PERFORMANCE WORK STATEMENT
PEARL HARBOR NAVAL SHIPYARD (PHNSY&IMF)
CONTRACTOR SUPPORT SERVICES FOR REPLACEMENT OF HP AIR COMPRESSORS
FOR VIRGINIA CLASS SUBMARINE
Background
1.1
This Performance Work Statement (PWS) describes tasks to be performed by awardee in support of Virginia class Submarine during this EDSR availability at Pearl Harbor Shipyard, Hawaii. The awardee shall provide the required work required to generate the deliverables enumerated below.
2.0
2.1
3.0
Objectives/Scope
OVERALL OBJECTIVE: The awardee, hereafter referred to as the Contractor, shall provide specialized on-site technical assistance services to the Shipyard, during on load, reassembly, reinstallation, and testing of the high-pressure, oil-free air compressors (Model 5R5-75B), manufactured by RIX Industries, using Advanced Equipment Repair Program (AERP) assets provided by the Government Project. The Contractor will support conduction of Satisfactory Operational Testing with ship and shipyard support. Additionally, the Contractor shall provide on-site technical support if repairs are required, ensuring all maintenance and operational testing are completed within the authorized contract period of performance. The Contractor shall provide all labor, equipment, tools, material in order to accomplish the technical assistance.
Performance Requirements
The Contractor will provide technical assistance to the shipyard during dockside disassembly (as necessary to on-load), reassembly shipboard, and installing the government furnished (RFI/AERP) No.1 and No. 2 HP Air Compressors. The Contractor will provide technical assistance to rigging support as necessary to on-load the AERP asset. This work shall be performed in accordance with Chapter 8 of reference (1) in paragraph 3.6, within the contract duration allowed. After preventative maintenance has been completed, the contractor will assist the shipyard and ship’s force during operational testing as needed.
R
3.1
AF
T
1.0
The Contractor shall provide one week of technical support to troubleshoot and assist in repair and testing of the No.1 and No.2 HPACs if repairs are required. The Contractor shall provide all material required to correct deficiencies.
3.3
Travel: Travel shall be in accordance with the Federal Acquisition Regulation (FAR) 31.205-46 and current DoD Joint Travel Regulations (JTR).
D
3.2
3.4
The Contractor’s work shall be governed by the completeness and quality of the work performed as summarized in paragraph 4.0, Service Delivery Summary.