PreBid Conference
GRAND CANYON NATIONAL PARK
Notice ID: 140P2026R0101
REPLACE SOUTH RIM WASTEWATER TREATMENT PLANT
NPS PMIS #: GRCA 257282
August 11, 2026
THIS MEETING WILL NOT BE RECORDED
NPS ● 2025
AGENDA
• INTRODUCTIONS and WELCOME - Tim Burger (CO) / Russell Moore (PM) • PROJECT OVERVIEW – Russell Moore (PM)
• PROJECT SCOPE OF WORK – Russell Moore (PM)
• WORK PHASES – Russell Moore (PM)
• CONTRACTOR SUPPORT FACILITIES – Russell Moore (PM)
• CONTRACT PRICE SCHEDULE – Tim Burger (CO)
• BID INFORMATION – Tim Burger (CO)
• CONCLUSION / SITE VISIT LOGISTICS – Tim Burger (CO) / Russell Moore (PM)
NPS ● 2025
GRCA 257282 Replace South Rim Wastewater Treatment Plant
•
Location: Grand Canyon National Park, Arizona
•
Magnitude of Construction: Greater Than $100M
•
Design & Construction Method: Design – Bid – Build
• One firm-fixed-price contract with a single period
of performance
•
Procurement Method: Full & Open
•
Procurement Dates:
• Solicitation Published: July 31, 2026
• Offers Due: November 2, 2026
• Award: Expected 1Q CY 2027
•
Solicitation #: 140P2026R0101
•
NAICS: 221320
•
Period of Performance: 36 months
NPS ● 2025
South Rim WWTP – Project Overview
This project will replace the 1970s WWTP to improve treatment efficiency & meet current standards. Project Scope Includes:
• The wastewater processes will be designed for a for a 0.65 MGD max monthly flow and 1.2 MGD peak hour flow • Treatment based on MBR technology
• Class A+ reclaimed water
• Class B biosolids w/ small Class A biosolids stream (composting) • Construction of new admin, laboratory and maintenance facilities • Construction of new electrical service and new emergency generator • Construction and phasing of new facilities, while maintaining uninterrupted operation of the existing plant throughout construction and commissioning period.
• Completion of tie-ins to existing wastewater influent manhole and effluent discharge • Demolition of all existing structures including process structures, buildings, and all supporting systems • Construction of a new paved access road generally following the route of an existing two-track dirt road. • The road will be used as the primary contractor route to the SR WWTP and adjacent staging area (constructed as part of this project).
• ADEQ Permit has been issued.
• Process Control System Integrator (SI) for South Rim WWTP PLC and SCADA Integration will be handled under a separate contract
NPS ● 2025
South Rim WWTP – Work Phases
• Access Road Improvements
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 6: Wage Determination
- Attachment 8: Solit PSP Vol I Exp REQD
- Attachment 9: Solit PSP Vol I PastPerf REQD
- Attachment 11: Solit PSP Vol II Equals
- Attachment 13: Solit PSP Vol II SubKPlan REQD RELEASED v2 Mar25
- GRCA Solicitation Form (SF 1442) and Clauses
- Sol
- Amendment 1: Access Road 100P CD Specifications 01
- Amendment 1: Amendment Form (SF 30) 01
- Sol Amendment 01
- Amendment 2: GRCA Precon SignIn 0002
- Amendment 2: What Evaluators Will Ask for Each Factor 2 0002