Amendment 2: YELL - Pre-Proposal Conference Transcripts 0002
Updated
A PDF document (133 KB) attached to YELL 338223 - Bridge Preservation, from the National Park Service. Due Oct 30, 2026, 2:00 PM (UTC-6).
File name: B09_Amend_0002_YELL_338223_-_Pre-Proposal_Conference_Transcripts_0002.pdf
The full file is for paid members, or buy this bid alone.
Preview
YELL 338223 - Pre-Proposal Conference20261008_090018-Meeting Recording October 8, 2026, 3:00PM
27m 24s
Baker, Jennifer K started transcription
Murphy, Shellie A 0:03
Go ahead and go to the next slide.
So you see the agenda on the page on the screen. I'm not going to, you know, read
every single thing on it. You all will get a copy of this via an amendment. So you'll be able to go back through and take a look at it. But the first thing I would like to do is introductions. Again,
Shelly Murphy, Contracting Officer, Denver Service Center out of out of Colorado, John.
Kotchian, John D 0:41
Good morning, everybody. John Kochen here. I'm the contract specialist on the project. Good to meet everybody. I'll go ahead and turn it over to Owen. Baker, Jennifer K 0:51
Owen's actually not on today. He is the project manager on the project. I'm Jen
Baker, project specialist. Both Owen and I are out of the Denver Service Center. And then not with us today is our Yellowstone Park point of contact, Sally Barton Dale. Murphy, Shellie A 0:52
Owen, yeah.
Thanks, everybody. And really, Sally will be involved once we award great point of contact for the park. And then I will also, along with in the amendment with these slides, obviously put out the attendees
and any other information needed. Obviously, the purpose of this call, of this
meeting is to kind of high level go over expectations of the project, some critical areas of the bridges, of the work required.
any work restrictions and whatnot. And then at the, so what I'll do is after this next
slide, I'll hand it over to Jen, and then afterwards we'll finalize it, rounding off the last
slide with contracting and questions.
Other than that, I'll hand it over to you.
Baker, Jennifer K 2:07
Okay, thanks, Shelly. My computer is quite slow this morning, so it might take a
second for a slide to actually change. So generally under this contract, the work will be for preservation of three existing bridges in Yellowstone. Their category DC
be bridges. For funding, high expectations that funds will be available and contract will be awarded. The general scope of work for in-water pieces includes scour
mitigation and erosion repair and temporary stream diversions. For out of water work elements, we have concrete spall repairs.
Kris Anderson 2:47
Pet Shelley, I don't know about anyone else, but I can't hear Jen. I don't know if it's on my end, but I can hear you just fine. Murphy, Shellie A 2:55
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: General References
- Attachment 2: Specifications YELL
- Attachment 4 2026NWPs WY 401WQC
- Attachment 5: Factsheet 2026
- Attachment 6 2026 FinalRegionalConditions WY
- Attachment 7: Project Experience
- Attachment 8: Past Performance Questionnaire
- Sol
- Sol Amendment 0001
- Amendment 2: Pre-Proposal Conference Slides YELL 0002
- Sol Amendment 0002