Appendix L-06 Team Structure Format
36C10F27R0003
Design-Build and Construction MATOC
Instructions: Complete one Appendix L06 for each team member (Prime, JV Partner, Subcontractor with signed TA, Mentor, or Protégé). Identify the team member’s business information, relationship to the Prime, all States/VA Medical Centers where the team member will perform, and the construction program areas they will support. All information must match the signed Teaming Agreements submitted in Volume II.
Prime or Team Member Information
Prime/Team Member Relationship
(Required per Section L‑2.5.5(2))
Describe the relationship between the Prime and this team member:
Prime
Joint Venture Partner
Subcontractor (with signed Teaming Agreement)
Mentor
Protégé
Narrative Description:
3. States / VA Medical Centers Where Team Member Will Perform (Required per Section L‑2.5.5(3))
List all States, or specific VAMCs where this team member is expected to perform. If multiple locations apply, list them all in this section.
4. Primary Construction Program Areas
(Required per Section L‑2.5.5(4))
List all construction program areas this team member will support, such as:
General healthcare facility construction and renovation, Healthcare additions and upgrades,
Repairs, refits, maintenance enhancements, equipment and component replacement, Parking garages, parking lots, roadways, bridges,
General office, conference, and meeting spaces,
Requirements to maintain on-going operations and prepare for larger efforts such as swing space or make-ready work, Seismic retrofit of Existing facilities,
Utilities to include but not limited to water, electrical, sewer, and storm water, Historic facility renovations,
General infrastructure to include but not limited to fencing, vehicle barriers, awnings, and signage. Sustainable infrastructure requirements
Medical equipment installation
Technology infrastructure
Security infrastructure
Enter all applicable areas below:
5. Teaming Agreement Reference
(Required per Section L2.5.5 – all team members must have signed TAs)
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Appendix L 02 Choice of Competition
- Appendix L 03 Work Sample Cover Sheet
- Appendix L 09 Small Business Participation Commitment Document SBPCD
- Appendix L 11 Past Performance Questionnaire DBnC MATOC
- Attachment 1: Draft DBnC Scope
- Attachment 2: DBnC Ordering Procedures
- Attachment 3: Section L Instructions to Offerors
- Attachment 4: Section M Evaluation Criteria
- Attachment 5: On Off Ramping Procedures