Home / Navy / Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing / Notice

Mechanism Assembly, in Repair/Modification of

Updated

Solicitation from the Department of the Navy. Due Dec 15, 2026, 2:00 PM (UTC-4), 27 days left.

Be among the first to see new Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing contracts
Only new notices that match, once a day.
Title as posted14--MECHANISM ASSEMBLY, IN REPAIR/MODIFICATION OF
Solicitation numberN0038325RD174
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing (336415)
Product or service code1440
PostedNov 17, 2026
Response deadlineDec 15, 2026, 2:00 PM (UTC-4) (27 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

The requirement has been amended as follows:

  1. The final offer due date has been extended until 15 December 2026. \ This Solicitation has been amended: 1. Total requirement quantity has been reduced from 67ea to 13ea.
  2. Offer due date has been extended until 13 October 2026.

This Solicitation has been amended to extend the offer due date until 29 May 2026. Offer due date has been extended until March 13, 2026. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 201_ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s).

Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##0000 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date.

Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT.

Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e. contracts, purchase orders, task orders delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email.

The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted and preferred. Award to be issued on the best value proposal. \ 1.

SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: MECHANISM ASSEMBLY ;1440 014612195; NSN , ;3455AS120; Part Number, Shall be performed IAW: Mechanism assembly ;IAW the latest approved methods and publications; Publication (s).

1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. Applicable documents - not applicable 3.

REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedu

Clauses in this notice (18):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 336415, a business counts as small if it has no more than 1,250 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for guided missile and space vehicle propulsion unit and propulsion unit parts manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $129.8 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing contracts right now

There are 9 open government contract opportunities in this trade (NAICS 336415), 4 posted in the last 7 days; 22% are set aside for small businesses. The agencies buying the most are Department of the Navy and Defense Logistics Agency. A notice in this trade gives a median of 28 days from posting to deadline; this one gives 28 days.

All open guided missile and space vehicle propulsion unit and propulsion unit parts manufacturing contracts

Recent awards in this trade

From the award notices agencies publish.

Similar open guided missile and space vehicle propulsion unit and propulsion unit parts manufacturing bids

Initiating Assembly
Defense Logistics Agency
Due Nov 24, 2026 · 6 days left
Solicitation · Posted Nov 16, 2026
Ring, Back Up
Defense Logistics Agency
Due Nov 27, 2026 · 9 days left
Solicitation · Posted Nov 16, 2026
Safetynet
Defense Logistics Agency
Due Nov 23, 2026 · 5 days left
Solicitation · Posted Nov 15, 2026
Bolt, Thrust Neutral
Department of the Navy
Due Dec 4, 2026, 4:30 PM (UTC-5) · 16 days left
Solicitation · Small business · Posted Nov 10, 2026
Actuator, Electro-Me
Department of the Navy
Due Nov 27, 2026, 4:30 PM (UTC-4) · 9 days left
Solicitation · Posted Oct 28, 2026
Adapter Assembly, MI, in Repair/Modification of
Department of the Navy
Due Nov 23, 2026, 4:30 PM (UTC-4) · 5 days left
Solicitation · Posted Oct 22, 2026