Home / Road Paving IAH (Houston Bush) Airport / Document

Attachment 1: IAH Access Road Specification

Updated

A PDF document (574 KB) attached to Road Paving IAH (Houston Bush) Airport, from the Federal Aviation Administration. Due Jan 14, 2027, 5:00 PM (UTC-6).

File name: Attachment 1 IAH Access Road Specification.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

GREAT LAKES REGION

Fort Worth, Texas
1404792
06/24/2025

8R Mid Field RVR and 15L RO RVR access road construction, George Bush Intercontinental, Houston, Texas

DIVISION 2 – SITE WORK SECTION 2B CRUSHED AGGREGATE ROAD AND SITE

DIVISION 3 – CONCRETE SECTION 3A CONCRETE FORMWORK AND REINFORCEMENT

DIVISION 16 – ELECTRICAL SECTION 16B 600-VOLT POWER CABLE FOR

i

ii

DIVISION 1 - GENERAL REQUIREMENTs

SECTION 1A

SPECIAL CONDITIONS

1A.1

SCOPE.
a. This Specification covers general requirements for construction of RVR. In general, all parts of this Specification covering construction required on project drawings and in other Contract documents are applicable to this Contract. b. The Contractor shall furnish all plant, labor, materials (except Government-furnished property), equipment, energy, transportation, and other services necessary to construct all elements of the systems required in the Specifications, Drawings, and other Contract documents. Construction shall include all miscellaneous and incidental work necessary for a complete and operational system, whether or not such work is specifically shown or specified.
c. Work for 8R Mid Field RVR and 15L RO RVR access road construction, George Bush Intercontinental, Houston, Texas shall include:
i. At 8R Mid Point RVR an access road will be constructed from the taxiway CC to the existing RVR sensor. At 15L RO RVR the access road will be extended from the existing access road to the taxiway WP.

1A.2

GOVERNMENT-FURNISHED Material (GFM). Government-furnished Material for this contract is listed on the Government-furnished Material list and is the sole Contract document which validly identifies Government-furnished material under this Contract. The Government-furnished property will be available on site prior to construction.

1A.3

CONTRACTOR-FURNISHED MATERIAL. The Contractor shall furnish all material under this contract per Paragraph 1A.1b, except the Government-furnished material identified on the Government-Furnished Material List. The instruction “by others” on the drawings means equipment that is provided by a third. Contractor will not be required to provide work or material shown as “by others”. The Contractor shall be aware that certain materials to be furnished by the Contractor, may be long-lead-time items. Therefore, the successful bidder should determine the availability of all material immediately after Contract award, and initiate procurement action on long-lead-time items at the earliest

The beginning of the document. Download the full file to read on.

Other documents in this bid