2026.11.12 PN CALF Ph 2 Habitats and Animal Care Bldg 100% Invitation for Bids Specifications Vol 2
Updated
A PDF document (14.3 MB) attached to Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park, from the Smithsonian Institution. Due Nov 20, 2026, 3:00 PM (UTC-5).
File name: 2026.11.12 PN 2533105 CALF Ph 2 Habitats and Animal Care Bldg 100% Final IFB Spec Vol 2.pdf
The full file is for paid members, or buy this bid alone.
Preview
Smithsonian Institution
Office of Planning, Design & Construction
SPECIFICATIONS - VOLUME 2
PROJECT NO.: 2533105
PROJECT NO.:
PROJECT TITLE: Construct Arabian Leopard Habitat (ALF)
PROJECT TITLE: Phase 2 - Habitat & Animal Care Building FACILITY: National Zoological Conservation Biology Institute (NZCBI)
FACILITY:
PACKAGE: 100% Final CD Issued for Bid
DATE:
October 12, 2026 (Rev. 11/12/2026)
This project is approved as being in conformance with applicable provisions of the Smithsonian Directive (SD) 410.
Michael
J. Carrancho,
P.E., Deputy Director
Acting Deputy
Director
600 Maryland Avenue, S.W.
Suite 5001
Washington, D.C. 20024
Voice: 202.633.6230 Fax: 202.633.6233
Date
USPS Mail:
OPDC Capital Gallery
MRC 511
P.O. Box 37012
Washington, D.C. 20013-7012
October 12, 2026 (Rev. 11/12/26)
Smithsonian OPDC Project No. 2533105
SmithGroup Project No. 00100084
COVER SHEET
NOTE: SECTIONS NOTED WITH ** ARE WRITTEN AND PROVIDED BY SMITHGROUP
CONSULTANTS
VOLUME 1
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 0107 - SEALS PAGE
SECTION 01 1000 - SUMMARY (SI)
SECTION 01 2500 - SUBSTITUTION PROCEDURES (SI)
SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES (SI)
SECTION 01 2900 - PAYMENT PROCEDURES (SI)
SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION (SI)
SECTION 01 3200 - CONSTRUCTION PROGRESS DOCUMENTATION (SI)
SECTION 01 3233 - PHOTOGRAPHIC DOCUMENTATION (SI)
SECTION 01 3250 - BIM REQUIREMENTS (SI)
SECTION 01 3300 - SUBMITTAL PROCEDURES (SI)
SECTION 01 3573 - DELEGATED DESIGN REQUIREMENTS AND PROCEDURES
SECTION 01 4000 - QUALITY REQUIREMENTS (SI)
SECTION 01 4200 - REFERENCES (SI)
SECTION 01 5000 - TEMPORARY FACILITIES AND CONTROLS (SI)
SECTION 01 5639 - TEMPORARY TREE AND PLANT PROTECTION (SI)
SECTION 01 5713 - TEMPORARY EROSION AND SEDIMENT CONTROL(SI)
SECTION 01 5715 - TEMPORARY NOISE AND VIBRATION CONTROLS (SI)
SECTION 01 6000 - PRODUCT REQUIREMENTS (SI)
SECTION 01 7300 - EXECUTION REQUIREMENTS (SI)
SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL (SI)
SECTION 01 7700 - CLOSEOUT PROCEDURES (SI)
SECTION 01 7823 - OPERATION AND MAINTENANCE DATA (SI)
SECTION 01 7839 - PROJECT RECORD DOCUMENTS (SI)
SECTION 01 7900 - DEMONSTRATION AND TRAINING (SI)
SECTION 01 9113 - COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 4119 - SELECTIVE DEMOLITION **
DIVISION 03 - CONCRETE
SECTION 03 3000 - CAST-IN-PLACE CONCRETE **
SECTION 03 3500 - CONCRETE COLOR AND FINISHING **
SECTION 03 3713 - SHOTCRETE **
National Zoological Conservation Biology Institute (NZCBI) Construct Arabian Leopard Facility (ALF)
The beginning of the document. Download the full file to read on.