AS27 BLS Facility Rehab Questions and Answers
Updated
A Word document (19 KB) attached to Angkor Sentinel 27 Base Life Support Facility Rehab Services, from the Department of the Army. Due Nov 20, 2026, 1:00 PM (UTC-10).
File name: AS27 BLS Facility Rehab Questions and Answers.docx
The full file is for paid members, or buy this bid alone.
Preview
Questions and Answers
AS27 Base Life Support/Facility Rehabilitation Services The city, province and specific Government-designated AS27 site location(s) in Cambodia, or the permissible location details for planning delivery and local support. The primary place of performance is the Multinational Peacekeeping Force Training Center (PKO) located at:ភូមិផ្គង់, ផ្លូវលេខ ៤៤, គីឡូម៉ែត្រ ៨, Krong Chbar Mon, Kampong Speu Province, Cambodia. Additional locations specifically identified in the Transportation PWS/RFQ are: Techno / Techo International Airport (Phnom Penh), Hyatt Regency Hotel, Phnom Penh, Phum Serey Hotel / Phum Serey Mongkul Resort, Kampong Speu. All other AS27 requirements (Catering and BLS/Facility Rehabilitation) are performed at or in support of the PKO Training Center in Kampong Speu. Exact delivery/setup points within the PKO will be coordinated by the COR after award. The complete Performance Work Statement (PWS), including any site-specific requirements and schedules. Please see SAM.gov for all documents/information associated with the solicitations. The official Excel pricing sheet referenced in the solicitation. Contractor shall provide excel pricing sheet based on the CLIN structure. Written guidance on whether we may disclose only the minimum technical specifications necessary to prospective Cambodia-based subcontractors for preliminary quotations, without distributing the RFQ itself. You may disclose the PWS/Combined Synopsis and Solicitation information needed to provide estimates with your prospective subcontractor as needed. We understand the solicitation prohibits sharing the RFQ with other vendors, and will not forward it to prospective suppliers. We appreciate your consideration despite the elapsed questions deadline. You may disclose the PWS/Combined Synopsis and Solicitation information needed to provide estimates with your prospective subcontractor as needed. Questions and Answers
-CLIN 0004
It says to install ATS “or equal”. Can “equal” be a 24/7 operator for the large generator? No. “Or equal” means a functionally equivalent automatic transfer capability that provides the same seamless, unmanned switchover as an Automatic Transfer Switch (ATS). A 24/7 human operator is not considered equal to an ATS. The Contractor shall provide an ATS (or true automatic equivalent). Separate optional CLINs already exist for continuous 24-hour operation or 0600–2200 daily operation of the generator. Manned operation may be discussed only as an additive service under those options, not as a substitute for the required automatic transfer capability.
The beginning of the document. Download the full file to read on.