TYPE WITH BOOM INCLUDING JIB, LESS THAN 140
FT. ABOVE GROUND) HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 68.58 37.50
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
3) HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 61.29 37.50
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
4) ""A"" FRAME; CHERRY PICKER (10 TON AND UNDER);
HOIST (ALL TYPES OF HOIST, INCLUDING STEAM, GAS,
DIESEL, ELECTRIC, AIR, HYDRAULIC, SINGLE AND DOUBLE
DRUM, CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER
SIMILAR TYPE OF HOISTING MACHINE, PORTABLE OR
STATIONARY, EXCEPT CHICAGO BOOM TYPE); JACK (SCREW,
AIR, HYDRAULIC POWER-OPERATED UNIT OR CONSOLE TYPE
(NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOM;
STRADDLE CARRIER HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 58.63 37.50
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
5) AERIAL PLATFORM USED AS A HOIST; COMPRESSOR, TWO
OR THREE IN BATTERY; DIRECTIONAL BORING MACHINE;
ELEVATOR OR HOUSE CAR; CONCRETE
CLEANING/DECONTAMINATION MACHINE OPERATOR,
DECONTAMINATION AND REMEDIATION WORK ONLY; CONVEYOR
AND TUGGER HOIST; FIREFIGHTER; FORKLIFT; GENERATOR,
TWO OR THREE IN BATTERY; HEAVY EQUIPMENT ROBOTIC
OPERATOR/TECHNICIAN, DECONTAMINATION AND
REMEDIATION WORK ONLY; MAINTENANCE, UTILITY PERSON;
MASTER ENVIRONMENTAL MAINTENANCE TECHNICIAN,
DECONTAMINATION AND REMEDIATION WORK ONLY; ROD
BENDING MACHINE (POWER); ULTRA HIGH-PRESSURE
WATERJET CUTTING TOOL SYSTEM OPERATOR/MAINTENANCE
TECHNICIAN, DECONTAMINATION AND REMEDIATION WORK
ONLY; VACUUM BLASTING MACHINE OPERATOR/MAINTENANCE
TECHNICIAN, DECONTAMINATION AND REMEDIATION WORK
ONLY; WELDING MACHINE (GAS OR ELECTRIC, TWO OR
THREE IN BATTERY, INCLUDING DIESEL); CAPTAIN, POWER
BOAT; TUG MASTER, POWER BOAT; OILER, WITH EITHER
ONE COMPRESSOR OR ONE WELDING MACHINE HAZARDOUS
WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR
ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY.............................................$ 57.10 37.50
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
6) COMPRESSOR, SINGLE; OFF-ROAD BACK DUMP; WELDING
MACHINE (SINGLE, GAS, DIESEL AND ELECTRIC
CONVERTERS OF ANY TYPE); WELDING SYSTEM, MULTIPLE
(RECTIFIER, TRANSFORMER TYPE); GENERATOR, SINGLE
HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION:
20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW
YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1)
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 53.34 37.50
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP
7) OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 65.74 37.50
----------------------------------------------------------------
ENGI0825-009 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE -
COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE
TRIMMER (CMI AND SIMILAR TYPES); AUTOGRADE PLACER -
TRIMMER SPREADER COMBINATION (CMI AND SIMILAR
TYPES); AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR
TYPES); BACKHOE; CENTRAL POWER PLANT (ALL TYPES);
CONCRETE PAVING MACHINE; CRANE (ALL TYPES,
INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE);
