Home / Navy / Switchgear and Switchboard Apparatus Manufacturing / Notice

Kite Terminal CONSO

Updated

Solicitation from the Department of the Navy. Due Nov 5, 2026, 4:30 PM (UTC-4), 8 days left.

Be among the first to see new Switchgear and Switchboard Apparatus Manufacturing contracts
Only new notices that match, once a day.
Title as postedKITE TERMINAL CONSO
Solicitation numberN0010426QND93
AgencyDepartment of the Navy
OfficeNAVSUP Weapon Systems Support Mech
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Switchgear and Switchboard Apparatus Manufacturing (335313)
Product or service code5930
PostedOct 27, 2026
Response deadlineNov 5, 2026, 4:30 PM (UTC-4) (8 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

Quantity was updated to 14. All other terms and conditions remain unchanged. \ The date specified for receipt of offers has been extended to Nov 05, 2026. Quantity updated to 15 units.

All other terms and conditions remain the same. \ 1.This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be 'issued' by the Government when copies are either deposited in the mail, transmitted by facsimile, or set be other electronic commerce methods such as email.

The Government's acceptance of the contractor?s proposal constitutes bilateral agreement to 'issue' contractual documents as detailed herein. 4.If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM?s letterhead.

5.If requirement will be packaged at a location different from the Offeror?s address, the Offeror shall provide the Name, Street Address and CAGE of the Packaging Facility. 6.Any contract awarded as a result of this solicitation will be ;DO; certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order.

8.Please provide repair price as Estimated (EST) for the full repair effort of the requirement. 9.Vendor shall have ;90; days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price (FFP) quote for the full repair effort of the carcass(es). 10.When submitting a quote, please include the cost of new (actual or estimated) for evaluation purposes.

11.Quote shall specify any exceptions including but not limited to MIL-STD Packaging, MIL-STD Labeling, Inspection & Acceptance locations, Packaging House, surplus materials, etc. If no exceptions are indicated or received, award shall be based upon solicitation requirements. Changes or requests for changes after award shall be subject to consideration costs deducted from the unit price.

12.In repair price, include all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: a.Teardown & Evaluation Rate: b.Repair Turn Around Time (RTAT): c.Throughput Constraint: d.Induction Expiration Date: 13.PRICE REDUCTIONS a.Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit.

This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government?s right to terminate for default. 14.The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. a.Requested RTAT: ;81.212 Days; 15.Quotes shall reference the proposed RTAT and any capacity constraints.

16.The option provision is included in the event the Government has anadditional requirement ;365; DAYS after issuance of the award. This willauthorize the Government to add the additional quantity, up to the percentagecited, to the order, via modification without having to re-solicit. It is requested that pricing be submitted on the option provision. \

  1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the KITE TERMINAL CONSO .
  2. APPLICABLE DOCUMENTS 2.1 Applicable Documents -

Contact: N744.16 · BXK · N/A · [email protected]

Clauses in this notice (20):

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 335313, a business counts as small if it has no more than 1,250 employees (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for switchgear and switchboard apparatus manufacturing work, who also hold Navy contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of the Navy awarded $132.1 billion in contracts in the last 12 months; its biggest suppliers were Electric Boat Corporation, Lockheed Martin Corporation and RTX Corporation. See what Navy is buying now.

Switchgear and Switchboard Apparatus Manufacturing contracts right now

There are 56 open government contract opportunities in this trade (NAICS 335313), 28 posted in the last 7 days; 30% are set aside for small businesses. The agencies buying the most are Defense Logistics Agency, Department of the Navy and Department of the Army. Most of the work with a stated place is in Tennessee, Virginia and Mississippi. A notice in this trade gives a median of 15 days from posting to deadline; this one gives 9 days.

All open switchgear and switchboard apparatus manufacturing contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

New Requirement WHS SF6 Circuit Breaker
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
Breaker Repair (LCB)
Bureau of Reclamation
Acquisition Planning · Award FY 2027 · $150K - $249K · To Be Determined
PRCA Electrical Components (LCB)
Department of the Interior
Drafting Solicitation · Award FY 2026 · $250K - $499K · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open switchgear and switchboard apparatus manufacturing bids

Fuse, Enclosed Link
Defense Logistics Agency
Due Nov 12, 2026 · 15 days left
Solicitation · Small business · Posted Oct 27, 2026
Fuseholder, Block
Defense Logistics Agency
Due Nov 9, 2026 · 12 days left
Solicitation · Posted Oct 27, 2026
Circuit Breaker
Defense Logistics Agency
Due Nov 10, 2026 · 13 days left
Solicitation · Service-disabled veteran-owned · Posted Oct 26, 2026
Cap
Defense Logistics Agency
Due Nov 10, 2026 · 13 days left
Solicitation · Posted Oct 26, 2026
Switch, Proximity
Defense Logistics Agency
Due Nov 6, 2026 · 9 days left
Solicitation · Posted Oct 26, 2026
CB Safety DEV Gen 2
Department of the Navy
Due Nov 23, 2026, 4:30 PM (UTC-4) · 26 days left
Solicitation · Posted Oct 26, 2026