Home / High Pressure Air Compressor Technical Assistance / Document

Performance Work Statement-Draft

Updated

A PDF document (759 KB) attached to High Pressure Air Compressor Technical Assistance, from the Department of the Navy. Due Nov 13, 2026, 3:00 PM (UTC-10).

File name: Performance Work Statement-DRAFT.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT

PEARL HARBOR NAVAL SHIPYARD (PHNSY&IMF)

CONTRACTOR SUPPORT SERVICES FOR REPLACEMENT OF HP AIR COMPRESSORS

FOR VIRGINIA CLASS SUBMARINE

Background

1.1

This Performance Work Statement (PWS) describes tasks to be performed by awardee in support of Virginia class Submarine during this EDSR availability at Pearl Harbor Shipyard, Hawaii. The awardee shall provide the required work required to generate the deliverables enumerated below.

2.0
2.1

3.0

Objectives/Scope

OVERALL OBJECTIVE: The awardee, hereafter referred to as the Contractor, shall provide specialized on-site technical assistance services to the Shipyard, during on load, reassembly, reinstallation, and testing of the high-pressure, oil-free air compressors (Model 5R5-75B), manufactured by RIX Industries, using Advanced Equipment Repair Program (AERP) assets provided by the Government Project. The Contractor will support conduction of Satisfactory Operational Testing with ship and shipyard support. Additionally, the Contractor shall provide on-site technical support if repairs are required, ensuring all maintenance and operational testing are completed within the authorized contract period of performance. The Contractor shall provide all labor, equipment, tools, material in order to accomplish the technical assistance.

Performance Requirements

The Contractor will provide technical assistance to the shipyard during dockside disassembly (as necessary to on-load), reassembly shipboard, and installing the government furnished (RFI/AERP) No.1 and No. 2 HP Air Compressors. The Contractor will provide technical assistance to rigging support as necessary to on-load the AERP asset. This work shall be performed in accordance with Chapter 8 of reference (1) in paragraph 3.6, within the contract duration allowed. After preventative maintenance has been completed, the contractor will assist the shipyard and ship’s force during operational testing as needed.

R

3.1

AF
T

1.0

The Contractor shall provide one week of technical support to troubleshoot and assist in repair and testing of the No.1 and No.2 HPACs if repairs are required. The Contractor shall provide all material required to correct deficiencies.

3.3

Travel: Travel shall be in accordance with the Federal Acquisition Regulation (FAR) 31.205-46 and current DoD Joint Travel Regulations (JTR).

D

3.2

3.4

The Contractor’s work shall be governed by the completeness and quality of the work performed as summarized in paragraph 4.0, Service Delivery Summary.

3.5

The beginning of the document. Download the full file to read on.

Other documents in this bid