Attachment 11: Solit PSP Vol II Equals
Updated
A PDF document (97 KB) attached to GRCA 257282 - Replace Wastewater Plant at South Ri, from the National Park Service. Due Nov 18, 2026, 1:00 PM (UTC-7).
File name: B08_Att_11_Solit_PSP_Vol_II_Equals.pdf
The full file is for paid members, or buy this bid alone.
Preview
PROPOSED EQUALS
In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.
Section No.
A.
Paragraph
No.
Product/Model No.
Proposed Product/Model
No.
By submitting the proposed equal, the Contractor certifies that it: 1. Has investigated the proposed item and determined that it is equal or superior in all respects to the specified Salient Characteristics;
2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified;
3. Has determined that the proposed item is compatible with interfacing items; 4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution; and
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
B.
The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.
B08 Solicitation PSP Vol II Equals
v1 2025Feb
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 6: Wage Determination
- Attachment 8: Solit PSP Vol I Exp REQD
- Attachment 9: Solit PSP Vol I PastPerf REQD
- Attachment 13: Solit PSP Vol II SubKPlan REQD RELEASED v2 Mar25
- GRCA Solicitation Form (SF 1442) and Clauses
- Sol
- Amendment 1: Access Road 100P CD Specifications 01
- Amendment 1: Amendment Form (SF 30) 01
- Sol Amendment 01
- Amendment 2: GRCA Precon SignIn 0002
- Amendment 2: GRCA SR WWTP PreBid Mtg presentation 0002
- Amendment 2: What Evaluators Will Ask for Each Factor 2 0002