CRANE, GANTRY; DERRICK (LAND, FLOATING OR CHICAGO
BOOM TYPE); DRILLMASTER, QUARRYMASTER
(DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED
HYDRAULIC DRILL, SELF-POWERED DRILL); DRAGLINE;
ELEVATING GRADER; FRONT END LOADER (5 CU. YD. AND
OVER); GRADALL; GRADER, RAYGO; LOCOMOTIVE (LARGE);
MUCKING MACHINE; PAVEMENT AND CONCRETE BREAKER
(SUPERHAMMER AND HOE RAM); PILE DRIVER (LENGTH OF
BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE
PREMIUM RATE APPLICABLE); ROADWAY SURFACE GRINDER;
SCOOPER (LOADER AND SHOVEL); SHOVEL; TREE CHOPPER
WITH BOOM; TRENCH MACHINE (CABLE PLOW) HAZARDOUS
WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR
ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY.............................................$ 61.72 37.50
POWER EQUIPMENT OPERATORS: GROUP 2 ""A""
FRAME/BACKHOE COMBINATION; BOOM ATTACHMENT ON
LOADER (RATE BASED ON SIZE OF BUCKET, NOT
APPLICABLE TO PIPEHOOK); BORING AND DRILLING
MACHINE; BRUSH CHOPPER, SHREDDER AND TREE SHREDDER;
CARRYALL; CONCRETE PUMP; CONCRETE PUMPING SYSTEM,
PUMPCRETE AND SIMILAR TYPE; CONVEYOR, 125 FT. AND
OVER; DRILL DOCTOR, INCLUDING DUST COLLECTING AND
MAINTENANCE WORK); FRONT END LOADER (2 CU. YD. BUT
LESS THAN 5 CU. YD.); GRADER (FINISH); GROOVE
CUTTING MACHINE (RIDE-ON TYPE); HEATER PLANER;
HOIST (ALL TYPES OF HOIST, SHALL ALSO INCLUDE
STEAM, GAS, DIESEL, ELECTRIC, AIR, HYDRAULIC,
SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT
CAISSON, SNORKEL ROOF, AND/OR ANY OTHER SIMILAR
TYPE HOISTING MACHINE, PORTABLE OR STATIONARY,
EXCEPT CHICAGO BOOM TYPE) (IF HOIST IS ""OUTSIDE
MATERIAL TOWER HOIST"", LONG BOOM RATE IS TO BE
APPLIED); HYDRAULIC CRANE, 10 TONS AND UNDER;
HYDRO-AXE; HYDRO-BLASTER; JACK (SCREW, AIR,
HYDRAULIC POWER-OPERATED UNIT OR CONSOLE TYPE (NOT
HAND JACK OR PILE LOAD TEST TYPE); LOG SKIDDER;
PAN; PAVERS (ALL) (CONCRETE); PLATE AND FRAME
FILTER PRESS; PUMPCRETE MACHINE; SQUEEZECRETE;
CONCRETE PUMP (REGARDLESS OF SIZE); SCRAPER; SIDE
BOOM; STRADDLE CARRIER, ROSS AND SIMILAR TYPE; WHIP
HAMMER; WINCH TRUCK (HOISTING). HAZARDOUS WASTE
REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR
ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY. .........................................$ 60.13 37.50
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT CURBING
MACHINE; ASPHALT PLANT ENGINEER; ASPHALT SPREADER;
AUTOGRADE TUBE FINISHING AND TEXTURING MACHINE (CMI
AND SIMILAR TYPES); AUTOGRADE CURECRETE MACHINE
(CMI AND SIMILAR TYPES); AUTOGRADE CURB TRIMMER AND
SIDEWALK, SHOULDER, SLIPFORM (CMI AND SIMILAR
TYPES); BAR BENDING MACHINE (POWER); BATCHER;
BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR
SYSTEM; BOOM-TYPE SKIMMER MACHINE; BRIDGE DECK
FINISHER; BULLDOZERS (ALL); CAR DUMPER (RAILROAD);
COMPRESSOR AND BLOWER-TYPE UNIT (USED INDEPENDENTLY
OR MOUNTED ON DUAL-PURPOSE TRUCK, ON JOBSITE OR IN
CONJUNCTION WITH JOBSITE, IN LOADING AND UNLOADING
OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR
SIMILAR TYPE MATERIALS); COMPRESSOR (2 OR 3) (IN
BATTERY) (WITHIN 100 FT.); CONCRETE
CLEANING/DECONTAMINATION MACHINE OPERATOR, WHEN
USED FSource: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.