REFERENCE NO. OF DOCUMENT BEING CONTINUED
CONTINUATION SHEET
140P4226R0026 – Amend 0002
PAGE
OF
SECTION A - TABLE OF CONTENTS
SECTION
DESCRIPTION
PAGE
PART I – The Schedule
A
B
C
D
E
F
G
H
Solicitation/Contract Form
Schedule of Items
Specifications/Drawings
Packaging and Marking
Inspection and Acceptance
Deliveries or Performance
Contract Administration Data
Special Contract Requirements
PART II – Contract Clauses
I
Contract Clauses
PART III – List of Documents, Exhibits, and Other Attachments J
List of Attachments
PART IV – Representations and Instructions
K
L
M
Representations, Certifications, and Other Statements of Offerors Instructions, Conditions, and Notices to Offerors
Evaluation Factors for Award
REFERENCE NO. OF DOCUMENT BEING CONTINUED
CONTINUATION SHEET
PAGE
140P4226R0026 – Amend 0002
OF
SECTION B – BID SCHEDULE – Amendment 0002
Item
No. Description
Quantity
Unit of
Measurement Unit Price
Total Price
BASE ITEMS
00010 Stabilization Maintenance Plan
Lump Sum
$
$
00020 Scaling
3528
Square Feet
(SF)
$
$
00030 Fossil Inventory
Hours
$
$
00040 Rock Bolt Anchors
Each (EA)
$
$
00050 Void Fill Concrete
Cubic Yards
(CY)
$
$
00060 Gunite
2310
Square Feet
(SF)
$
$
00070 Drainage
2500
Linear Feet
(LF)
$
$
00080 Signposts
Each (EA)
$
$
00090 Mobilization
Lump Sum
$
$
00010 Access / Site Set Up / Safety
Lump Sum
$
$
OPTIONAL ITEMS (SUBJECT TO AVAILIBILITY OF FUNDING)
00110 Optional Item 1 - 3D Scan
Hours
$
$
00120 Optional Item 2 – Bat House - 3
Chamber House Mounted on Post
Each (EA)
$
$
00130 Optional Item 3 – Bat House Artificial Roost Simulated Roost/Crevice Mounted on Post
Each (EA)
$
$
Total Base Price
$
Total Optional Items Price
$
Total Base & Optional Items Price
$
Notice – Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for all Base Items. Failure to do so may render the proposal unacceptable. On lump-sim line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in related item. In case of error in calculation of extended prices, the unit price government. In case of error in summation, the total of the corrected amounts governs. Round total and extended prices to whole dollars.
REFERENCE NO. OF DOCUMENT BEING CONTINUED
CONTINUATION SHEET
140P4226R0026 – Amend 0002
PAGE
OF
Note - the Requirement is being solicited under the Revolutionary FAR Updates (RFO) - Simplified Acquisition
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: Proposal Submission Package
- Attachment 1: ALPO-Staple Bend Tunnel-Specifications - 7 12 2026
- Attachment 2: ALPO-Staple Bend Tunnel-Drawings - 7 31 2025
- Attachment 8: CON Wage Determination - - Heavy and Highway - 7 30 2026
- Sol
- Sol Amendment 0001
- Amendment 2: Questions and Answers 0002
- Amendment 2: Attachment 11 - Tecco 0002
- Sol Amendment 0002