Attachment 2: GOGA Conzelman Road Wall - Division 2 Through 49 Specifications CD Submittal
Updated
A PDF document (5.7 MB) attached to GOGA 336173 - Repair Conzelman Road, from the National Park Service. Due Oct 29, 2026, 2:00 PM (UTC-6).
File name: B08_Attach_2_GOGA_Conzelman_Road_Wall_-_Division_2_Through_49_Specifications_-_Final_CD_Submittal.pdf
The full file is for paid members, or buy this bid alone.
Preview
REPAIR CONZELMAN ROAD
HALE
336173
PMIS 318735
PROJECT SPECIFICATIONS
DIVISION
2 THROUGH
49 SPECIFICATIONS
DIVISION
1 SPECIFICATIONS
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION.
Signature
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
4/30/2024
06/30/2028
Expiration Date
of the License
Division 2 Through 49 Specifications
DIVISION 02 - EXISTING CONDITIONS
022600
024100
Abatement of Hazardous Materials
Demolition
DIVISION 03 - CONCRETE
031000
Concrete Forming and Accessories
032000
Concrete Reinforcing
033000
Cast-in-Place Concrete
DIVISION 31 - EARTHWORK
310519
Geosynthetics for Earthwork
311000
Site Clearing
312200
Grading
312316
Excavation
312323
Fill
312500
Erosion and Sedimentation Controls
DIVISION 32 - EXTERIOR IMPROVEMENTS
321120
Subbase and Aggregate Base Courses
321216
Asphalt Paving
321723
Pavement Markings
329119
Landscape Grading
254040 NPS GOGA Repair
Conzelman Road
07-10-2026
SECTION 022600
ABATEMENT OF HAZARDOUS MATERIALS
PART 1 - GENERAL
1.01
SUMMARY
A.
B.
Section Includes:
1.
Abatement of hazardous materials identified in contaminated soil or groundwater. Furnish labor, materials, supplies, and incidentals required, protect Project site personnel and the surrounding public from exposure to potentially hazardous substances, and prevent the spread of potentially contaminated or hazardous substances.
2.
The furnishing of labor, supervision, materials, equipment, tools, permits, manifesting, and services required in the characterization, transportation, and disposal of identified or suspected hazardous substances. The suspect substance may be in drums, containers, stockpiled, or may exist as debris piles on the Project site.
Related Requirements:
1.
C.
Division 01 - General Requirements.
Regulatory Requirements shall include, but not be limited to: Comply with laws, ordinances, codes, rules, and regulations of the Federal, State and local authorities having jurisdiction over any of the Work specified herein. Comply with federal EPA and state Department of Transportation regulations for shipping of hazardous substances to offsite disposal facilities. Comply with regulatory requirements imposed by the treatment, storage, and disposal facility. Regulations pertaining to the transport and disposal of hazardous substances/materials include, but are not limited to, the following:
1.
Department of Transportation 49 CFR 172 through 179.
2.
Department of Transportation 49 CFR 387 (46 FR 30974, 47073).
3.
Department of Transportation DOT-E 8876.
4.
Environmental Protection Agency 40 CFR 136 (41 FR 52779).
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 11: Limitation on Sub
- Attachment 1: GOGA Conzelman Road Wall - Division 1 Specifications CD Submittal
- Attachment 3: Midwest Guardrail Specifications
- Attachment 5 -CaliforniaST-75BridgeRail
- Attachment 7: Wage Determination
- Attachment 8: Project Experience
- Attachment 9: PastPerf Vol I
- Sol
- Amendment 1: GOGA Preproposal Presentation 0001
- Amendment 1 4 Q and As 0001
- Amendment 1 5 Caltrans 2025 Railings and Barriers StdSpecs 0001
- Amendment 1 2 Pre-Proposal Conference Transcripts 0001