Home / FY27 Holiday Decorations Furnish, Install and Remove / Document

Bid document

Updated

A Word document (684 KB) attached to FY27 Holiday Decorations Furnish, Install and Remove, from the Department of Veterans Affairs. Due Nov 18, 2026, 5:00 PM (UTC-5).

File name: 36C24827Q0122 0002_2.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SUBJECT*

FY27 Holiday Decorations Furnish, Install and Remove

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*

33637

SOLICITATION NUMBER*

36C24827Q0122

RESPONSE DATE/TIME/ZONE

11-18-2026 5:00 PM EASTERN TIME, NEW YORK, USA

ARCHIVE

5 DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

N

PRODUCT SERVICE CODE*

S208

NAICS CODE*

561790

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Ste 160A
Tampa FL 33637

POINT OF CONTACT*

Contracting Officer
Quentin Ford
[email protected]

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

RFQ 36 C24827Q0122 - Questions and Answers
1. Amendment 0001 updates the pricing schedule to installation and removal. Will the VA be providing the Christmas trees and decorations, or is the contractor still responsible for furnishing all materials? The contractor must supply all decorations, including, but not limited to trees, garlands, ribbons, lights, materials needed to install and remove items after the holidays, etc. 2. If the contractor is responsible for furnishing the decorations, are there existing trees or decorations available for reuse at any of the locations? No. 3. For the eight 12-foot Christmas trees, are there specific requirements regarding tree type, lighting, ornament quantities, or overall design beyond the red, white, and blue color scheme? Only that it is UL listed and meets all fire codes for a hospital. Please explain or provide photos of what will be provided / included in the bid. 4. Regarding the 20-foot exterior tree, is there an existing structure or designated installation area? Will the contractor be responsible for providing the supporting structure and electrical connections? The 20-foot exterior tree being requested is only lights. There is not a structure available. Electrical connection by the VA.

5. Will the contractor have access to electrical outlets at each location, or should temporary power and extension equipment be included in our pricing? Electrical outlets are provided in each location. Extension cords may be needed to reach electrical outlet. 6. Are there any restrictions on the use of ladders, lifts, or other installation equipment at the facilities? Lifts and ladders may be used; areas will need to be blocked off for public / patient safety while in use. 7. Does the VA have a preferred installation schedule for each location, or can the contractor coordinate installation dates directly with the facility POCs as long as everything is completed by November 30? There is not a set schedule. The contractor can coordinate installation dates and times. The main hospital location at 13000 Bruce B Downs Blvd is open 24/7. The other locations are open 7:30am to 5:00pm Monday – Friday.

The beginning of the document. Download the full file to read on.