Inertial Measuring, in Repair/Modification of
Updated
Solicitation from the Department of the Navy. Due Dec 7, 2026, 2:00 PM (UTC-4), 30 days left.
| Title as posted | 66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF |
|---|---|
| Solicitation number | N0010427RUA21 |
| Agency | Department of the Navy |
| Office | NAVSUP Weapon Systems Support Mech |
| Notice type | Solicitation |
| Set-aside | None |
| Trade (NAICS) | Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing (334511) |
| Product or service code | 6605 |
| Posted | Nov 6, 2026 |
| Response deadline | Dec 7, 2026, 2:00 PM (UTC-4) (30 days left) |
| Add the deadline to | Google Calendar · Apple / Outlook (.ics) |
Description
This solicitation is issued pursuant to Emergency Acquisition Flexiblities (EAF). Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ NOM: INERTIAL MEASURING; NIIN 014950012; PART # 4300859; QTY. 2A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email protected].
B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting. C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.
Verify nomenclature, part number, and NSN prior to responding. D. Only a firm-fixed (FFP), not-to-exceed (NTE) or estimated (EST) price for the REPAIR of the subject item(s) will be accepted. Quotes limited to test and evaluation (T&E) will NOT be accepted.
The quoted price MUST be for the REPAIRof the item(s). E. Must adhere to IUID requirements of DFARS 252.211-7003 F. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization.
G. The Government is requesting a Repair Turnaround Time (RTAT) of: 191 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.
In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #).
A throughput of "0" (zero) per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
H. IMPORTANT NOTE: Reconciliation Price Reduction: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance.
Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the followingprice reduction amount per unit/per month the contractor does not meet the RTAT: $__________, up to a maximum of: $__________. (vendor is to fill in amount) I. Your quote MUST include the following information for justification purposes: - Repair unit price __________ - Total price__________ - Repair Turnaround Time (RTAT) __________ days - New unit price __________ NOTE: If you are not quoting the Government's Requested Repair Turnaround Time (RTAT) or sooner, you must provide your company's capacity constraints below: __________ __________ __________ - T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurre
Clauses in this notice (21):
- Item Unique Identification and Valuation (Jan 2023)
- Inspection of Supplies--Fixed-Price (Aug 1996)
- Stop-Work Order (Aug 1989)
- Wide Area Workflow Payment Instructions (Jan 2023)
- Navy Use of Abilityone Support Contractor - Release of Offeror Information (3-18))
- Mandatory Use of Workflow Pro (WFP) Mod Assist Module
- Integrity of Unit Prices (Nov 2021)
- Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives (Nov 2023))
- Equal Opportunity for Workers with Disabilities (DEV 2026-O0040)(Feb 2026)
- Transportation of Supplies by Sea (Oct 2024)
- Small Business Subcontracting Plan (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(Jul 2026))
- Option for Increased Quantity (Mar 1989)
- Contractor Purchasing System Administration-Basic (DEV 2026-O0015)(Jul 2026)
- Security Prohibitions and Exclusions (Class Deviation 2026-O0025)(Feb 2026)
- List of Award Attachments
- List of Solicitation Attachments
- Buy American-Balance of Payments Program Certificate-Basic (Feb 2024)
- Alternate A, Annual Representations and Certifications (Deviation 2026-O0043)(Feb 2026))
- Type of Contract (DEV 2026-O0045)(Mar 2026)
- Notice of Priority Rating for National Defense, Emergency Perpardeness, and ENRGY Progam Use (April 2008))
- Only One Offer (Deviation 2026-O0048)(Mar 2026)
The description continues in the official notice.
Contracting contact
As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.
Is your business small enough?
For NAICS 334511, a business counts as small if it has no more than 1,350 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.
Notice history
- Oct 22, 2026: Presolicitation Due Dec 7, 2026, 12:00 AM (UTC-4)
Companies that win this kind of work
Federal contractors paid for search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.
- Raytheon Company $2.5 billion in this trade
- Lockheed Martin Corporation $1.1 billion in this trade
- Northrop Grumman Systems Corporation $804.5 million in this trade
- Elbitamerica, Inc. $344.0 million in this trade
- Kongsberg Defence & Aerospace AS $304.4 million in this trade
About the buyer
The Department of the Navy awarded $132.7 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing contracts right now
There are 129 open government contract opportunities in this trade (NAICS 334511), 53 posted in the last 7 days; 31% are set aside for small businesses. The agencies buying the most are Department of the Navy, Defense Logistics Agency and Department of the Air Force. Most of the work with a stated place is in Virginia, Georgia and Maryland. A notice in this trade gives a median of 27 days from posting to deadline; this one gives 31 days.
Coming up in this trade
Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.
Recent awards in this trade
- Larkos Packing And Distribution Inc. $350,000 · Defense Logistics Agency · Nov 6, 2026
- B & H International LLC $113,042 · Defense Logistics Agency · Nov 5, 2026
- Seiler Instrument And Manufacturing Company, Incorporated $350,000 · Defense Logistics Agency · Nov 5, 2026
- Kampi Components Co Inc $113,825 · Defense Logistics Agency · Nov 4, 2026
- Larkos Packing And Distribution Inc. $160,446 · Defense Logistics Agency · Nov 4, 2026
From the award notices agencies publish.