DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
GREAT LAKES REGION
Fort Worth, Texas
1404792
06/24/2025
8R Mid Field RVR and 15L RO RVR access road construction, George Bush Intercontinental, Houston, Texas
DIVISION 2 – SITE WORK SECTION 2B CRUSHED AGGREGATE ROAD AND SITE
DIVISION 3 – CONCRETE SECTION 3A CONCRETE FORMWORK AND REINFORCEMENT
DIVISION 16 – ELECTRICAL SECTION 16B 600-VOLT POWER CABLE FOR
i
ii
DIVISION 1 - GENERAL REQUIREMENTs
SECTION 1A
SPECIAL CONDITIONS
1A.1
SCOPE.
a. This Specification covers general requirements for construction of RVR. In general, all parts of this Specification covering construction required on project drawings and in other Contract documents are applicable to this Contract. b. The Contractor shall furnish all plant, labor, materials (except Government-furnished property), equipment, energy, transportation, and other services necessary to construct all elements of the systems required in the Specifications, Drawings, and other Contract documents. Construction shall include all miscellaneous and incidental work necessary for a complete and operational system, whether or not such work is specifically shown or specified.
c. Work for 8R Mid Field RVR and 15L RO RVR access road construction, George Bush Intercontinental, Houston, Texas shall include:
i. At 8R Mid Point RVR an access road will be constructed from the taxiway CC to the existing RVR sensor. At 15L RO RVR the access road will be extended from the existing access road to the taxiway WP.
1A.2
GOVERNMENT-FURNISHED Material (GFM). Government-furnished Material for this contract is listed on the Government-furnished Material list and is the sole Contract document which validly identifies Government-furnished material under this Contract. The Government-furnished property will be available on site prior to construction.
1A.3
CONTRACTOR-FURNISHED MATERIAL. The Contractor shall furnish all material under this contract per Paragraph 1A.1b, except the Government-furnished material identified on the Government-Furnished Material List. The instruction “by others” on the drawings means equipment that is provided by a third. Contractor will not be required to provide work or material shown as “by others”. The Contractor shall be aware that certain materials to be furnished by the Contractor, may be long-lead-time items. Therefore, the successful bidder should determine the availability of all material immediately after Contract award, and initiate procurement action on long-lead-time items at the earliest