Home / VA / Other Services to Buildings and Dwellings / Notice

FY27 Holiday Decorations Furnish, Install and Remove

Updated

Solicitation from the Department of Veterans Affairs. Due Nov 18, 2026, 5:00 PM (UTC-5), 1 day left.

Be among the first to see new Other Services to Buildings and Dwellings contracts
Only new notices that match, once a day.
Title as postedS208--FY27 Holiday Decorations Furnish, Install and Remove
Solicitation number36C24827Q0122
AgencyDepartment of Veterans Affairs
Office248-Network Contract Office 8 (36C248)
Notice typeSolicitation
Set-asideNone
Trade (NAICS)Other Services to Buildings and Dwellings (561790)
Product or service codeS208
PostedNov 16, 2026
Response deadlineNov 18, 2026, 5:00 PM (UTC-5) (1 day left)
Add the deadline toGoogle Calendar · Apple / Outlook (.ics)
Official notice
Send to a teammate

Bid documents (1)

Paid members download every document from this page, or buy this bid alone.

Description

RFQ 36 C24827Q0122 - Questions and Answers

  1. Amendment 0001 updates the pricing schedule to installation and removal. Will the VA be providing the Christmas trees and decorations, or is the contractor still responsible for furnishing all materials? The contractor must supply all decorations, including, but not limited to trees, garlands, ribbons, lights, materials needed to install and remove items after the holidays, etc.
  2. If the contractor is responsible for furnishing the decorations, are there existing trees or decorations available for reuse at any of the locations? No.
  3. For the eight 12-foot Christmas trees, are there specific requirements regarding tree type, lighting, ornament quantities, or overall design beyond the red, white, and blue color scheme? Only that it is UL listed and meets all fire codes for a hospital. Please explain or provide photos of what will be provided / included in the bid.
  4. Regarding the 20-foot exterior tree, is there an existing structure or designated installation area? Will the contractor be responsible for providing the supporting structure and electrical connections? The 20-foot exterior tree being requested is only lights. There is not a structure available. Electrical connection by the VA.
  5. Will the contractor have access to electrical outlets at each location, or should temporary power and extension equipment be included in our pricing? Electrical outlets are provided in each location. Extension cords may be needed to reach electrical outlet.
  6. Are there any restrictions on the use of ladders, lifts, or other installation equipment at the facilities? Lifts and ladders may be used; areas will need to be blocked off for public / patient safety while in use.
  7. Does the VA have a preferred installation schedule for each location, or can the contractor coordinate installation dates directly with the facility POCs as long as everything is completed by November 30? There is not a set schedule. The contractor can coordinate installation dates and times. The main hospital location at 13000 Bruce B Downs Blvd is open 24/7. The other locations are open 7:30am to 5:00pm Monday Friday.
  8. At the conclusion of the holiday season, will the contractor retain ownership of the decorations, or will they become VA property? Is the contractor expected to provide off-site storage after removal? The contractor will retain ownership of the decorations.
  9. Are site visits available before the quotation deadline to assess the installation areas? All of the locations on the solicitation are open to the public and can be accessed at any time during normal VA hours.
  10. SOW 7.h requires response to service needs within 24 hours. Is a scheduled inspection/maintenance frequency required during the display period (e.g., weekly checks), and who is the on-site POC at each clinic for service calls? Maintenance is only required if the lights on the tree(s) fails. Melissa L Foster, Interior Designer 813-894-0602 or Christie Cribillero, Interior Designer 813-972-2000 x106882 are the on-site POC.
  11. SOW paragraph 8 states installation activities "shall commence no later than of November 30, 2026," while B.3 Delivery Schedule states "Furnish and Install NLT November 30, 2026." Please confirm whether all decorations must be fully installed by November 30, 2026, and the earliest date installation may begin after award. Decorations must be completed 7 business days from the date of the contract award.
  12. For the eight (8) 12-foot decorated Christmas trees (CLIN 0001): should the trees be artificial and pre-lit? Yes. Please confirm any required tree width/diameter 6 -7.5 standard, the number and type of ornaments see attached photo, and whether tree toppers yes, skirts yes or other accessories are required for the red, white and blue theme. See attached photo for example.
  13. For the 20-foot exterior "tree of lights" at Building 38 (CLIN 0002): is this a light-frame/LED structure or a decorated artificial tree? Please confirm the installation location (surface type) and any anchoring or wind-load requirements. This is a light-frame LED structure. It must be anchored into the ground/ lawn so it does not tip over.
  14. For the garland with 18-inch bows on 22 columns at Building 100 (CLIN 0003): please provide the column height and circumference, the required garland length per column, whether the garland must be lit, and the number of bows per column.
  15. Will the Government provide electrical power/outlets at each tree location and at the exterior Building 38 and Building 100 locations, and a staging/delivery area at each site? Is there a Government-designated disposal location for packaging and debris, or is the contractor responsible for all off-site disposal? Electrical outlets are provided in each location. Extension cords may be needed to reach electrical outlet. There is not a staging area onsite at any of the locations. All trash, packing materials must be removed by the contractor.
  16. SOW 7.j states decorations are "installed, removed, and stored by potential vendor," while FAR 52.212-4(n) states title passes to the Government upon acceptance. After removal on or before January 20, 2027, do the decorations become Government property or remain the property of the contractor? The contractor will retain ownership of the decorations. They do not need to be stored.
  17. Installation deadline and access. Does November 30 mean all seven sites must be complete? The delivery schedule says furnish and install by then, while the SOW says commence by then. Ask for the anticipated award date and earliest site access. Decorations must be completed 7 business days from the date of the contract award.
  18. Ownership. Is a seasonal rental acceptable with the contractor retaining the décor? Yes.
  19. Outdoor specs.

