Home / 658-23-108 Correct Stormwater Drainage / Document

Of 7 Salem Stormwater Drawings Addendum A

Updated

A PDF document (9.9 MB) attached to 658-23-108 Correct Stormwater Drainage, from the Department of Veterans Affairs. Due Nov 10, 2026, 5:00 PM (UTC-5).

File name: 1 of 7 Salem Stormwater Drawings_Addendum A.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

B

CORRECT STORM WATER DRAINAGE

AT
D

ST

SALEM VA MEDICAL CENTER

PROJECT NUMBER: 658-23-108

CONTRACT NUMBER: 36C24624C0058

1970 ROANOKE BLVD, SALEM VIRGINIA 24153-6404

C

PROJECT CONTACT DIRECTORY

D

CONTRACT OFFICER (CO)

Bryant Guerrant (CO)
[email protected]

CIVIL ENGINEERS

CONTRACTING OFFICER

REPRESENTATIVE (COR)

CONTRACT SPECIALIST

PROFESSIONAL ENGINEER'S CERTIFICATION

Mabbett & Associates Inc.
105 Central Street
Suite 4100
Stoneham MA 02180-1260

Todd Carroll, P.E.
[email protected]
(540) 767-9386

Robert B. Blanchette, P.E.

Robert B. Blanchette, P.E.
781-777-8323
[email protected]

Andrew Jackson, P.E.
[email protected]
540-982-2463 ext. 4187

Kevin R. Sifuentes, P.E.

Kevin R. Sifuentes, P.E.
781-835-9628
[email protected]

E

LOCATION MAP

APPROVALS

Approved by Medical Center Director

Approved by Director of Facility Management Service

Approved by Project COR

Approved by Medical Director

Approved by Infection Control

Approved by Safety Officer

ROANOKE

PROJECT SITE

SALEM

F

Salem

658-23-108.GI001.dwg
8/27/25

Approved by Project CO

N.T.S

SOURCE: GOOGLE EARTH

9/30/2026

Consultant

Architect/Engineer of Record

Stamp

Mabbett
Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

Revisions

VA FORM 08 - 6231

Date

A

Sheet Number

Sheet Title

GI001
C-001

COVER SHEET

GENERAL NOTES, LEGEND AND ABBREVIATIONS

C-002

EXISTING STORMWATER STRUCTURE SCHEDULES

C-003
C-004
CK001
CK002
GC001
GC101
GC102
GC103
GC104
GC105
GC106
GC107
GC108
GC109
CD101
CD102
CD103
CD104
CD105
CD106
CD107
CD108
CD109
CG101
CG102
CG103
CG104
CG105
CG106
CG107
CG108
CG109
CU101
CU102
CU103
CU104
CU105
CU106
CU107
CU108
CU109

EXISTING STORMWATER STRUCTURE SCHEDULES

EXISTING STORMWATER PIPE SCHEDULES

SITE KEY PLAN & EXISTING CONDITIONS WATERSHEDS

SITE KEY PLAN & PROPOSED CONDITIONS WATERSHEDS

PHASING & EROSION CONTROL KEY PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EROSION CONTROL PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN

EXISTING CONDITIONS & DEMOLITION PLAN