Statement of Objectives

10 November 2026

1.

Authority: This CSO is issued under 10 U.S.C. § 4022 and DFARS Subpart 212.70, allowing the Department of War (DoW) to acquire innovative commercial items, technologies, or services through competitive procedures outside traditional FAR-based solicitations. All solutions will be treated as commercial items under FAR Part 12. Award may be executed as a FirmFixed-Price (FFP) contract(s).

2.

The "Area of Interest" (AOI) / Problem Statement: The Pine Bluff Arsenal (PBA) seeks an automated, high-precision mixing, granulation, and drying system with integrated material de-clumping, weighing, and transferring solutions to modernize the production of colored smoke energetics. Current legacy systems are 25+ years old, suffer from structural fatigue, utilize obsolete PLC controls, and rely heavily on manual material handling. The desired modernized solution must maximize throughput, minimize the re-blend rate, ensure sub-millimeter granulation consistency, and integrate modern safety sensors to mitigate fire and explosion risks during the processing of pyrotechnic mixes. Additional goals are to minimize the number of operators and required maintenance.

3.

Solution Parameters.
3.1. High-Precision Mixing, Granulation, and Drying System: 3.1.1. Must utilize fluidized bed mixer granulator (FBG) technology. 3.1.2. Minimum mixing volume of 1,100 liters for each FBG. 3.1.3. Procurement baseline requires at least two (2) FBGs, with an option to integrate a third (3rd) FBG if budget allows.
3.1.4. The FBG must have a minimum re-blend rate of 4%. The re-blend rate (R) shall be calculated as follows:
˙

𝑅

𝑁
𝑁

Where:
˙

𝑅= Re-blend rate (%)
𝑁 = Number of re-blends in the campaign
𝑁 = Total number of batches in the campaign
3.1.5. Explosion Relief Venting: FBGs must have an explosion relief vent pointing upward and rated for an overpressure, in order to minimize the effect of a fire.

3.1.6. Intake Air Conditioning & Dehumidification (Project Scope): 3.1.6.1. FBG systems must operate on an open cycle, pulling intake air from the outside.
3.1.6.2. Full processing and conditioning of the outside intake air is part of the project scope. Steam is available for heating the intake air, but any cooling or humidity reduction equipment must be supplied as part of the project design.
3.1.6.3. The intake air treatment system must reduce relative humidity (RH) to the lowest level reasonably achievable using mechanical refrigeration without the use of desiccant

The beginning of the document. Download the full file to read on.