Attachment 2: ALPO-Staple Bend Tunnel-Drawings - 7 31 2025
Updated
A PDF document (8.5 MB) attached to Alpo Stabilization of Staple Bend Tunnel, from the Departmental Offices. Due Oct 30, 2026, 4:00 PM (UTC-6).
File name: B08_-_Attachment_2_-_ALPO-Staple_Bend_Tunnel-Drawings_-_7_31_2025.pdf
The full file is for paid members, or buy this bid alone.
Preview
SCALE OF MILES
F
PROJECT LOCATION
SCALE OF KILOMETERS
E
Map data (c) OpenStreetMap contributors, Microsoft, Facebook, Google, Esri Community Maps contributors, Map layer by Esri Powered by Esri
D
PARK MAP
VICINITY MAP
SCALE: NTS
C
B
SHEET
SUB SHEET
SHEET TITLE
G1
COVER SHEET
G2
STAGING PLAN
S1
SITE LAYOUT
S2
PROPOSED & EXISTING MITIGATIONS STA 1+00 TO STA 3+00
S3
PROPOSED & EXISTING MITIGATIONS STA 3+00 TO STA 5+00
S4
PROPOSED & EXISTING MITIGATIONS STA 5+00 TO STA 7+00
S5
PROPOSED & EXISTING MITIGATIONS STA 7+00 TO STA 8+00
S6
ROCK BOLT & SHORING LOCATION PLAN
S7
ROCK BOLT & SHORING DETAILS
S8
NORTH & SOUTH TUNNEL ENTRANCES
A
TETRA TECH - 140P2021D0008
PRIME:
GREAT WEST
ENGINEERING
HELENA, MT
MARK
GEOTECHNICAL:
TETRA TECH
ENNIS, MT
08/04/2025
SHEET
DESCRIPTION
DATE
INITIAL
QUALITY DESIGN CERTIFICATION
PREPARED IN ACCORDANCE WITH DESIGN
OR
DRAWING NO.
VARIANCE FROM DESIGN DEVELOPMENT (TITLE I)
OR
DRAWING NO.
CONSTRUCTION DRAWING NOT PRECEDED BY DESIGN
DEVELOPMENT (TITLE I)
PROJECT MANAGER
DATE
CONSTRUCTION DRAWINGS
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
TITLE OF PROJECT
DRAWING NO.
LOCATION WITHIN PARK
196450
STABILIZE STAPLE BEND TUNNEL 423
STAPLE BEND TUNNEL
NAME OF PARK
PKG
NO.
SHEET
ALLEGHENY PORTAGE RAILROAD NATIONAL HISTORIC SITE (ALPO)
REGION
N. ATLANTIC
COUNTY
CAMBRIA
STATE
PENNSYLVANIA
Bar measures 1 inch, otherwise drawing not to scale
OF
Copyright: Tetra Tech
8/1/2025 11:25:47 AM - Autodesk Civil 3D 2025 - C:\USERS\BRADY.GROVE\ONEDRIVE - TETRA TECH, INC\NPS STAPLE BEND TUNNEL - TO SUBMIT\IFU\IFU CD PACKAGE\INDIVIDUAL CD\STAPLE BEND TUNNEL - ACAD FILES\G1 COVER SHT.DWG - GROVE, BRADY
THIS PROJECT
STAPLE BEND
TUNNEL
TO STAPLE BEND TUNNEL PARKING AREA,
2 MILES FROM NORTH PORTAL
F
STAGING AREA
E
NORTH PORTAL ACCESS AND
PARKING FOR EQUIPMENT
NORTH TUNNEL ENTRANCE
NORTH TUNNEL ENTRANCE
SCALE: NTS
D
SOUTH TUNNEL ENTRANCE
STAGING AREA
C
SOUTH TUNNEL ENTRANCE
TRAIL CONTINUES SOUTH
SCALE: NTS
NOTES:
1.
CONTRACTOR SHALL ESTABLISH SAFETY BARRIERS FOR PEDESTRIANS AND EMPLOYEES BASED ON STAGING AREA LOCATIONS.
2.
CONTRACTOR SHALL ESTABLISH AN EMERGENCY ACTION PLAN MEETING AREA.
3.
ALL EQUIPMENT AND MATERIALS PLACEMENT SHALL BE COORDINATED WITH AND APPROVED BY THE CO.CONTRACTOR SHALL KEEP ALL CONSTRUCTION EQUIPMENT, STAGING, AND MATERIALS AWAY FROM STAPLE BEND TRAIL AREA EXCEPT WHEN IN USE WITHIN THE TUNNEL.CONTRACTOR SHALL PROTECT LAWN AND NEARBY VEGETATION THROUGH PRIOR APPROVED SITE MOBILIZATION PLAN.
4.
CONTRACTOR SHALL KEEP STAGING AREA CLEAN AND MATERIALS ORGANIZED AS DEFINED IN SPECIFICATION 017419 .
5.
THE NEAREST BATHROOM FACILITIES ARE LOCATED AT THE STAPLE BEND TRAILHEAD.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: Proposal Submission Package
- Attachment 1: ALPO-Staple Bend Tunnel-Specifications - 7 12 2026
- Attachment 8: CON Wage Determination - - Heavy and Highway - 7 30 2026
- Sol
- Sol Amendment 0001
- Amendment 2: Questions and Answers 0002
- Amendment 2: Attachment 11 - Tecco 0002
- Amendment 2: Updated Schedule-Specifications and T Cs 0002
- Sol Amendment 0002