Amendment 2: Updated Schedule-Specifications and T Cs 0002

Updated

A PDF document (1.0 MB) attached to Alpo Stabilization of Staple Bend Tunnel, from the Departmental Offices. Due Oct 30, 2026, 4:00 PM (UTC-6).

File name: B09_-_Amend_0002_-_Updated_Schedule-Specifications_and_T_Cs_0002.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

REFERENCE NO. OF DOCUMENT BEING CONTINUED

CONTINUATION SHEET

140P4226R0026 – Amend 0002

PAGE

OF

SECTION A - TABLE OF CONTENTS

SECTION

DESCRIPTION

PAGE

PART I – The Schedule

A
B
C
D
E
F
G
H

Solicitation/Contract Form
Schedule of Items
Specifications/Drawings
Packaging and Marking
Inspection and Acceptance
Deliveries or Performance
Contract Administration Data
Special Contract Requirements

PART II – Contract Clauses

I

Contract Clauses

PART III – List of Documents, Exhibits, and Other Attachments J

List of Attachments

PART IV – Representations and Instructions

K
L
M

Representations, Certifications, and Other Statements of Offerors Instructions, Conditions, and Notices to Offerors
Evaluation Factors for Award

REFERENCE NO. OF DOCUMENT BEING CONTINUED

CONTINUATION SHEET

PAGE

140P4226R0026 – Amend 0002

OF

SECTION B – BID SCHEDULE – Amendment 0002

Item
No. Description

Quantity

Unit of
Measurement Unit Price

Total Price

BASE ITEMS

00010 Stabilization Maintenance Plan

Lump Sum

$

$

00020 Scaling

3528

Square Feet
(SF)

$

$

00030 Fossil Inventory

Hours

$

$

00040 Rock Bolt Anchors

Each (EA)

$

$

00050 Void Fill Concrete

Cubic Yards
(CY)

$

$

00060 Gunite

2310

Square Feet
(SF)

$

$

00070 Drainage

2500

Linear Feet
(LF)

$

$

00080 Signposts

Each (EA)

$

$

00090 Mobilization

Lump Sum

$

$

00010 Access / Site Set Up / Safety

Lump Sum

$

$

OPTIONAL ITEMS (SUBJECT TO AVAILIBILITY OF FUNDING)

00110 Optional Item 1 - 3D Scan

Hours

$

$

00120 Optional Item 2 – Bat House - 3
Chamber House Mounted on Post

Each (EA)

$

$

00130 Optional Item 3 – Bat House Artificial Roost Simulated Roost/Crevice Mounted on Post

Each (EA)

$

$

Total Base Price

$

Total Optional Items Price

$

Total Base & Optional Items Price

$

Notice – Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for all Base Items. Failure to do so may render the proposal unacceptable. On lump-sim line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in related item. In case of error in calculation of extended prices, the unit price government. In case of error in summation, the total of the corrected amounts governs. Round total and extended prices to whole dollars.

REFERENCE NO. OF DOCUMENT BEING CONTINUED

CONTINUATION SHEET

140P4226R0026 – Amend 0002

PAGE

OF

Note - the Requirement is being solicited under the Revolutionary FAR Updates (RFO) - Simplified Acquisition