Home / FY27 Multiple Award Task Order Contract, SEED PROJECT NO… / Document

0001 Attachment 7 SOL Attachment 7 SEED PROJECT Wage Determination

Updated

A PDF document (95 KB) attached to FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL., from the Department of Veterans Affairs. Due Nov 10, 2026, 11:59 PM (UTC-6).

File name: S06 0001 36C25227R0001 Att7_S02 SOL_Att07_SEED PROJECT WD IL20260002 9-20-26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

"General Decision Number: IL20260002 05/18/2026
State: Illinois
Construction Types: Building
Counties: Illinois Counties of
Alexander, Champaign, Christian, Clark,
Clay, Coles, Crawford, Cumberland, De
Witt, Douglas, Edgar, Edwards,
Effingham, Fayette, Ford, Franklin,
Gallatin, Hamilton, Hardin, Iroquois,
Jackson, Jasper, Jefferson, Johnson,
Lawrence, Marion, Massac, Moultrie,
Perry, Piatt, Pope, Pulaski, Richland,
Saline, Shelby, Union, Vermilion,
Wabash, Wayne, White and Williamson

Modification Number

Publication Date
01/23/2026
05/18/2026

ASBE0001-004 10/07/2024

Rates

ASBESTOS WORKERS/INSULATOR: INCLUDES THE

APPLICATION, INSTALLATION, AND CLEANUP OF ALL

INSULATING MATERIALS, PROTECTIVE COVERINGS,

COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL

SYSTEMS (ALEXANDER, CHRISTIAN, DE WITT, FAYETTE,
JACKSON, JEFFERSON, MARION, MOULTRIE, PERRY, PIATT,
---------------------------------------------------------------ASBE0017-001 06/01/2024

Rates
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING,
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS,

WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM

ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION

OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF

---------------------------------------------------------------ASBE0017-006 06/01/2024

Rates
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING,
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS,

WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM

Fringes

27.24

Fringes

32.76
32.76

35.75

Fringes

32.76

FIRE STOP TECHNICIAN (FORD AND IROQUOIS COUNTIES)...$ 44.02

ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION

OF ALL INSULATING MATERIALS; PROTECTIVE

COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF

---------------------------------------------------------------ASBE0018-002 06/01/2025

Rates

ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES

APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE

COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF

MECHANCIAL SYSTEMS (CHAMPAIGN, CLARK, DOUGLAS,
---------------------------------------------------------------ASBE0037-003 04/07/2025

Rates

ASBESTOS WORKERS/INSULATOR: INCLUDES THE

APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE

COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF

MECHANICAL SYSTEMS (CLAY, COLES, CRAWFORD,
CUMBERLAND, EDWARDS, EFFINGHAM, FRANKLIN, GALLATIN,
HAMILTON, HARDIN, JASPER, JOHNSON, LAWRENCE,

The beginning of the document. Download the full file to read on.

Other documents in this bid