Home / FY27 NRM 558-24-160, Domestic Water, Chilled Water and… / Document

160 Durham Piping Bid Documents Specifications

Updated

A PDF document (14.4 MB) attached to FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009), from the Department of Veterans Affairs. Due Dec 2, 2026, 9:00 AM (UTC-5).

File name: 9_558-24-160_Durham Piping_Bid Documents Specs.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Replace Domestic/Chilled Water, Steam Piping
Durham VA Health Care Systems
Bid Documents Specifications
Project No. 558-24-160
1/21/2025

Above Group, Inc.
305 East Dr. Suite H
Melbourne, FL 32904
(321) 345-9026
www.abovegroupinc.com

Department of Veterans Affairs
Durham VA Health Care Systems
508 Fulton Street
Durham, NC 27705

06-01-24

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 33 23

01 35 26

01 42 19

01 45 00

01 45 29

01 57 19

01 58 16

01 74 19

01 81 13

01 91 00

General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements for Major Projects
Reference Standards
Quality Control
Testing Laboratory Services
Temporary Environmental Controls
Temporary Interior Signage
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements

11-21
11-23
05-24
11-20
02-21
11-18
01-21
07-15
04-22
10-17
04-22

DIVISION 02 – EXISTING CONDITIONS

02 82 13.13

Glovebag Asbestos Abatement

01-21

DIVISION 09 – FINISHES

09 22 16

09 29 00

09 51 00

Non-Structural Metal Framing
Gypsum Board
Acoustical Ceilings

06-18
04-20
12-18

09 91 00

Painting

01-21

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41

Seismic Restraint Requirements for Non-Structural Components

01-21

DIVISION 22 – PLUMBING

22 05 11

22 05 23

22 07 11

22 08 00

22 11 00

Common Work Results for Plumbing
General-Duty Valves for Plumbing Piping
Plumbing Insulation
Commissioning of Plumbing Systems
Facility Water Distribution

01-23
09-20
09-19
11-16
05-21

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11

23 05 12

23 05 41

Common Work Results for HVAC
General Motor Requirements for HVAC and Steam Generation Equipment Noise and Vibration Control for HVAC Piping and Equipment

00 01 10-1

03-23
03-23
03-23

06-01-24

SECTION NO

23 07 11

23 08 00

23 21 13

23 22 13

23 22 23

DIVISION AND SECTION TITLES

HVAC and Boiler Plant Insulation
Commissioning of HVAC Systems
Hydronic Piping
Steam and Condensate Heating Piping
Steam Condensate Pumps

DATE

02-20
03-23
03-23
03-24
04-20

DIVISION 26 – ELECTRICAL

26 05 11

26 05 19

26 05 26

26 05 33

Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway and Boxes for Electrical Systems

APPENDICES:

-

Appendix A: NESHAP Asbestos and Lead Report

The beginning of the document. Download the full file to read on.

Other documents in this bid