Is a light-only frame acceptable for the 20-ft tree? Yes Ask for the mounting surface, anchoring and power details, and photos or measurements for the 22 columns. Confirm whether

The description continues in the official notice.

Contracting contact

As published on the official notice. Ask questions in writing and before any questions deadline the notice sets.

Is your business small enough?

For NAICS 561790, a business counts as small if it has no more than $9.0 million in average annual receipts (SBA size standard). This notice is not set aside, but the size decides your small business status on it. SBA table, current as of Oct 15, 2026.

Notice history

Companies that win this kind of work

Federal contractors paid for other services to buildings and dwellings work, who also hold VA contracts (last 12 months): possible competitors, or partners to team with.

About the buyer

The Department of Veterans Affairs awarded $83.5 billion in contracts in the last 12 months; its biggest suppliers were Optum Public Sector Solutions, Inc., Mckesson Corporation and Triwest Healthcare Alliance Corp. See what VA is buying now.

Other Services to Buildings and Dwellings contracts right now

There are 26 open government contract opportunities in this trade (NAICS 561790), 16 posted in the last 7 days; 58% are set aside for small businesses. The agencies buying the most are National Oceanic and Atmospheric Administration, Department of the Army and Department of Veterans Affairs. Most of the work with a stated place is in Florida, Colorado and North Carolina. A notice in this trade gives a median of 10 days from posting to deadline; this one gives 2 days.

All open other services to buildings and dwellings contracts

Coming up in this trade

Planned contracts from the agencies' procurement forecasts, often months before a solicitation. Plans can change.

HVAC Duct Cleaning (Test Case)
Department of the Interior
Acquisition Planning · Award FY 2026 · Below $150K · Small Business Set Aside - Total · Firm Fixed Price
Stucco and Rooftop Repairs
Agricultural Research Service
Acquisition Planning · Award FY 2027 · $250K - $499K · Firm Fixed Price
PECO Rehabilitate Administration Building
Department of the Interior
Acquisition Planning · Award FY 2026 · $500K - $999K · Small Business · To Be Determined

Recent awards in this trade

From the award notices agencies publish.

Similar open other services to buildings and dwellings bids

WHB Adoption Office-Blackwater Cleanup
Departmental Offices
Due Nov 27, 2026, 2:00 PM (UTC-8) · 10 days left
Solicitation · Small business · Posted Nov 16, 2026
Snow Removal Services Central IL WFO
National Oceanic and Atmospheric Administration
Due Nov 17, 2026, 5:00 PM (UTC-8) · due today
Solicitation · Small business · Posted Nov 16, 2026
Snow Removal Services Chicago, IL
National Oceanic and Atmospheric Administration
Due Nov 25, 2026, 2:00 PM (UTC-6) · 8 days left
Solicitation · Posted Nov 16, 2026
Snow Removal Services Gaylord, MI
National Oceanic and Atmospheric Administration
Due Nov 25, 2026, 2:00 PM (UTC-6) · 8 days left
Solicitation · Posted Nov 16, 2026
Post Wide Fire System Inspection, Testing, and Fire Suppression
Department of the Army
Due Dec 14, 2026, 10:00 AM (UTC-5) · 27 days left
Solicitation · Women-owned · Posted Nov 16, 2026
Snow Removal Services Gaylord, MI
National Oceanic and Atmospheric Administration
Due Nov 24, 2026, 2:00 PM (UTC-6) · 7 days left
Solicitation · Posted Nov 13, 2026