Home / FY27 NRM 558-24-160, Domestic Water, Chilled Water and… / Document

160 Durham Piping Revised Bid Drawings

Updated

A PDF document (22.8 MB) attached to FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009), from the Department of Veterans Affairs. Due Dec 2, 2026, 9:00 AM (UTC-5).

File name: 9_558-24-160_Durham Piping_Revised Bid Drawings.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PROJECT #: 558-24-160

A

A

REPLACE DOMESTIC WATER, CHILLED

WATER

AND

STEAM

PIPING

Department of Veterans Affairs Medical Center

DURHAM VAMC

B

508 FULTON STREET DURHAM, NC 27705

B

SHEET LIST

ABOVE GROUP, INC.

MECHANICAL ELECTRICAL PLUMBING

305 EAST DRIVE, SUITE H

MELBOURNE, FL 32904

321.345.9026 P

C

RDC/JOHN POE

ARCHITECTURE

ARCHITECT

524 FERNWOOD DRIVE

ALTAMONTE SPRINGS, FL 32701

800.362.1523 P

N
© Google Maps

PROJECT LOCATION

O'CONNOR CONSTRUCTION

MANAGEMENT INC, OCMI

D

4/13/2026 10:20:30 AM

COST ESTIMATING

2015 AYRSLEY TOWN BLVD., SUITE 202

CHARLOTTE, NC 28273

704.280.8356 P

SHEET NUMBER

GENERAL

GI001
GI002
GI003
GI100

VA COVER SHEET

PHASING NOTES AND INSTRUCTIONS

PHASING PLAN AND GROUPING

INFECTION CONTROL MEASURES

ARCHITECTURAL

1-AE101
1-AE102
1-AE103
1-AE104
1-AE105
1-AE106
1-AE107
1-AE108
1-AE109
1-AE110
1-AE111
23-AE101
23-AE102
23-AE103
23-AE104

B1 BASEMENT FLOOR PLAN

B1 GROUND FLOOR PLAN

B1 FIRST FLOOR PLAN

B1 SECOND FLOOR PLAN

B1 THIRD FLOOR PLAN

B1 FOURTH FLOOR PLAN

B1 FIFTH FLOOR PLAN

B1 SIXTH FLOOR PLAN

B1 SEVENTH AND EIGHTH FLOOR PLAN

B1 NINTH AND TENTH FLOOR PLAN

B1 ROOF AND PENTHOUSE FLOOR PLAN

B23 GROUND FLOOR PLAN

B23 FIRST FLOOR PLAN

B23 SECOND FLOOR PLAN

B23 THIRD FLOOR AND PENTHOUSE PLAN

PLUMBING

P-001
1-PD101
1-PD102
1-PD103
1-PD104
1-PD105
1-PD106
1-PD107
1-PD108
1-PD109
1-PD110
1-PD111
1-PP101
1-PP102
1-PP103
1-PP104
1-PP105
1-PP106
1-PP107
1-PP108
1-PP109
1-PP110
1-PP111
P-501
P-502
P-503
P-504
P-505

SHEET NAME

PLUMBING NOTES, LEGENDS, & SYMBOLS

B1 BASEMENT FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 GROUND FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 FIRST FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 SECOND FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 THIRD FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 FOURTH FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 FIFTH FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 SIXTH FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 SEVENTH AND EIGHTH FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 NINTH AND TENTH FLOOR PLAN – PLUMBING PRESSURE - DEMOLITION

B1 ROOF AND PENTHOUSE ROOF PLAN – PLUMBING PRESSURE - DEMOLITION

B1 BASEMENT FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

B1 GROUND FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

B1 FIRST FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

B1 SECOND FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

B1 THIRD FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

B1 FOURTH FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

B1 FIFTH FLOOR PLAN – PLUMBING PRESSURE - NEW WORK

The beginning of the document. Download the full file to read on.

Other documents in this bid