Home / Pine Bluff Arsenal Testing, Lab and Engineering Services / Document

Attachment 6: A03. Contract Data Requirements List CLIN003 Base 2026 SC

Updated

A PDF document (89 KB) attached to Pine Bluff Arsenal Testing, Lab and Engineering Services, from the Department of the Army. Due Nov 12, 2026, 2:00 PM (UTC-6).

File name: Attachment 0006 - A03. CDRLs CLIN003 Base 2026_SC.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Show

Hide

UNCLASSIFIED

Instructions

(Updated 20260512)

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TDP

D. SYSTEM/ITEM

1. DATA ITEM NO.

C. CATEGORY:

B. EXHIBIT

E. CONTRACT/PR NO.

OTHER Reports

TM

F. CONTRACTOR

2. TITLE OF DATA ITEM

3. SUBTITLE

17. PRICE GROUP

Groundwater Hydrogeological Assessments

5. CONTRACT REFERENCE

4. AUTHORITY (Data Acquisition Document No.)

6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

ASPG-PWV

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

Distribution A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

b. COPIES

a. ADDRESSEE

PWV-IRPM

16. REMARKS

Final
Draft

Reg

Repro

Task 3.1 - Submit groundwater assessment reports for detection monitoring of the runoff control impoundment (RCI) and 83 Hazardous Waste Landfills according to requirements in PBA RCRA Permit 1H-RN3. The DRAFT report shall be submitted 30-days prior to the submission day of May 1st. Task 3.2 - Submit groundwater assessment reports for detection monitoring of 86 Hazardous Waste Landfill according to requirements in PBA RCRA Permit 1H-RN3. The DRAFT report shall be submitted 30-days prior to the submission day of May 1st.
Task 3.3 - Submit RCRA Corrective Action sites groundwater assessment reports for groundwater quality impacts at 12 corrective action sites detection monitoring of 86 Hazardous Waste Landfill according to requirements in PBA RCRA Permit 1H-RN3. The DRAFT report shall be submitted 30-days prior to the submission day of May 1st.
Task 3.4 Submit 5-year groundwater and ecological trend monitoring report every 5 years by December 30 as required by PBA RCRA Permit 1H-RN3. Submit DRAFT ecological trend monitoring report 30-days prior to the due date of December 30.

Add Continuation of Remarks

G. PREPARED BY

Sarah Clem, Installation Restoration
Manager

DD FORM 1423, FEB 2024

Show Attachment Bar

Remove Current Page

H. SIGNATURE

Insert Page

I. APPROVED BY

signed by
CLEM.SARAH.A Digitally

CLEM.SARAH.ANNE.1554936969

NNE.1554936969 Date: 2026.10.19 10:57:06 -05'00'

UNCLASSIFIED

PREVIOUS EDITION MAY BE USED.

15.TOTAL

J. SIGNATURE

Add Page to
End

(Updated 20260512)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

The beginning of the document. Download the full file to read on.

Other documents in this bid