Home / Repair Auto Maintenance Facility Bldg 575 (230040) / Document

Request for Proposals

Updated

A PDF document (149 KB) attached to Repair Auto Maintenance Facility Bldg 575 (230040), from the Department of the Navy. Due Nov 23, 2026, 2:00 PM (UTC-5).

File name: RFP 230040.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Repair Auto Maintenance Facility Bldg 575
MCB Camp Lejeune

Solicitation No. N40085-27-R-9000
Project No. 23-0040

ROICC CAMP LEJEUNE

POC: Anna Lundquist
[email protected]

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A

PROPOSAL FOR THIS PROJECT:

N40085-25-D-2991
Quadrant Construction
166 Center St.
Jacksonville, NC 28546

[email protected]

N40085-25-D-2992
Blue Rock Structures
10689 US Highway 17
Pollocksville, NC 28573
[email protected]

N40085-25-D-2993
Bristol General Contractors
111 W, 16th Ave., 3rd Floor
Anchorage, AK 99501
[email protected]

N40085-25-D-2994
Joyce & Associates Construction, Inc.
6994 Hwy 70
Newport, NC 28570
[email protected]

N40085-25-D-2995
Military & Federal Construction Co.
846 Bell Fork Rd.
Jacksonville, NC 28540
[email protected]

N40085-25-D-2996
P&S Construction
5805 Breckenridge Parkway
Tampa, FL 33610
[email protected]

N40085-25-D-2997
Syncon, LLC
660 Independence Pkwy, Suite 320
Chesapeake, VA 23320
[email protected]

10/22/2026

Repair Auto Maintenance Facility Bldg 575
MCB Camp Lejeune

Solicitation No. N40085-27-R-9000
Project No. 23-0040

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-27-R-9000
Public Works Project No.: 23-0040
Title: Repair Auto Maintenance Facility Bldg 575
Contract Completion Date: 730 days after award
Estimated Cost Range: Between $10,000,000 and $25,000,000 Wage Determination: General Decision Number: NC20260010 5/18/2026 Building Liquidated Damages: $2,442.94 per Calendar Day
Note: One person may fill the roles of Superintendent and Site Safety and Health Officer, if duly qualified for both positions as defined in the project specification, however the Quality Control Manager must be a stand-alone position.
Use the attached pricing sheet with your proposal.
Special Scheduling: Building tenant (2DLAR) has portable trainer pods on site that must remain accessible and operational at all times.
Basis for Award: Lowest Price
Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled via amendment. Bond Requirements: Bid bonds are required in accordance with FAR 53.301-24. If required, the bid bond should be 20% of the proposal amount. An electronic copy of your bid bond may be submitted with your proposal. Failure to submit a bid bond by the deadline will result in your proposal being removed from

The beginning of the document. Download the full file to read on.

Other documents in this bid