Amendment 1: GOGA Preproposal Presentation 0001
Updated
A PDF document (4.7 MB) attached to GOGA 336173 - Repair Conzelman Road, from the National Park Service. Due Oct 29, 2026, 2:00 PM (UTC-6).
File name: B09_Amend_0001_1_GOGA_336173_Preproposal_Presentation_0001.pdf
The full file is for paid members, or buy this bid alone.
Preview
Golden Gate National Recreation Area
Repair Conzelman Road
GOGA 336173
Solicitation Number: 140P2026R0106
October 6th, 2026
THIS MEETING WILL BE RECORDED
NPS ● 2025
AGENDA
• INTRODUCTIONS
•
•
Contracting Officer: Shellie Murphy
Project Manager: Justin DeSantis
• ATTENDEES - LIST WILL BE INCLUDED IN AN
AMENDMENT
• PURPOSE OF THE PRE-PROPOSAL
CONFERENCE/VIRTUAL SITE VISIT
• BRIEF OVERVIEW OF PROJECT
• SCOPE OF WORK
• SCHEDULE
• QUESTIONS – SUBMITTED TO CO IN WRITING
N
P
S
●
SUMMARY OF SCOPE
• The work of this contract is for the stabilization of a short segment of park roadway that is threatened by coastal bluff erosion at Golden Gate National Recreation Area, Marin
County, California.
• Funding – high expectations that funds will be available, and contract will be awarded.
• General Scope of work includes:
• New retaining wall to mitigate erosion supported by
cast-in-place drilled concrete piles.
• Provide a new grade beam on top of retaining wall to
support steel bridge rail.
• Provide new guard rails and replace road to match
existing.
N
P
S
●
PROJECT
LOCATION
N
P
S
●
WORK RESTRICTIONS
• Work Hours: 8:00 am to 5:00 pm, Monday – Friday.
• Weekend, holiday and early morning work may be permitted upon request and approval by the CO.
• Traffic Control: the road will be closed to the public during construction. • Contractor may use the closed roadway, which is one-lane westbound, for two-way use by equipment and vehicles. Beware of cyclists and pedestrians that may ignore road closure signs.
• Work camps are not allowed in the park.
• There is no electrical power available at the site. Portable generators are allowed. • There is no water at the site, but water is available at a NPS hydrant less than a mile away.
N
P
S
●
WORK RESTRICTIONS
• Staging area is shown on the plans. An additional staging area may be used as shown below. N
P
S
●
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 11: Limitation on Sub
- Attachment 1: GOGA Conzelman Road Wall - Division 1 Specifications CD Submittal
- Attachment 2: GOGA Conzelman Road Wall - Division 2 Through 49 Specifications CD Submittal
- Attachment 3: Midwest Guardrail Specifications
- Attachment 5 -CaliforniaST-75BridgeRail
- Attachment 7: Wage Determination
- Attachment 8: Project Experience
- Attachment 9: PastPerf Vol I
- Sol
- Amendment 1 4 Q and As 0001
- Amendment 1 5 Caltrans 2025 Railings and Barriers StdSpecs 0001
- Amendment 1 2 Pre-Proposal Conference Transcripts 0001