Home / High Pressure Air Compressor Technical Assistance / Document

Appendix II-RevFEB2026

Updated

A PDF document (301 KB) attached to High Pressure Air Compressor Technical Assistance, from the Department of the Navy. Due Nov 13, 2026, 3:00 PM (UTC-10).

File name: Appendix II-RevFEB2026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

CONTRACTOR SECURITY REQUIREMENTS FOR SUBMARINE ACCESS

AT PHNSY&IMF’S CONTROLLED INDUSTRIAL AREA (Rev. FEB 2026)

Ref:

(a) NAVSHIPYD&IMFPEARLINST 5510.78 (series), Information and PersonnelSecurity Program
(b) NAVSHIPYD&IMFPEARLINST 5530.1 (series), Physical Security Plan (c) NAVSHIPYD&IMFPEARLINST 3070.1 (series), Operation Security (OPSEC) Program (d) NAVSHIPYD&IMFPEARLINST 5239.1 (series), Activity Information Systems Security Plan (AISSP)
(e) NAVSHIPYD&IMFPEARLINST 2200.1 (series), Portable Electronic Devices Policy

Appendix: (1) Documents Acceptable for Proof of U.S. Citizenship

1. The provisions of these security requirements are in accordance with references (a) through (e) and applicable to contracts, subcontracts and Memorandums of Agreement (MOAs) for access to: a. Controlled Industrial Area (CIA) – The large fenced-in area encompassing the waterfront and industrial shops, extending from 1274 Compound to include all of Bravo Pier 2. b. CIA Restricted Waterways (between Landing "C" and Bravo Pier 2 or if the CIA is extended to include Bravo 4) - See paragraph 18 of this document for specific access requirements. 2. Performance of all work under this Contract or MOA is restricted to U.S. citizens only 1. 3. In accordance with reference (a), for issuance of a Red Shipyard Access Control Badge (SACB), a “classified contract” is required with a Contract Security Classification Specification (DD254) that includes:
a. Red SACB - Access to Restricted Data (RD) and Naval Nuclear Propulsion Information (NNPI). b. The DD 254 must contain an approval signature from Naval Sea SystemsCommand (NAVSEA) SEA 08U/Chief of Naval Operations (CNO) N00N and NNPI handling requirements in accordance with OPNAVINST N9210.3 (Safeguarding of NNPI). 4. These security requirements are applicable to the prime contractor as well as to all subcontractors and suppliers thereunder. The terms “contractor or contract” shall refer to all of the above whether this document is included in a contract, subcontract or MOA. 5. The period of proposed work on the submarine is subject to further approval of the PHNSY&IMF Commander depending on the sensitivity of industrial operations in the affected areas. 6. At least three weeks prior to the visit, the Facility Security Officer (FSO) will submit a Defense Information System for Security (DISS) Visit Request (VR) or the Contractor VR form (PH-SYD 5512/28). When submitting the PH-SYD 5512/28, The FSO shall complete applicable items on Part

The beginning of the document. Download the full file to read on.

Other documents in this bid