Home / Commercial and Institutional Building Construction / Notice

NMAH: 2027 Install Emergency Generator

Updated

Presolicitation from the Smithsonian Institution, for work in District of Columbia. Due Feb 10, 2027, 3:00 PM (UTC-5), 89 days left.

Be among the first to see new Commercial Construction contracts
Only new notices that match, once a day.
Solicitation number33330227RF0010025
AgencySmithsonian Institution
OfficeSmithsonian Institution
Notice typePresolicitation
Set-asideNone
Trade (NAICS)Commercial and Institutional Building Construction (236220)
Product or service codeZ1JA
Place of performanceDistrict of Columbia
PostedNov 12, 2026
Response deadlineFeb 10, 2027, 3:00 PM (UTC-5) (89 days left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Description

The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. Note: This is a revised RFP. Do not use previous posted documents from SOL# 33330226RF0010007.

The applicable North American Industry Classification Codes (“NAICS”) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan.

This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance.

Specifically, work under this project includes but is not limited to: a. Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. b. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. c. Existing conditions documentation early in the construction phase for implementation into BIM models. d. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. e. A short circuit study of the proposed project prior to equipment submittals. f. Protection of existing finishes in the areas of work. g. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. h. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building.

Removal of existing conduit, panelboards, and pull-boxes throughout the building. i. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. j. Two switchover events: One from existing to temporary emergency power supplies and one for temporary to new emergency power supplies. k. Reinforcement of existing structure to support the new generators. l. Removal of the existing diesel generator in the lower level. m. Testing for lead and asbestos on existing piping at new points of connection. n. Mechanical work in the lower level to provide new fuel oil pumps. o. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. p. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite. q. All work is within an operational Museum with both staff and the public present. r. Ceiling removals and installation on the 4th and 5th floors. s. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. t. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. u. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. v. Initial testing, commissioning and black start of new electrical emergency generator systems.

The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 680 calendar days from the Notice to Proceed. This is not the requst for Proposals.

The full solicitation, request for proposals and supporting documents will be released on or about beginning of December 2026; however, there is no guarantee or implication of a guarantee this this project will be solicited. Electronic copies will be uploaded to SAM.gov site. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response.

This is not a request for proposal. DO NOT SUBMIT ANY DOCUMENTS.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 236220, a business counts as small if it has no more than $45.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Commercial and Institutional Building Construction contracts right now

There are 294 open government contract opportunities in this trade (NAICS 236220), 115 posted in the last 7 days; 65% are set aside for small businesses. The agencies buying the most are Department of Veterans Affairs, Department of the Army and Department of the Navy. Most of the work with a stated place is in California, North Carolina and Texas. A notice in this trade gives a median of 22 days from posting to deadline; this one gives 90 days.

All open commercial and institutional building construction contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

SAFB Card Reader Cabling Replacement
General Services Administration
Evaluation Stage · Award FY 2026 · Below $150K · Firm Fixed Price
HSI Wet Cell ESS
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price
USDC Carpet Refresh Chambers
General Services Administration
Acquisition Planning · Award FY 2026 · Below $150K · 8(a) Sole Source · Firm Fixed Price

Recent awards in this trade

From the award notices agencies publish.

Similar open commercial and institutional building construction bids

Cooling Tower, Roofing, and Structural Construction
Bureau of Engraving and Printing
Due Dec 11, 2026, 12:00 PM (UTC-6) · 28 days left
Solicitation · Small business · DC · Posted Nov 12, 2026
Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park
Smithsonian Institution
Due Nov 20, 2026, 3:00 PM (UTC-5) · 7 days left
Solicitation · Washington, DC · Posted Nov 10, 2026
Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus
Public Buildings Service
Due Nov 23, 2026, 4:00 PM (UTC-5) · 10 days left
Solicitation · Washington, DC · Posted Nov 5, 2026
HST Roof Safety Construction Project
Public Buildings Service
Due Nov 16, 2026, 2:00 PM (UTC-5) · 3 days left
Sources Sought · Washington, DC · Posted Nov 5, 2026
Indefinite Delivery Indefinite Quantity (IDIQ) Design-Build & Construction Multiple Award Task Order Contract (MATOC) National VA Healthcare Construction Program
Department of Veterans Affairs
Due Dec 4, 2026, 3:00 PM (UTC-5) · 21 days left
Solicitation · Service-disabled veteran-owned · DC · Posted Nov 5, 2026
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements
Public Buildings Service
Due Nov 16, 2026, 12:00 PM (UTC-5) · 3 days left
Solicitation · 8(a) · Washington, DC · Posted Nov 2, 2026