YELLOWSTONE NATIONAL PARK

WYOMING

BRIDGE PRESERVATION

PMIS 338223

PROJECT SPECIFICATIONS

100% Submittal
September 2026

D
E
LI
19499

Date:

09/18/2026

W

YOMI

NG

)
l
vi
i
(C

O

R

J

gi
lEn
ne
na
e
o
i
N
S
Y
E

r

Prof
es
s

NATIONAL PARK SERVICE (NPS)

DENVER SERVICE CENTER (DSC)

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00

01 26 01

01 27 00

01 31 00

01 32 16

01 32 33

01 33 23

01 35 23

01 40 00

01 50 00

01 57 19.12

01 57 23

01 67 00

01 73 40

01 74 19

01 77 00

Summary of Work
Contract Modification Procedures
Definition of Contract Line Items
Project Management and Coordination
Construction Schedule
Photo Documentation
Submittal Procedures
Safety Requirements
Quality Requirements
Temporary Facilities and Controls
Noise and Acoustics Management
Under-An-Acre Pollution Prevention
Product Requirements
Execution
Construction Waste Management and Disposal
Closeout Procedures

DIVISION 02 - EXISTING CONDITIONS

02 41 00

Selective Demolition

DIVISION 03 - CONCRETE

03 30 00

03 30 10

03 30 20

Concrete
Structural Concrete Repair
Concrete Accessories

DIVISION 04 - MASONRY

04 01 40

Stone Restoration

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 18 01

Modified Concrete Overlay

DIVISION 09 - FINISHES

09 90 00

Painting

DIVISION 31 - EARTHWORK

31 23 10

31 25 00

31 32 19

31 37 00

Excavation and Backfill
Erosion and Sediment Control
Geotextiles
Riprap

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 16

32 17 23

32 91 13

32 92 19

Asphalt Paving
Pavement Markings
Topsoiling and Soil Conservation
Seeding and Mulching

DIVISION 34 - TRANSPORTATION

34 20 00

Maintenance of Traffic

APPENDIX

A
B

Size and Weight Limitations
2024 Equipment Inspection Contact List

NPS DSC Division 1 Specifications

YELLOWSTONE NATIONAL PARK – 338223

SECTION 01 10 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1

SUMMARY

A. Section includes the following:

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.2

Work Covered by Contract Documents
Work Phases
Work Under Other Contracts
Government-Furnished Materials
Contractor Use of Site
Public Use of Site
Conduct of Operations
Work Restrictions
Special Construction Requirements
Soils Investigation Report
Additional Reports

WORK COVERED BY CONTRACT DOCUMENTS

A.

Project Location: Wyoming

B.

The Work consists of:
1.

C.
1.3
A.

Project will be constructed under a single prime contract.

WORK PHASES

The work shall be coordinated with the Contracting Officer (CO). The work can be performed in