AoI Electrical Infrastructure
Updated
A PDF document (111 KB) attached to U.S. Army Contracting Command – Watervliet Arsenal (ACC-WVA) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO), from the Department of the Army. Due Sep 30, 2027, 4:00 PM (UTC-4).
File name: AoI_W911PT26SC001-A003_Electrical_Infrastructure.pdf
The full file is for paid members, or buy this bid alone.
Preview
Federal Agency: U.S. Army Tank and Automotive Command- Watervliet Arsenal (TACOM) Program Office: Army Contracting Command-Watervliet Arsenal (ACC-WVA) AoI Title: Electrical Infrastructure
CSO AoI Number: W911PT26SC001-A003 (Amended 9 September 2026) AoI Release Date: 11 May 2026
Responses: See W911PT26SC001 for Procedure Details
1. General Information
1.1 Introduction
This announcement is for an Electrical Infrastructure Area of Interest (AoI) under the ACC-WVA Commercial Solutions Opening (CSO) W911PT26SC001. Interested parties are highly encouraged to visit the Government Point of Entry (www.sam.gov) to review the ACC-WVA special posting in its entirety to obtain more information on the process for submission and evaluation of the CSO AoI Responses. This CSO AoI seeks to solicit solutions within the meaning of DFARS 212.7001 that meet the objectives detailed in Section 1.2 and 1.3 below. The authority to issue this CSO AoI is derived from ACC-WVA Commercial Solutions Opening W911PT26CS001 dated 15 April 2026. The CSO authority is per Section 1823 of the National Defense Authorization Act for Fiscal Year 2026, which amended Section 3458 of Title 10, as codified by Public Law 119-60.
1.2 AoI Background
U.S. Army Tank an Automotive Command- Watervliet Arsenal is seeking solutions for electrical infrastructure improvement at Building 120. Proposed infrastructure should be able to support future increased power demands, improve reliability and connect new energy sources. Solution should include a plan to replace the existing equipment and installation of new equipment, to include but not limited to, transformers, switchgears, electrical cable, switches and breakers.
1.3 Electrical Infrastructure
WVA is requesting the provision and installation of state-of-the-art equipment to deliver safe, reliable, and efficient power to Building 120 with a new, custom commercial 13.2kV to 480V Electrical Substation. Proposed solution should include plan to: - Disconnect and remove existing WVA electrical substation 2A1, including but not limited to the 13.2kV Switchgear, two 13.2kV-480V Transformers, 480V Switchgear and Exterior Low Voltage Transformer.
- Install the new 3750kva (kilovolt ampere) transformers, medium and low voltage switchgear within an enclosure.
- Reconnect the electrical equipment to the existing electrical infrastructure and outgoing loads.
- Replacement of 13.2kV cable from manhole 41 to section switches of new substation.
2. AoI Constraints
a. Any selected company/companies will be required to be registered in the System for Award
The beginning of the document. Download the full file to read on.
Other documents in this bid
- CSO-Watervliet Arsenal FY26
- AoI Advanced Cannon Technology
- AoI Chrome Facility Conversion
- AoI Automated Manufacturing Line of Minor Cannon Components
- AoI Advanced Tooling Manufacturing for Radial Forging
- AoI Advanced Tooling Manufacturing for Vertical Turning Lathe
- AoI A007 Automated Cooling Tower Treatments Due