GENERAL NOTES
1.
SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
3.
ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED
STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE
EXCEPTION OF DOMESTIC WATER SERVICES. ALL PRESSURE RELIEF VALVES USED
FOR STEAM SERVICE SHALL BE FORGED STEEL.
2.
ALL INSTRUMENTATION TO CONNECT VIA CP-5A, UNLESS OTHERWISE INDICATED.
A
A
KEYED NOTES
3/4" THREADED HALF-COUPLING FOR CALORIMETER CONNECTION. LOCATE TO
ALLOW SPACE FOR THREADED PLUG
CONNECT EXISTING BOILER 4 TO NEW STEAM HEADER
CONNECT EXISTING BOILER 4 3" STEAM ATOMIZATION LINE TO NEW STEAM HEADER
GENERAL LINETYPES
ANALOG SIGNAL
PIPING PROCESS
CONTINUATION ARROWS
3" HPS
3" HPS
EXISTING
BOILER #4
B
XXXX
XXXX
FLOW DIRECTION
DRAWING
POS1
POS2
FLOW DIRECTION
(SINGLE )
B
XXX
FLOW ARROW
FIT
44005
AREA BOUNDRY
FI
FIQ
44005 44005
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
FE
44005
112-105-BLR-005
D-641
C
8" HPS
8" HPS
V-44004
V-44007
8" HPS
V-44033
112-105-FLO-002
C
HPS TO MAIN
STEAM HEADER
PROCESS SYMBOLS
DRAIN
C
NC
EXISTING
BOILER 4
3"
6" HPS
LINE WITH PLUG
V-44006
STEAM TRAP- INVERTED BUCKET
PIPE CAP
UNION
PROCESS VALVES
GATE VALVE W/ GLOBE VALVE BYPASS
VALVES (GENERAL)
INSTRUMENT SYMBOLS
V-44017
CP-1
V-44012
PI
44001
V-44001
PIT
44001
V-44002
V-44010
D
D
XXX
XXX
FIELD MOUNTED-DISCRETE INSTRUMENT
XXX
XXX
PRIMARY LOCATION ACCESSIBLE TO OPERATOR-SHARED
DISPLAY * = PANEL LEGEND
*
ABBREVIATIONS
4" HPS
V-44022
NC
V-44013
NC
NC
V-44009
TRP-44031
V-44011
NC
4" HPS
10" HPS
HPS
HIGH PRESSURE STEAM
TRP-44032
E
E
3/4" DR
3/4" DR
1"
HPR
V-44034
F
F
CONSULTANT
2026-04-06
2026-03-09
2025-12-30
2024-09-17
2024-07-24
Date:
REV E - 100% CONSTRUCTION DOCUMENTS
REV D - 95% CONSTRUCTION DOCUMENTS
REV C - 65% DESIGN DEVELOPMENT
REV B - 65% DESIGN DEVELOPMENT
REV A - 35% SCHEMATIC DESIGN DOCUMENTS
Revisions:
VA FORM 08 - 6231
ARCHITECT/ENGINEER OF RECORD
Office of
Construction
and Facilities
Management
Phase
Project Title
Project Number
PROCESS - P&ID - STEAM - BOP BID DEDUCT
100% CONSTRUCTION
DOCUMENTS
REPLACE BOILERS 4 & 5
695-24-107
Approved: Project Director
NOT SPRINKLERED
U.S. Department
of Veterans Affairs
23 MECHANIC STREET, SPRINGVILLE, NY 14141
Drawing Title
Building Number
Location
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
Issue Date
Checked
Drawn
2026-04-06
BEH
DAK
Drawing Number
D-643
GENERAL NOTES
SEE D-001 FOR D-SERIES NOTES AND LEGENDS.
KEYED NOTES
LOW-FIRE PROVING SWITCH REQUIRED ON CONTROL DAMPER, REFER TO
BAPSDTM
FORCED DRAFT MOTOR INTERLOCK CURRENT RELAYS SHALL BE SET UP ON A