Home / FOPR for F-16 AAGs for the Common Aircraft Portable… / Document

ATSA-I CAPRE Questions Comments v4

Updated

A PDF document (181 KB) attached to FOPR for F-16 AAGs for the Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV), from the Department of the Air Force. Due Jan 19, 2027, 4:00 PM (UTC-5).

File name: ATSA-I_CAPRE_Questions Comments v4.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

FA8533-26-R-0007: Common Aircraft Portable Reprogrammable Equipment (CAPRE) FORP# ATSA-0003-FO-1 Questions & Comments Number
RFP Section
Letter FOPR FA8533-26-R-0007

FOPR

TOPR Paragraph
Availability of Funds

When does the Government anticipate receipt of funds for this task order?

Question/Comment

Questions

Please confirm there is no cutoff date by which questions must be submitted?

To ensure the integrity of the proposal due date, the Government requests that all questions be received one week prior to proposal due date.

Proposals shall be submitted via DoDSAFE to Ben Wilton and Ashley Wynn. Please confirm the DoDSAFE drop-off link requested/provided will specify both Mr. Wilton and Ms. Wynn as recipients, as drop-off links normally only list the individual who issued the link as the recipient, and does not allow the Contractor to add an additional recipient. If the Government is not able to configure the drop-off link to specify both Mr. Wilton and Ms. Wynn as recipients please confirm submittal to only the DoDSAFE recipient specified in the drop-off link is acceptable.

An email should be sent to both Ben Wilton and Ashley Wynn requesting the DoDSAFE dropoff link. Ben Wilton or Ashley Wynn will provide the DoDSAFE drop-off link and the offeror will reply to that link.

Attachment AFOPR Instructions
and Evaluation

1.G. Proposal
Submittal via DoD

SAFE

Attachment AFOPR Instructions
and Evaluation

1.H. (2) Volume II:
Offerors are required to provide a maximum of three (3) prior efforts within the past five (5) years. Specifically, "detailed narratives and supporting data". Factor 2: Past
Will the Government please list examples of the type of "supporting data" they require or is this referring to the Subfactor 2.1 requirements only? Also, with a 15-page Performance (15-page maximum limit for all past performance, will the Government clarify is they prefer greater focus on the detailed narrative or the supporting data? max) and Factor 2:
Past Performance,
Subfactor 2.1

Attachment C - CLIN
Structure with
Production Ready
Cable

Attachment B SOW

Table 4.2: F-16
Technical Orders

Attachment B SOW

Section 4 The Government's SOW states: "To complete this effort, the contractor shall obtain LRU data and artifacts from the Original Equipment Manufacturers (OEMs) for successful Requirements Page 6 development of software and hardware. If this data cannot be obtained, the United States Government (USG) will work with the contractor to provide access to LRU and/or

The beginning of the document. Download the full file to read on.

Other documents in this bid