STATEMENT OF WORK

PBA Testing, Lab Services and Engineering
I.

TITLE: Testing, Lab Services and Engineering

II.

BACKGROUND: Pine Bluff Arsenal (PBA) performs a variety of missions for the Department of Defense, including the manufacture and demilitarization of ammunition and related components. To accomplish this mission within the environmental protections established by the Clean Air Act (CAA), Clean Water Act (CWA), Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Restoration and Compensation Liability Act (CERCLA), and the Spill Prevention, Control, and Countermeasure (SPCC) regulations. In addition to the aforementioned regulations, to accomplish the mission, PBA must comply within requirements established by the Defense Environmental Restoration Program (DERP). PBA is seeking contract services related to these requirements. This effort will augment on-going on-site laboratory evaluations in several media. An existing contract that provides these services will expire in December 2026. All references to “PBA” imply action, coordination and/or approval of the Contracting Officer (KO).
This contract will task the contractor with:
Task 1 Ecological Surveys;
Task 2 Toxicity Testing Compliance required by permit;
Task 3 Groundwater Assessments;
Task 4 Geographic Information System (GIS) Support;
Task 5 Stormwater Compliance;
Task 6 Regulatory Compliance Assistance;
Task 7 Restoration Regulatory Support
Task 8 Domestic Water Supply Well Removal
Task 9 Travel reimbursement.
The contract will be for an initial base year with four renewable option years for a possible total of five years. The contractor shall provide on-call assistance to answer technical questions concerning the contract deliverables for the duration of the contract. Workdays for this contract are Monday through Friday beginning at 7:00 AM and ending at 5:00 PM, Central Time zone. Five (5) day advance notification of contractor site visits is required. All contractor personnel performing activities at PBA must attend a Safety Briefing before any work is conducted. The safety Briefing is held Monday-Thursday beginning at 7:30 AM at Building 17-130. The local work covered by this contract is to be performed at PBA. Postal address is Pine Bluff Arsenal, 10020 Kabrich Circle, Pine Bluff, Arkansas 71602-9500. The Arsenal is located off Highway 530, Exit 32, about 12 miles northwest of Pine Bluff and 35 miles southeast of Little Rock. Note: The contractor shall include the contract number, the COR’s name, and the COR’s phone