Attachment 1: Performance Work Statement
Updated
A PDF document (238 KB) attached to Airfield Equipment Transportation and Maintenance Preparation, from the Department of the Army. Due Oct 14, 2031, 10:00 AM (UTC-4).
File name: Attachment 1 Performance Work Statement.pdf
The full file is for paid members, or buy this bid alone.
Preview
SECTION 1: PERFORMANCE WORK STATEMENT (PWS)
PART 1 – GENERAL
1. GENERAL: The following provisions shall apply to the performance of work under this contract: 1.1. SCOPE OF WORK: The Contractor shall provide all labor, supervision, materials, and transportation necessary to prepare, relocate, and clean broken-down airfield equipment. This includes removing attachments, transporting equipment between designated locations, reinstalling attachments, and ensuring the equipment meets airfield cleanliness specifications. All work shall be located on Fort Drum, NY. 1.1.1. BACKGROUND INFORMATION: Equipment stationed at the airfield occasionally breaks down and requires transport to a separate maintenance yard. To ensure safe transport on installation roads, various attachments must be removed prior to relocation and reinstalled upon return. Historical repair requirements vary widely; anywhere from five (5) to 30 per year. Repair times also vary widely; anywhere from a few days to several months. 1.2. HOURS OF OPERATION: Contractor operating hours shall be consistent with normal core duty hours of Fort Drum unless otherwise directed by the Contracting Officer (KO) or the Contracting Officer Representative (COR). Normal core duty hours are 7:30 AM – 3:30 PM, Monday through Friday, excluding Government holidays. 1.3. CONTRACTOR PERSONNEL: For the purpose of this contract, the term “Contractor personnel” applies to all Contractor employees, Subcontractor employees, or any other person(s) acting for or on behalf of the Contractor to perform work on this contract.
1.3.1. Project Manager: Prior to contract performance, the Contractor shall designate in writing, to the KO, a Project Manager (PM), who shall be responsible for the overall management, coordination, and supervision of the work performed. The PM shall have knowledge of the terms and conditions of the contract. This PM shall have full authority to act for the Contractor on all contract matters relating to daily operations of this contract. The PM shall be available, by phone, anytime Contractor personnel are performing services on Fort Drum.
1.3.2. Contractor Employee
1.3.2.1. General Qualifications: Contractor employees shall be trained, qualified, certified and/or licensed under the requirements specified in this contract prior to starting work. The Contractor shall maintain records of training qualifications, certifications, and licenses and provide them to the (KO) upon request. The Contractor shall ensure that the employees remain fully qualified to perform work under this contract. The Contractor shall maintain the
The beginning of the document. Download the full file to read on.