Home / Repair Auto Maintenance Facility Bldg 575 (230040) / Document

0040 APPD

Updated

A PDF document (216 KB) attached to Repair Auto Maintenance Facility Bldg 575 (230040), from the Department of the Navy. Due Nov 23, 2026, 2:00 PM (UTC-5).

File name: 23-0040 APPD.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Print Form

UFC 1-300-08

30 JUNE 2004

Const. Contract No: N40085-15-D-0815

APPENDIX D

BUILDING INFORMATION CHECKLIST

Use Appendix D as a checklist of required information to be entered into the real property database. Provide this information for each Real Property Facility listed on the DD Form 1354 in a format that allows easy data entry into the real property system. Normally this information is provided by the A/E electronically, often in XML format or GIS compatible format.

BUILDING IDENTIFICATION for this 5-Part CHECKLIST

Facility
Number
Bldg 575

Number
of Floors

Building Name
Bldg 575 MOTOR T

Gross SF

67,228

1. Building Dimensions and Construction Materials

Building Outside
Dimensions

Length (LF)

Main Building

EXISTING

Wings

N/A

Offsets

N/A

Basement

N/A

Attic

N/A

Porches, covered

N/A

Roof

N/A

Foundation

N/A

Width (LF)

EXISTING

Other Building Data

Feet

Ceiling Height Main Bldg.

EXISTING

Ceiling Height Basement

N/A

Door Height

7'-0"

Door Width

3'-0" VARIES

Code

Fire Rating Code

TYPE IIB, F, S, AND B OCCUPANCY

Construction Materials

Type

Principal Structural Material

CMU

Secondary Structural Material

STEEL FRAME

Exterior Wall Material

BRICK, EIFS

Interior Wall Material

DRYWALL, TILE, CMU

Floor Surface Material

CONCRETE, TILE, CARPET

Sub-Floor Material

N/A

D-1

Net SF
64,500

UFC 1-300-08

30 JUNE 2004

Additional Construction Materials

Type
Pile or Foundation Material

Foundation Form
Foundation

EXISTING

EXISTING

Roof Type

Roof Support

EXISTING

Roof Deck

EXISTING

Roof Surface

EXISTING

Roof Material

STANDING SEAM METAL

3-PLY MOD BIT

Construction Materials
(Pavements)

Type

Surface Course Materials

CONCRETE, ASPHALT

Base Course Materials

GRAVEL

2. Utility Connections, Information and Fuel Data
Utility
Connections

Number of
Pipes

Water

EXISTING

Gas

EXISTING

Sewer Pipe

EXISTING

Storm Sewer Pipe

N/A

Steam

N/A

Diameter of
each pipe

Capacity of
all inlet pipes

Available or
Connected?
(Yes/No)

Condensate
Communications

4"
Energy
Type

System

YES
Source
Location

Fuel
Description

Air Circulation

Heating

GAS

METER

GAS

FORCED AIR

Air Conditioning

ELECTRIC

MAIN PANEL

N/A

FORCED AIR

Hot Water

GAS

METER

GAS

Steam

N/A

Electrical

ELECTRIC

METER

N/A

Electric

Phase

Wire
Size

Voltage

Connected
Load - AMPS

PANEL MPD

3 PHASE

480/277VAC

4 WIRE

600A

PANEL 4PD1

3 PHASE

4 WIRE

400A

T1

3 PHASE

480-208/120V

4 WIRE

5KVA

D-2

Connected
Load - KVA

UFC 1-300-08

30 JUNE 2004

3. Building Systems

Nomenclature

Amount
of UM

UM

Fire Protection System
Closed Head Auto Sprinkler

HD

TBD

Open Head Deluge System

HD

N/A

Auto Fire Detection System

HD

YES

Manual Fire Alarm System

The beginning of the document. Download the full file to read on.

Other documents in this bid